3F1187-09, Special Rept 87-04:Tech Spec 3.3.3.10 Violated.Caused by Removal of Waste Gas Decay Tank Hydrogen & Oxygen Monitors from Svc & Not Returned to Operable Status within 14 Days. Monitors Will Remain Out of Svc Until Sys in Use

From kanterella
Jump to navigation Jump to search
Special Rept 87-04:Tech Spec 3.3.3.10 Violated.Caused by Removal of Waste Gas Decay Tank Hydrogen & Oxygen Monitors from Svc & Not Returned to Operable Status within 14 Days. Monitors Will Remain Out of Svc Until Sys in Use
ML20236R293
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/18/1987
From: Eric Simpson
FLORIDA POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
3F1187-09, 3F1187-9, 87-04, 87-4, NUDOCS 8711230206
Download: ML20236R293 (2)


Text

' ,,

640 f 13 8 M $

99

&ef@1@oC$;g $!

e@@@

Florida Power C O R PO R AT IO N November 18, 1987 3F1187-09 U. S. Nuclear Regulatory Ccunission l Attention: Document Control Desk Washington, D. C. 20555 l

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Special Report 87-04

Dear Sir:

Enclosed is Special Report 87-04 which is submitted in accordance with 'Ibchnical Specification 6.9.2.b.

Should there be any questions, please contact this offi .  !

4 Sincerely, MA k E. C. Simpson, Director Nuclear Operations Site Support i WIR: rag Enclosure xc: Dr. J. Nelson Grace l Regional 7 administrator, Region II I 1

Mr. T. F. Stetka Senior Resident Inspector i

I l

1 8711230206 871118 PDR ADOCK 05000302 S _PDR .  !

A Florida Progress Company

$ fY ifl

Subject:

Special Report 87-04 Crystal River Unit 3 Technical Specification 3.3.3.10 requires that the Waste Gas Decay Tanks have one hyi+i ard one oxygen monitorirg channel operable in all modes. The Action Statement associated with this Technical Specification requires subnittal of a special report if these monitors are inoperable and cannot be returned to operable status within 14 days. The Waste Gas Decay Tank hy& @ i and oxygen nonitors were removed frun service on October 19, 1987 and were not returned to operable status within 14 days.

Crystal River Unit 3 was shut down for a refueling outage on September 19, 1987. The waste Gas Mr and Waste Gas Decay Tanks are depressurized and out of service for maintenance and modifications. With the system depressurized, the hydrogen and oxygen monitors have nothing to sanple, so they were removed from service. They will remain out of service until the Waste Gas System is in use again.