ML12066A027

From kanterella
Jump to navigation Jump to search
Report 22, Inspection Activity Plan
ML12066A027
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/05/2012
From:
NRC/RGN-II
To:
References
Download: ML12066A027 (2)


Text

Page 1 of 2 McGuire 03/05/2012 08:35:23 Inspection / Activity Plan Report 22 03/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site CDBI - COMPONENT DESIGN BASES INSPECTION 7 1, 2 03/05/2012 03/09/2012 IP 7111121 Component Design Bases Inspection 1, 2 03/19/2012 03/23/2012 IP 7111121 Component Design Bases Inspection 1, 2 04/02/2012 04/06/2012 IP 7111121 Component Design Bases Inspection EB3 HS - TRIENNIAL HEAT SINK INSPECTION 1 1, 2 03/12/2012 03/16/2012 IP 7111107T Heat Sink Performance EB3ISFSI - ISFSI MAGNASTOR DRY RUN 5 1, 2 04/09/2012 04/13/2012 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EB3ISFSI - ISFSI FIRST LOADING CAMPAIGN (MAGNASTOR) 2 1, 2 04/23/2012 04/27/2012 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL RQ - REQUAL INSPECTION 2 1, 2 06/11/2012 06/15/2012 IP 7111111B Licensed Operator Requalification Program TI-182 - TI-182 BURIED PIPING/TANK - PHASE 1 1 1, 2 06/25/2012 06/29/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping OL EXAM - INITIAL EXAM PREP 3 1 07/30/2012 08/03/2012 V23375 MCGUIRE / AUGUST 2012 EXAM AT POWER FACILITIES PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 08/13/2012 08/17/2012 IP 71152B Problem Identification and Resolution 1, 2 08/27/2012 08/31/2012 IP 71152B Problem Identification and Resolution OL EXAM - INITIAL EXAM - WEEK 1 3 1 08/20/2012 08/24/2012 V23375 MCGUIRE / AUGUST 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 1 08/27/2012 08/31/2012 V23375 MCGUIRE / AUGUST 2012 EXAM AT POWER FACILITIES PSB1-RP - OCCUPATIONAL RP BASELINE WK1 3 1, 2 09/17/2012 09/21/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/17/2012 09/21/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/17/2012 09/21/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/17/2012 09/21/2012 IP 71124.04 Occupational Dose Assessment 1, 2 09/17/2012 09/21/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/17/2012 09/21/2012 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 2 INSERVICE INSPECTION & RPVH EXAMS 2 2 09/24/2012 09/28/2012 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 McGuire 03/05/2012 08:35:23 Inspection / Activity Plan Report 22 03/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB3SGISI - UNIT 2 SG INSERVICE INSPECTION 1 2 10/01/2012 10/05/2012 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP BASELINE WK2 3 1, 2 10/01/2012 10/05/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/01/2012 10/05/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/01/2012 10/05/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/01/2012 10/05/2012 IP 71124.04 Occupational Dose Assessment 1, 2 10/01/2012 10/05/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 10/01/2012 10/05/2012 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 2 1, 2 11/05/2012 11/09/2012 IP 7111402 Alert and Notification System Testing 1, 2 11/05/2012 11/09/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 11/05/2012 11/09/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 11/05/2012 11/09/2012 IP 71151 Performance Indicator Verification PSB1-RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2 03/18/2013 03/22/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/18/2013 03/22/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/18/2013 03/22/2013 IP 71151 Performance Indicator Verification ISI - UNIT 1 INSERVICE INSPECTION 2 1 03/25/2013 03/29/2013 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG INSERVICE INSPECTION 1 1 04/01/2013 04/05/2013 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP PUBLIC RAD SAFETY BASELINE 5 1, 2 06/24/2013 06/28/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/24/2013 06/28/2013 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/24/2013 06/28/2013 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.