Revised Special Rept 85-01 Re Inoperability of Three Triaxial Peak Accelographs.Installation of Reactor Vessel Head Device Delayed Until 850714 Due to Unforeseen Activities
ML20133K980
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/24/1985
From: Westafer G
FLORIDA POWER CORP.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
3F0785-29, 3F785-29, 85-01, 85-1, NUDOCS 8508120446
Download: ML20133K980 (2)


Text

~ .

0%90%:.Gs "

nogico ., \ S O*

, c3c$h Fknida Power C0RPOHATION July 24,1985 3F0785-29 Dr. 3. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Special Report 85-01 Supplement i Dear Sir Enclosed is Supplement I to Special Report 85-01 which is submitted in accordance with Technical Specification 6.9.2.

Should there be any questions, please contact this of fice.

Sincerely,

' , f. ' -

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Enclosure cc: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 G500120446 050724 PDR ADOCK OD000302 S PDR 1

GENER AL OFFICE 3201 initty.fourin street souin e P.O. Don 14042. St Petersburg, Florida 33133

  • 813-866 5151 [b N[

eJ Q

~ . ..

FLORIDA POWER CORPORATION SUPPLEMENT 1 SPECIAL REPORT 85-01 Special Report 85-01 discussed inoperability of all three triaxial peak accelographs at Crystal River Unit 3 and stated that two of the devices would be repaired by May 24,1985 (device atop the "A" Steam Generator and device atop the Borated Water Storage Tank (BWST)) with the third device repaired by July 18,1985 (device atop the Reactor Vessel (RV)

Head). The Steam Generator and BWST devices have been repaired. The purpose of this supplement is to extend the expected completion date for repairs to the RV Head Device.

Per Special Report 85-01, the RV Head device will be repaired af ter the RV Head is reinstalled. Due to unforeseen activities which occurred since the original date was reported, the RV Head was not reinstalled until July 14, 1985. Several maintenance activities on and around the RV Head must be completed prior to reinstallation of the device. Reinstallation will take place prior to ascension to MODE 4 during recovery from Refuel V.