ML18059A093

From kanterella
Jump to navigation Jump to search
EOC Assessment Letter
ML18059A093
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 02/28/2018
From: Frank Ehrhardt
NRC/RGN-II/DRP/RPB1
To: Teresa Ray
Duke Energy Carolinas
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18059A093 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 28, 2018 Mr. Thomas D. Ray Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/2017006 AND 05000370/2017006, REPORT 05000369/2017402 AND 05000370/2017402, REPORT 05000369/2017501 AND 05000370/2017501

Dear Mr. Ray:

The Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of McGuire Nuclear Station Units 1 and 2, reviewing performance indicators (PIs),

inspection results, and enforcement actions from January 1, 2017, through December 31, 2017.

This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at McGuire Nuclear Station Units 1 and 2 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

T. Ray 2 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17

Enclosure:

McGuire Inspection/Activity Plan (03/01/2018 - 12/31/2019) cc Distribution via ListServ

ML18059A093 OFFICE RII: DRP RII: DRP RII: DRP NAME MToth JWorosilo FEhrhardt DATE 2/23/2018 2/23/2018 2/26/2018 IP 22 Inspection Activity Plan Report McGuire 03/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2 02/26/2018 03/02/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

MCGUIRE INITIAL LICENSE EXAM 3 1, 2 03/19/2018 03/23/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV) 1, 2 04/16/2018 04/27/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

TRIENNIAL FIRE PROTECTION INSPECTION 5 1, 2 04/30/2018 05/04/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial) 1, 2 05/14/2018 05/18/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

CYBER SECURITY 4 1, 2 06/11/2018 06/15/2018 IP 71130.10P 000741 Cyber Security 1, 2 06/25/2018 06/29/2018 IP 71130.10P 000741 Cyber Security MCGUIRE REQUAL INSPECTION 2 1, 2 06/18/2018 06/22/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial EP PROGRAM INSPECTION 2 1, 2 06/18/2018 06/22/2018 IP 71114.02 000717 Alert and Notification System Testing 1, 2 06/18/2018 06/22/2018 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 06/18/2018 06/22/2018 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 06/18/2018 06/22/2018 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/18/2018 06/22/2018 IP 71151 001397 Performance Indicator Verification TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 06/25/2018 06/29/2018 IP 71111.07T 000700 Heat Sink Performance -Triennial PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 07/09/2018 07/13/2018 IP 71152B 000747 Problem Identification and Resolution 1, 2 07/23/2018 07/27/2018 IP 71152B 000747 Problem Identification and Resolution This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

Enclosure

IP 22 Inspection Activity Plan Report SECURITY BASELINE INSPECTION 2 1, 2 07/16/2018 07/20/2018 IP 71130.02 000734 Access Control 1, 2 07/16/2018 07/20/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/16/2018 07/20/2018 IP 71130.07 000739 Security Training 1, 2 07/16/2018 07/20/2018 IP 71151 001338 Performance Indicator Verification UNIT 2 POST-APPROVAL LR PHASE 1 2 2 09/24/2018 09/28/2018 IP 71003 000687 Post-Approval Site Inspection for License Renewal UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 09/24/2018 09/28/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL - WEEK 1 3 1, 2 09/24/2018 09/28/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 09/24/2018 09/28/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 09/24/2018 09/28/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/24/2018 09/28/2018 IP 71124.04 000728 Occupational Dose Assessment 1, 2 09/24/2018 09/28/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 09/24/2018 09/28/2018 IP 71151 000746 Performance Indicator Verification TARGET SET 2 1, 2 10/15/2018 10/19/2018 IP 71130.14 000743 Review of Power Reactor Target Sets RP OCCUPATIONAL - WEEK 2 2 1, 2 10/15/2018 10/19/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/15/2018 10/19/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/15/2018 10/19/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/15/2018 10/19/2018 IP 71124.04 000728 Occupational Dose Assessment 1, 2 10/15/2018 10/19/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 10/15/2018 10/19/2018 IP 71151 000746 Performance Indicator Verification DUKE CORP AA/FFD/SGI SECURITY INSPECTION 2 1, 2 11/05/2018 11/09/2018 IP 71130.01 000733 Access Authorization 1, 2 11/05/2018 11/09/2018 IP 71130.06 000738 Protection of Safeguards Information 1, 2 11/05/2018 11/09/2018 IP 71130.08 000740 Fitness For Duty Program SECURITY BASELINE INSPECTION 1 1, 2 12/10/2018 12/14/2018 IP 71130.01 000733 Access Authorization 1, 2 12/10/2018 12/14/2018 IP 71130.06 000738 Protection of Safeguards Information 1, 2 12/10/2018 12/14/2018 IP 71130.08 000740 Fitness For Duty Program This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

Enclosure

IP 22 Inspection Activity Plan Report FORCE-ON-FORCE PLANNING AND EXERCISES 7 1, 2 01/14/2019 01/18/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 02/04/2019 02/08/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing UNIT 1 POST-APPROVAL LR PHASE 1 2 1 04/01/2019 04/04/2019 IP 71003 000687 Post-Approval Site Inspection for License Renewal UNIT 1 IN-SERVICE INSPECTION 1 1 04/01/2019 04/05/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RAD HAZARDS 1 1, 2 04/01/2019 04/05/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3 1, 2 07/15/2019 07/19/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments SECURITY BASELINE INSPECTION 1 1, 2 07/15/2019 07/19/2019 IP 71130.02 000734 Access Control 1, 2 07/15/2019 07/19/2019 IP 71151 001338 Performance Indicator Verification RP PUBLIC 3 1, 2 07/22/2019 07/26/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/22/2019 07/26/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/22/2019 07/26/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 07/22/2019 07/26/2019 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

Enclosure