 Issue dateTitleTopic
ML20217L93720 October 1999Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program
ML17355A44730 September 1999Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr
ML17355A41231 August 1999Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr
ML17355A39831 July 1999Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr
ML17355A38920 July 1999LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr
ML17355A38430 June 1999Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr
ML17355A36830 June 1999Revised Update to Topical QA Rept, Dtd June 1999Safe Shutdown
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Coatings
Nondestructive Examination
Condition Adverse to Quality
License Renewal
Control of Heavy Loads
Early Warning Fire Detection
ML17355A36130 June 1999Refueling Outage ISI Rept.Boric Acid
Hydrostatic
VT-2
Liquid penetrant
ML17355A35131 May 1999Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr
ML17355A33330 April 1999Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr
ML20217B9878 April 1999Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408Safe Shutdown
Boric Acid
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Internal Flooding
Nondestructive Examination
Exemption Request
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Backfit
Power Uprate
ML17355A2885 April 1999COLR for Turkey Point Unit 4 Cycle 18.
ML17355A29131 March 1999Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr
ML17355A25528 February 1999Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr
ML17355A22631 January 1999Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr
ML17355A22020 January 1999Refueling Outage ISI Rept.
ML17355A19131 December 1998Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr
ML18008A04630 November 1998Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr
ML17354B19218 November 1998LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 LtrStroke time
Breakaway torque
ML17354B1899 November 1998Simulatory Certification Update 2.Shutdown Margin
Fuel cladding
ML17354B19031 October 1998Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr
ML17354B15923 October 1998COLR for Turkey Point Unit 3 Cycle 17.
ML17354B13616 October 1998LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr
ML17354B13130 September 1998Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr
ML17354B0979 September 1998Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils
ML17354B09831 August 1998Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr
ML17354B07731 July 1998Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr
ML17354B03415 July 1998LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of ValvesMissed surveillance
ML17354B02430 June 1998Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr
ML17354B01729 June 1998Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire.Safe Shutdown
Enforcement Discretion
Missed surveillance
ML17354A98418 June 1998LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps
ML17354A9749 June 1998LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays
ML20248F74431 May 1998Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity
ML17354A97131 May 1998Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr
ML17354A92330 April 1998Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr
ML17354A88231 March 1998Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr
ML17354A85124 March 1998LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR
ML17354B00018 March 1998Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998Safe Shutdown
Boric Acid
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Coatings
Nondestructive Examination
Condition Adverse to Quality
License Renewal
Exemption Request
Control of Heavy Loads
Fire Protection Program
Early Warning Fire Detection
ML17354A84418 March 1998LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 LtrCoatings
ML17354A83128 February 1998Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr
ML17354A78731 January 1998Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr
ML17354A75831 December 1997Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr
ML17354A73612 December 1997LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr
ML17354A73830 November 1997Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr
ML17354A72131 October 1997Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr
ML17354A74913 October 1997SG Insp Rept.
ML17354A88513 October 1997FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013.Safe Shutdown
Boric Acid
Shutdown Margin
Fire Barrier
Coatings
Temporary Modification
Severe Accident Management Guideline
Fuel cladding
Liquid penetrant
Through-Wall Leak
Continuous fire watch
Fire Protection Program
Fire Watch
Scaffolding
Power Uprate
ML17354A6808 October 1997LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 LtrHigh Radiation Area
Foreign Material Exclusion
ML17354A6796 October 1997COLR Unit 4 Cycle 17, for Turkey Point
ML17354A68130 September 1997Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr