Regarding Manual Reactor Trip from Power in Response to Feedwater Regulating Valve Failing Closed
ML091330228
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/12/2009
From: David Bice
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2CAN050903 LER 09-001-00
Download: ML091330228 (5)


LER-2009-001, Regarding Manual Reactor Trip from Power in Response to Feedwater Regulating Valve Failing Closed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)(viii)(A)

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition

10 CFR 50.73(a)(2)(viii)(B)

10 CFR 50.73(a)(2)(iii)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
3682009001R00 - NRC Website

text

2CAN050903 May 12, 2009 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Licensee Event Report 50-368/2009-001-00 Arkansas Nuclear One - Unit 2 Docket Nos. 50-368 License Nos. NPF-6

Dear Sir or Madam:

In accordance with 10 CFR 50.73(a)(2)(iv)(A), enclosed is the subject report concerning a manual reactor trip from power.

There are no new commitments contained in this submittal.

Sincerely, DBB/dce Enclosure Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-5338 David B. Bice Acting Manager, Licensing Arkansas Nuclear One

2CAN050903 Page 2 cc:

Mr. Elmo Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, GA 30339-5957 LEREvents@inpo.org

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION (9-2007)

LICENSEE EVENT REPORT (LER)

(See reverse for required number of digits/characters for each block)

APPROVED BY OMB NO. 3150-0104 EXPIRES 8/31/2010 Estimated burden per response to comply with this mandatory information collection request:

80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. Reported lessons learned are incorporated into the licensing process and fed back to industry. Send comments regarding burden estimate to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to bjs1@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0104), Office of Management and Budget, Washington, DC 20503. If a means used to impose information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

3. PAGE Arkansas Nuclear One - Unit 2 05000368 1

OF 3

4. TITLE Manual Reactor Trip from Power In Response To Feedwater Regulating Valve Failing Closed
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR SEQUENTIAL NUMBER REV NO MONTH DAY YEAR FACILITY NAME DOCKET NUMBER 03 13 2009 2009 - 001 - 00 05 12 2009
9. OPERATING MODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) 20.2201(b) 20.2203(a)(3)(i) 50.73(a)(2)(i)(C) 50.73(a)(2)(vii) 20.2201(d) 20.2203(a)(3)(ii) 50.73(a)(2)(ii)(A) 50.73(a)(2)(viii)(A) 20.2203(a)(1) 20.2203(a)(4) 50.73(a)(2)(ii)(B) 50.73(a)(2)(viii)(B) 1 20.2203(a)(2)(i) 50.36(c)(1)(i)(A) 50.73(a)(2)(iii) 50.73(a)(2)(ix)(A)
10. POWER LEVEL 20.2203(a)(2)(ii) 50.36(c)(1)(ii)(A) 50.73(a)(2)(iv)(A) 50.73(a)(2)(x) 20.2203(a)(2)(iii) 50.36(c)(2) 50.73(a)(2)(v)(A) 73.71(a)(4) 20.2203(a)(2)(iv) 50.46(a)(3)(ii) 50.73(a)(2)(v)(B) 73.71(a)(5) 20.2203(a)(2)(v) 50.73(a)(2)(i)(A) 50.73(a)(2)(v)(C) 84%

20.2203(a)(2)(vi) 50.73(a)(2)(i)(B) 50.73(a)(2)(v)(D)

OTHER-Specify in Abstract below or in

D. Corrective Actions

Immediate corrective actions included the replacement and diagnostic testing of the positioner, and particulate and moisture testing of the air supply to the valve.

E. Safety Significance

All safety systems were available and performed as designed. There was no radiological release to the public and the event presented no equipment safety or industrial safety issues. The Safety Significance of this event is low.

F. Basis for Reportability A manual reactor trip from power in response to actual plant conditions is reportable pursuant to 10 CFR 50.73(a)(2)(iv)(A).

G. Additional Information

There were no previous similar events reported as Licensee Event Reports by ANO.

Energy Industry Identification System (EIIS) codes are identified in the test as [XX].