05000313/LER-1982-010, Forwards LER 82-010/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-010/03L-0
ML20054G758
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/08/1982
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20054G759 List:
References
1CAN068203, 1CAN68203, NUDOCS 8206220271
Download: ML20054G758 (1)


LER-2082-010, Forwards LER 82-010/03L-0
Event date:
Report date:
3132082010R00 - NRC Website

text

4 e

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72233 [5011371-4000 June 8, 1982

~

[M(5' f M { i\lf/ll 'if ICAN068203 .

I' JUN I T l982 h Mr. W. C. Seidle, Chief  ;

Reactor Project Branch #2 L O U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Licensee Event Report No. 82-010/03L-0 (File: 0520)

Gentlemen:

In accordance with Arkansas Nuclear One - Unit 1 Technical Specification 6.12.3.2.b, attached is the subject report concerning a failure of the standby Hydrogen Purge System.

Very truly yours, John R. Marshall Manager, Licensing JRM:GAgsc l Attachment l

1 cc: Mr. Richard C. DeYoung Office of Inspection and Enforcement l U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l

l Mr. Norman M. Haller, Director Office of Management & Program Analysis l U. S. Nuclear Regulatory Commission Washington, D. C. 20555 h6 b 8206220271 820608 PDR ADOCK 05000313 S PDR MEMBE A MIDDLE SOUTH UTILITIES SYSTEV