Inspection / Activity Plan Page 1 of 1 03/03/2010 08:16:23 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site 07200038 - DUKE POWER CO.
- MCGUIRE MAGNASTORE WELDING DEMONSTRATION 2
1 IP Preoperational Testing Of An ISFSI 60854 07/12/2010 07/16/2010 ISFSI
- MCGUIRE MAGNASTORE DRY RUN 5
1 IP Preoperational Testing Of An ISFSI 60854 08/09/2010 08/13/2010 ISFSI
- MCGUIRE MAGNASTORE FIRST CAMPIAGN 5
1 IP Operation Of An ISFSI 60855 08/23/2010 08/23/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.