Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 -NRC Inspection Report 05000369/2018005 and 05000370/2018005
ML18232A338
Person / Time
Site: Mcguire, McGuire  Duke energy icon.png
Issue date: 08/20/2018
From: Frank Ehrhardt
NRC/RGN-II/DRP/RPB1
To: Teresa Ray
Duke Energy Carolinas
References
IR 2018005
Download: ML18232A338 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ust 20, 2018

SUBJECT:

UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2018005 AND 05000370/2018005)

Dear Mr. Ray:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for McGuire Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 Enclosure:

McGuire Inspection Activity Plan (09/01/2018 - 06/30/2020)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2018005 AND 05000370/2018005)

August 20, 2018 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession No. ML18232A338 OFFICE RII/DRP RI/DRP RII/DRP NAME JWorosilo MToth FEhrhardt DATE 8/14/2018 8/13/2018 8/13/2018 OFFICIAL AGENCY RECORD

IP 22 Inspection Activity Plan Report McGuire 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count UNIT 2 POST-APPROVAL LR PHASE 1 2 2 09/17/2018 09/21/2018 IP 71003 000687 Post-Approval Site Inspection for License Renewal 2 09/24/2018 09/28/2018 IP 71003 000687 Post-Approval Site Inspection for License Renewal UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 09/17/2018 09/21/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR 2 09/24/2018 09/28/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 1 3 1, 2 09/24/2018 09/28/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 09/24/2018 09/28/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 09/24/2018 09/28/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/24/2018 09/28/2018 IP 71124.04 000728 Occupational Dose Assessment 1, 2 09/24/2018 09/28/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 2 2 1, 2 10/15/2018 10/19/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/15/2018 10/19/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/15/2018 10/19/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/15/2018 10/19/2018 IP 71124.04 000728 Occupational Dose Assessment 1, 2 10/15/2018 10/19/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation DUKE CORP AA/FFD/SGI SECURITY INSPECTION 2 1, 2 11/05/2018 11/09/2018 IP 71130.01 000733 Access Authorization 1, 2 11/05/2018 11/09/2018 IP 71130.06 000738 Protection of Safeguards Information 1, 2 11/05/2018 11/09/2018 IP 71130.08 000740 Fitness For Duty Program TARGET SET 2 1, 2 11/12/2018 11/16/2018 IP 71130.14 000743 Review of Power Reactor Target Sets SECURITY BASELINE INSPECTION 1 1, 2 11/26/2018 11/30/2018 IP 71130.01 000733 Access Authorization 1, 2 11/26/2018 11/30/2018 IP 71130.06 000738 Protection of Safeguards Information 1, 2 11/26/2018 11/30/2018 IP 71130.08 000740 Fitness For Duty Program This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

Enclosure

IP 22 Inspection Activity Plan Report McGuire 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count FORCE-ON-FORCE PLANNING AND EXERCISE 7 1, 2 01/14/2019 01/18/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 02/04/2019 02/08/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing UNIT 1 POST-APPROVAL LR PHASE 1 2 1 04/01/2019 04/04/2019 IP 71003 000687 Post-Approval Site Inspection for License Renewal UNIT 1 IN-SERVICE INSPECTION 1 1 04/01/2019 04/05/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL RAD SAFETY RAD HAZARDS BASELINE INSPECTION 1 1, 2 04/01/2019 04/05/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3 1, 2 07/15/2019 07/19/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments SECURITY BASELINE INSPECTION 1 1, 2 07/15/2019 07/19/2019 IP 71130.02 000734 Access Control 1, 2 07/15/2019 07/19/2019 IP 71151 001338 Performance Indicator Verification RP OCCUPATIONAL RAD SAFETY RAD HAZARDS & TRANSPORTATION BASELINE INSPECTION & PIV 3 1, 2 07/22/2019 07/26/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/22/2019 07/26/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/22/2019 07/26/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EMERGENCY PREPAREDNESS EXERCISE 5 1, 2 08/12/2019 08/16/2019 IP 71114.01 000716 Exercise Evaluation 1, 2 08/12/2019 08/16/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 08/12/2019 08/16/2019 IP 71151 001397 Performance Indicator Verification MCGUIRE INITIAL LICENSE EXAM 3 1, 2 01/13/2020 01/17/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 02/17/2020 02/28/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 1 3 1, 2 03/09/2020 03/13/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report McGuire 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 1 3 1, 2 03/09/2020 03/13/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/09/2020 03/13/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/09/2020 03/13/2020 IP 71124.04 000729 Occupational Dose Assessment 1, 2 03/09/2020 03/13/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation UNIT 2 IN-SERVICE/SG IN-SERVICE INSPECTION 2 2 03/16/2020 03/20/2020 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 2 2 1, 2 03/23/2020 03/27/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/23/2020 03/27/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/23/2020 03/27/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/23/2020 03/27/2020 IP 71124.04 000729 Occupational Dose Assessment 1, 2 03/23/2020 03/27/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation POST-APPROVAL LR PHASE 2 5 1, 2 06/08/2020 06/12/2020 IP 71003 000687 Post-Approval Site Inspection for License Renewal 1, 2 06/22/2020 06/26/2020 IP 71003 000687 Post-Approval Site Inspection for License Renewal MCGUIRE REQUAL INSPECTION 2 1, 2 06/15/2020 06/19/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 3 1, 2 06/22/2020 06/26/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.