UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 4, 2012 Mr. Steven D. Capps Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078

SUBJECT:

MID-CYCLE LETTER FOR MCGUIRE NUCLEAR STATION UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000369/2012006 AND 05000370/2012006)

Dear Mr. Capps:

On August 14, 2012, the NRC completed its mid-cycle performance review of McGuire Nuclear Station Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the IMC 0305, Reactor Oversight Process.ROP performance assessment program governed by IMC 0305, Operating Reactor Assessment Program.

The NRC determined the performance at McGuire Unit 1 and Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to ROP baseline inspections, we will conduct initial reactor operator examinations and, consistent with the Agencys actions related to Fukushima, TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

S. Capps 2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4607 with any questions you have regarding this letter.

Sincerely,

/RA/

Jonathan H. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17

Enclosure:

Catawba Inspection/Activity Plan (09/01/2012 - 12/31/2013) cc w/Encl: (See page 3)

X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP SIGNATURE JHB /RA/

NAME JBartley DATE 08/24/2012 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

S. Capps 3

cc w/encl:

Charles J. Morris III Plant Manager McGuire Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Jeffrey J. Nolan Design Engineering Manager McGuire Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution H. Duncan Brewer Organizational Effectiveness Manager McGuire Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Kenneth L. Ashe Regulatory Compliance Manager McGuire Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Kay L. Crane Senior Licensing Specialist McGuire Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Joseph Michael Frisco, Jr.

Vice President Nuclear Design Engineering Duke Energy Carolinas, LLC M. Christopher Nolan Director Regulatory Affairs Duke Energy Carolinas, LLC David A. Cummings Fleet Regulatory Compliance and Licensing Manager (Acting)

Duke Energy Carolinas, LLC Electronic Mail Distribution County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202 Alicia Richardson Licensing Administrative Assistant Duke Energy Carolinas, LLC Electronic Mail Distribution Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution David A. Cummings Associate General Counsel Duke Energy Corporation Electronic Mail Distribution Beth J. Horsley Wholesale Customer Relations Duke Energy Corporation Electronic Mail Distribution David A. Repka Winston Strawn LLP Electronic Mail Distribution W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution

S. Capps 4

Letter to Regis T. Repko from Jonathan H. Bartley dated September 4, 2012

SUBJECT:

MID-CYCLE LETTER FOR MCGUIRE NUCLEAR STATION UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000369/2012006 AND 05000370/2012006)

Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource INPO ROP Reports

McGuire Inspection / Activity Plan 09/01/2012 - 12/31/2013 Unit Number Page 1 of 2 09/04/2012 08:18:49 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 3

PSB1-RP

- OCCUPATIONAL RP BASELINE WK1 1, 2 09/17/2012 09/21/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/17/2012 09/21/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/17/2012 09/21/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/17/2012 09/21/2012 IP 71124.04 Occupational Dose Assessment 1, 2 09/17/2012 09/21/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/17/2012 09/21/2012 IP 71151 Performance Indicator Verification 2

EB3 ISI

- UNIT 2 INSERVICE INSPECTION & RPVH EXAMS 2

09/24/2012 09/28/2012 IP 7111108P Inservice Inspection Activities - PWR 2

EB3SGISI

- UNIT 2 SG INSERVICE INSPECTION 2

10/01/2012 10/05/2012 IP 7111108P Inservice Inspection Activities - PWR 3

PSB1-RP

- OCCUPATIONAL RP BASELINE WK2 1, 2 10/01/2012 10/05/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/01/2012 10/05/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/01/2012 10/05/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/01/2012 10/05/2012 IP 71124.04 Occupational Dose Assessment 1, 2 10/01/2012 10/05/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 10/01/2012 10/05/2012 IP 71151 Performance Indicator Verification 1

TI-188

- TI-188 P2 - NTTF 2.3 - SEISMIC WALKDOWNS 1, 2 10/10/2012 10/10/2012 IP 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 2

PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1, 2 11/05/2012 11/09/2012 IP 7111402 Alert and Notification System Testing 1, 2 11/05/2012 11/09/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 11/05/2012 11/09/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 11/05/2012 11/09/2012 IP 71151 Performance Indicator Verification 2

ISFSI

- ISFSI MAGNASTOR INITIAL CAMPAIGN 1, 2 01/21/2013 01/25/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 2

PSB1-RP

- RAD HAZARDS ANALYSIS AND TRANSPORTATION 1, 2 03/18/2013 03/22/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/18/2013 03/22/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/18/2013 03/22/2013 IP 71151 Performance Indicator Verification 2

ISI

- UNIT 1 INSERVICE INSPECTION 1

03/25/2013 03/29/2013 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

McGuire Inspection / Activity Plan 09/01/2012 - 12/31/2013 Unit Number Page 2 of 2 09/04/2012 08:18:49 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 1

SGISI

- UNIT 1 SG INSERVICE INSPECTION 1

04/01/2013 04/05/2013 IP 7111108P Inservice Inspection Activities - PWR 5

MCG TFPI

- MCG - TRIENNIAL FIRE PROTECTION INSP 1, 2 07/01/2013 07/03/2013 IP 7111105T Fire Protection [Triennial]

1, 2 07/22/2013 07/26/2013 IP 7111105T Fire Protection [Triennial]

1, 2 08/05/2013 08/09/2013 IP 7111105T Fire Protection [Triennial]

3 PSB1-RP

- RP PUBLIC RAD SAFETY BASELINE 1, 2 07/08/2013 07/12/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/08/2013 07/12/2013 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/08/2013 07/12/2013 IP 71151 Performance Indicator Verification 1

EP

- EMERGENCY PREPAREDNESS EXERCISE 1, 2 08/05/2013 08/09/2013 IP 7111401 Exercise Evaluation 1, 2 08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification 3

MODS

- PERM MODS 50.59 INSPECTION 1, 2 10/14/2013 10/18/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 10/28/2013 11/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 3

OL EXAM

- INITIAL EXAM PREP 1

11/04/2013 11/08/2013 V23402 MCGUIRE/SEPTEMBER 2012 INITIAL EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM WEEK 1 1

12/02/2013 12/06/2013 V23402 MCGUIRE/SEPTEMBER 2012 INITIAL EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM WEEK 2 1

12/09/2013 12/13/2013 V23402 MCGUIRE/SEPTEMBER 2012 INITIAL EXAM AT POWER FACILITIES Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure