UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 2, 2014 Steven D. Capps Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2014006 AND 05000370/2014006)

Dear Mr. Capps:

On August 14, 2014, the NRC completed its mid-cycle performance review of the McGuire Nuclear Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, McGuire Nuclear Station was operated in a manner that preserved public health and safety and met all cornerstone objectives. The performance at McGuire Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2015. The NRC will also be conducting initial operator licensing examinations. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence.

S. Capps 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Please contact me at 404-997-4551 with any questions you have regarding this letter.

Sincerely,

/RA/

Gerald J. McCoy, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17

Enclosure:

McGuire Inspection/Activity Plan (09/01/2014 - 12/31/2015) cc distribution via ListServ

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE CWR /RA/ Via email GJM /RA/

NAME CRapp JZeiler GMcCoy DATE 08/26/2014 08/25/2014 09/02/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO S. Capps 3 Letter to Steven D. Capps from Gerald J. McCoy dated September 2, 2014

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2014006 AND 05000370/2014006)

DISTRIBUTION:

D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 McGuire 09/02/2014 09:38:26 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL BASELINE 3 1, 2 09/15/2014 09/19/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/15/2014 09/19/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/15/2014 09/19/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/15/2014 09/19/2014 IP 71124.04 Occupational Dose Assessment 1, 2 09/15/2014 09/19/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/15/2014 09/19/2014 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 09/22/2014 09/26/2014 IP 7111108P Inservice Inspection Activities - PWR EP - EP PROGRAM INSPECTION 3 1, 2 09/22/2014 09/26/2014 IP 7111402 Alert and Notification System Testing 1, 2 09/22/2014 09/26/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 09/22/2014 09/26/2014 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 09/22/2014 09/26/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 09/22/2014 09/26/2014 IP 71151 Performance Indicator Verification RP - RP OCCUPATIONAL BASELINE WEEK2 3 1, 2 09/29/2014 10/03/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/29/2014 10/03/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/29/2014 10/03/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/29/2014 10/03/2014 IP 71124.04 Occupational Dose Assessment 1, 2 09/29/2014 10/03/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/29/2014 10/03/2014 IP 71151 Performance Indicator Verification HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 03/09/2015 03/13/2015 IP 7111107T Heat Sink Performance CDBI - COMPONENT DESIGN BASES INSPECTION 10 1, 2 04/06/2015 04/10/2015 IP 7111121 Component Design Bases Inspection 1, 2 04/27/2015 05/01/2015 IP 7111121 Component Design Bases Inspection 1, 2 05/11/2015 05/15/2015 IP 7111121 Component Design Bases Inspection 1, 2 06/01/2015 06/05/2015 IP 7111121 Component Design Bases Inspection RP - RP PUBLIC RAD SAFETY BASELINE 2 1, 2 06/22/2015 06/26/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/22/2015 06/26/2015 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/22/2015 06/26/2015 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 McGuire 09/02/2014 09:38:26 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP EXERCISE 5 1, 2 08/03/2015 08/07/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/03/2015 08/07/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1, 2 08/03/2015 08/07/2015 IP 71151 Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 09/21/2015 09/25/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2 09/21/2015 09/25/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/21/2015 09/25/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 09/21/2015 09/25/2015 IP 71151 Performance Indicator Verification TFPI - TRIENNIAL FIRE PROTECTION INSP 4 1, 2 11/16/2015 11/20/2015 IP 7111105x Fire Protection - NFPA 805 (Triennial) 1, 2 12/07/2015 12/11/2015 IP 7111105x Fire Protection - NFPA 805 (Triennial)

This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.