Enclosure 2 - Inspection/Activity Plan Report 22 ISFSI
ML100620060
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/03/2010
From:
Division Reactor Projects II
To:
Shared Package
ML100620050 List:
References
IR-10-001
Download: ML100620060 (1)


Text

Inspection / Activity Plan Page 1 of 1 03/03/2010 08:16:23 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site 07200038 - DUKE POWER CO.

ISFSI

- MCGUIRE MAGNASTORE WELDING DEMONSTRATION 2

1 IP Preoperational Testing Of An ISFSI 60854 07/12/2010 07/16/2010 ISFSI

- MCGUIRE MAGNASTORE DRY RUN 5

1 IP Preoperational Testing Of An ISFSI 60854 08/09/2010 08/13/2010 ISFSI

- MCGUIRE MAGNASTORE FIRST CAMPIAGN 5

1 IP Operation Of An ISFSI 60855 08/23/2010 08/23/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.