Page 1 of 2 McGuire 03/03/2010 07:09:12 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PB1-INSP - SUPPLEMENTAL FOR WHITE RN FOULING 1 1, 2 03/01/2010 03/05/2010 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 1 2 1, 2 03/15/2010 03/19/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/15/2010 03/19/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/15/2010 03/19/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/15/2010 03/19/2010 IP 71124.04 Occupational Dose Assessment 1, 2 03/15/2010 03/19/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/15/2010 03/19/2010 IP 71151 Performance Indicator Verification EB3ISI - UNIT 1 ISI 1 1 03/22/2010 03/26/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 TI-172 RCS DM BUTT WELDS 1 1, 2 03/22/2010 03/26/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 3 1, 2 03/29/2010 04/02/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/29/2010 04/02/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/29/2010 04/02/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/29/2010 04/02/2010 IP 71124.04 Occupational Dose Assessment 1, 2 03/29/2010 04/02/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/29/2010 04/02/2010 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 2 1, 2 06/07/2010 06/11/2010 IP 7111111B Licensed Operator Requalification Program OL EXAM - INITIAL PREP EXAM 5 1 07/05/2010 07/09/2010 V23332 MCGUIRE/AUGUST 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 5 1 08/02/2010 08/06/2010 V23332 MCGUIRE/AUGUST 2010 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 08/16/2010 08/20/2010 IP 7111402 Alert and Notification System Evaluation 1, 2 08/16/2010 08/20/2010 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 08/16/2010 08/20/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/16/2010 08/20/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 08/16/2010 08/20/2010 IP 71151 Performance Indicator Verification EB1-MODS - MODIFICATIONS - 10CFR50.59 4 1, 2 08/30/2010 09/03/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 09/13/2010 09/17/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure 1

Page 2 of 2 McGuire 03/03/2010 07:09:12 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 10/04/2010 10/08/2010 IP 71152B Identification and Resolution of Problems 1, 2 10/18/2010 10/22/2010 IP 71152B Identification and Resolution of Problems EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 03/14/2011 03/18/2011 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP RADIOLOGICAL HAZARD ASSESSMENT 1 1, 2 04/04/2011 04/08/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls TI-177 - TI-177 GAS INTRUSION 2 1, 2 05/02/2011 05/06/2011 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System OL EXAM - INITIAL EXAM PREP 3 1 05/23/2011 05/27/2011 V23350 MCGUIRE/MAY 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 1 06/13/2011 06/17/2011 V23350 MCGUIRE/MAY 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 1 06/20/2011 06/24/2011 V23350 MCGUIRE/MAY 2011 EXAM AT POWER FACILITIES PSB1-RP - RP PUBLIC RADIATION PROTECTION INSP 3 1, 2 06/27/2011 07/01/2011 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 06/27/2011 07/01/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/27/2011 07/01/2011 IP 71124.07 Public Radiation Safety 1, 2 06/27/2011 07/01/2011 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.