05000368/LER-1982-020, Forwards LER 82-020/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-020/03L-0
ML20063E401
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/25/1982
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20063E405 List:
References
2CAN068206, 2CAN68206, NUDOCS 8207130411
Download: ML20063E401 (1)


LER-2082-020, Forwards LER 82-020/03L-0
Event date:
Report date:
3682082020R00 - NRC Website

text

'

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK, ARKANSAS 72203 [501) 371-4000 June 25, 1982

[

2CAN068206 i 'f)

Mr. W. C. Seidle, Chief 8L O$902 Reactor Project Branch #2 U L-U. S. Nuclear Regulatory Commission J, Region IV <

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Subject:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Licensee Event Report

.No. 82-020/03L-0 (File: 2-0520)

Gentlemen:

In accordance with Arkansas Nuclear One - Unit 2 Technical Specification 6.9.1.9.b, attached is the subject report concerning the voltage drop of Battery Bank 2001 which was below technical specification requirements.

Very truly yours, ff John R. Marshall Manager, Licensing JRM:GAC: s1 Attachment cc: Mr. Richard C. DeYoung Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission hp Washington, D. C. 20555 \'sd@

Mr. Norman M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C. 20555 r207130411 820625 hDR ADOCK 05000 S

MEMBEF1 MIDDLE SOUTH UTILITIEG GYSTEM