05000313/LER-1982-020, Forwards LER 82-020/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-020/03L-0
ML20063E960
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/19/1982
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20063E963 List:
References
1CAN088209, 1CAN88209, NUDOCS 8208310099
Download: ML20063E960 (1)


LER-2082-020, Forwards LER 82-020/03L-0
Event date:
Report date:
3132082020R00 - NRC Website

text

,

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501)371-4000 August 19, 1982 1CAN088209 Mr. W. C. Seidle, Chief Reactor Project Branch #2 U. S. Nuclear Regulatory Commission '

Region IV i NE 2 51982 611 Ryan Plaza Drive, Suite 1000 bo ll IJ) jl.

Arlington, Texas 76011 ,-

'~

Subject:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Licensee Event Report No. 82-020/03L-0 (File: 0520)

Gentlemen:

In accordance with Arkansas Nuclear One - Unit 1 Technical Specification 6.12.3.2.b, attached is the subject report concerning a failure of a control rod drive mechanism (CRDM) while at 100% full power.

Very truly yours, 2

J hn R. Marshall Manager, Licensing JRMIGAC:s1 Attachment cc: Mr. Richard C. DeYoung Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Norman M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C. 20555 b

h 5

r200310099 820819 PDR ADOCK 05000313 MEMDE A MsOOt.E SOUTH UTiuTIES SYSTEM S PDR