IR 05000369/2018413

From kanterella
Jump to navigation Jump to search
Williams B. McGuire Nuclear Plant, Units 1 and 2 - U.S. Nuclear Regulatory Commission Security Inspection Report 05000369/2018413 and 05000370/2018413 (Public)
ML18360A486
Person / Time
Site: McGuire, Mcguire  
Issue date: 12/26/2018
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Teresa Ray
Duke Energy Carolinas
References
IR 2018413
Download: ML18360A486 (4)


Text

December 26, 2018

SUBJECT:

WILLIAM B. MCGUIRE NUCLEAR PLANT, UNITS 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000369/2018413 AND 05000370/2018413

Dear Mr. Ray:

On November 15, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your William B. McGuire Nuclear Plant, Unit 1 and Unit 2. The NRC inspectors discussed the results of the inspection with Mr. Jim Glenn, Director Organizational Effectiveness, and other members of your staff. The results of this inspection are documented in the enclosed report.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

The NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555 0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001; and the NRC resident inspector at the William B.

McGuire Nuclear Plant.

OFFICAL USE ONLY One cross-cutting aspect was assigned to a finding in the area of Problem Identification and Resolution, Self Assessment [P.6]. If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; and the NRC resident inspector at the William B. McGuire Nuclear Plant.This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos.: 50-369 & 370 License Nos.: NPF-9 & NPF -17

Enclosure:

Inspection Report 05000369/2018413 and 05000370/2018413 w/Attachment: Supplemental Information

OFFICAL USE ONLY cc:

Kelvin Kinard Security Manager McGuire Nuclear Station, Mail Code MGO1SC 12700 Hagers Ferry Road Huntersville, NC 28078-8985

Terry W. King Duke Energy Carolinas, LLC 526 S. Church Street - EC5ZD Charlotte, NC 28202-1802

__ ML18360A486__

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII: DRP

SIGNATURE DWS5 PJB4 SMS FJE

NAME D. STRICKLAND P. BRAATEN S. SHAEFFER F. Ehrhardt

DATE 12/ 19 /2018 12/19 /2018 12/ 19 /2018 12/ 21 /2018

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO