MONTHYEARML24029A1142024-01-29029 January 2024 Notification of Inspection and Request for Information ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 IR 05000369/20220052022-08-29029 August 2022 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 ML22094A0952022-04-0606 April 2022 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20210062022-03-0202 March 2022 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 (Report 05000369/2021006 and 05000370/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML22010A0732022-01-0606 January 2022 50.59 Inspection Information Request ML21267A2782021-09-23023 September 2021 50.59 Inspection Information Request IR 05000369/20210052021-08-23023 August 2021 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000369/2021005 and 05000370/2021005) IR 05000369/20200062021-03-0303 March 2021 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2020006 and 05000370/2020006 ML21020A0682021-01-20020 January 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000369/2021011 and 05000370/2021011) and Request for Information (RFI) ML20280A6722020-10-0606 October 2020 Notfication of McGuire Nuclear Station Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000369/2021010 and 05000370/2021010 IR 05000369/20200052020-08-17017 August 2020 Updated Inspection Plan for Mcguire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2020005 and 05000370/2020005) IR 05000369/20190062020-03-0303 March 2020 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 - NRC Inspection Report 05000369/2019006 and 05000370/2019006 IR 05000369/20190052019-08-26026 August 2019 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000369/2019005 and 05000370/2019005) IR 05000369/20180062019-03-0404 March 2019 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2018006 and 05000370/2018006 ML18333A0912018-11-29029 November 2018 Op Ess 201801 RFI - SD IR 05000369/20180052018-08-20020 August 2018 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 -NRC Inspection Report 05000369/2018005 and 05000370/2018005 ML18074A0162018-03-15015 March 2018 Emailed Hs 2018002 Hs ML18059A0932018-02-28028 February 2018 EOC Assessment Letter IR 05000369/20170052017-08-16016 August 2017 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2017005 and 05000370/2017005 ML17114A4992017-04-17017 April 2017 Emergency Preparedness Inspection and Request for Information IR 05000369/20160062017-03-0101 March 2017 Annual Assessment Letter for McGuire Nuclear Station, Units 1 & 2 -NRC Inspection Report 05000369/2016006 and 05000370/2016006 ML17024A2812017-01-23023 January 2017 William B. McGuire Nuclear Plant - Notification of Inspection and Request for Information IR 05000369/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2016005 and 05000370/2016005) ML16082A1362016-03-21021 March 2016 Requalification Program Inspection - McGuire Nuclear Station ML16062A2152016-03-0202 March 2016 Annual Assessment Letter ML16061A0252016-02-29029 February 2016 PIR Notification Letter 2016 ML16032A0922016-01-29029 January 2016 William B. McGuire Nuclear Station, Unit 1, Notification of Inspection and Request for Information ML16026A5912016-01-26026 January 2016 William B. McGuire - Notification of Inspection and Request for Information ML15251A2242015-09-0202 September 2015 Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U. S. Nuclear Regulatory Commission Inspection Report 05000369/2015008 and 05000370/2015008 IR 05000369/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2015005 and 05000370/2015005) IR 05000369/20140012015-03-0404 March 2015 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2014001 and 05000370/2014001) ML14351A0182014-12-12012 December 2014 IR 05000369/2015007 and 05000370/2015007, Notification of McGuire, Units 1 and 2, Component Design Bases Inspection ML14245A1322014-09-0202 September 2014 Mid-Cycle 2014 Letter ML14063A1572014-03-0404 March 2014 2013 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 ML13246A1622013-09-0303 September 2013 Mid Cycle Assessment Letter IR 05000369/20120012013-03-0404 March 2013 Annual Assessment Letter for McGuire, Units 1 & 2, (IR 05000369-12-001 and 05000370-12-001) ML12248A0592012-09-0404 September 2012 Mid Cycle Assessment Letter McGuire 2012 ML12066A0272012-03-0505 March 2012 Report 22, Inspection Activity Plan ML11364A0192011-12-12012 December 2011 Fourth Inservice Inspection Interval Plan ML1124403202011-09-0101 September 2011 Report 22, Inspection/Activity Plan, 09/01/2011- 12/31/2012 ML1106301172011-03-0404 March 2011 Inspection / Activity Plan, Report 22, 03/01/2011 - 06/30/2012 ML1024407572010-09-0101 September 2010 Report 22, Inspection/Activity Plan ML1006200602010-03-0303 March 2010 Enclosure 2 - Inspection/Activity Plan Report 22 ISFSI ML1006208642010-03-0303 March 2010 Enclosure 1 - Inspection/Activity Plan, Report 22 2024-01-29
[Table view] Category:Letter
MONTHYEARIR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000369/20220032022-10-27027 October 2022 Integrated Inspection Report 05000369/2022003 and 05000370/2022003 IR 05000369/20220112022-09-29029 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000369/2022011 and 05000370/2022011 ML22266A0782022-09-26026 September 2022 William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition IR 07200038/20220012022-09-12012 September 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200038/2022001 ML22230B6132022-09-0101 September 2022 Review of the Draft Environmental Assessment and Finding of No Significant Impact for Brunswick Steam Electric Plant and McGuire Nuclear Station Independent Spent Fuel Storage Installations Decommissioning Funding Plans IR 05000369/20220052022-08-29029 August 2022 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 IR 05000369/20220022022-07-26026 July 2022 Integrated Inspection Report 05000369/2022002 and 05000370/2022002 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3112022-05-16016 May 2022 Letter Issuing Exemption to McGuire IR 05000369/20224012022-05-12012 May 2022 Cyber Security Inspection Report 05000369/2022401 and 05000370/2022401 2024-01-31
[Table view] |
Inspection Report - McGuire - 2020006 |
---|
|
|
Text
March 3, 2021
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/2020006 AND 05000370/2020006
Dear Mr. Ray:
The NRC has completed its end-of-cycle performance assessment of McGuire Nuclear Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2020, through December 31, 2020 This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at McGuire Nuclear Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2022. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, how best to perform on-site portions to minimize personnel health risks and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions, (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please call me at 404-997-4611 with any questions you have regarding this letter.
Sincerely,
/RA/
Jared Nadel, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 Enclosure: McGuire Inspection/Activity Plan (03/01/2021 - 12/31/2022)
cc distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/2020006 AND 05000370/2020006 DATED: March 3, 2021 DISTRIBUTION:
M. Kowal, RII L. Gibson, RII S. Price, RII OE Mail RIDSNRRDRO PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports ADAMS Accession No: ML21061A227 OFFICE RII: DRP RII: DRP NAME J. Worosilo J. Nadel DATE 2/24/2021 3/3/2021
IP 22 Inspection Activity Plan Report McGuire 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count NFPA 805 TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 03/22/2021 03/26/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1, 2 04/05/2021 04/09/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
SECURITY BASELINE INSPECTION AND .05 DRILL OBSERVATION 1 1, 2 03/22/2021 03/26/2021 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 07/12/2021 07/16/2021 IP 71130.02 000734 Access Control 1, 2 07/12/2021 07/16/2021 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 07/12/2021 07/16/2021 IP 71130.09 001656 Security Plan Changes 1, 2 07/12/2021 07/16/2021 IP 71151 001338 Performance Indicator Verification TARGET SET INSPECTION 2 1, 2 04/19/2021 04/22/2021 IP 71130.14 000743 Review of Power Reactor Target Sets TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 07/19/2021 07/23/2021 IP 71111.07T 000700 Heat Sink Performance RP PUBLIC RAD SAFETY INSPECTION 2 1, 2 07/19/2021 07/23/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/19/2021 07/23/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/19/2021 07/23/2021 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation 1, 2 07/19/2021 07/23/2021 IP 71151 000746 Performance Indicator Verification EMERGENCY PREPAREDNESS EXERCISE 5 1, 2 08/02/2021 08/06/2021 IP 71114.01 000716 Exercise Evaluation 1, 2 08/02/2021 08/06/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 08/02/2021 08/06/2021 IP 71151 001397 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION +SG 2 2 09/13/2021 09/17/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY INSPECTION 3 1, 2 09/13/2021 09/17/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 09/13/2021 09/17/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 09/13/2021 09/17/2021 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report McGuire 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count DUKE CORPORATE AA/FFD BASELINE SECURITY INSPECTION 2 1, 2 01/10/2022 01/14/2022 IP 71130.01 000733 Access Authorization 1, 2 01/10/2022 01/14/2022 IP 71130.08 000740 Fitness For Duty Program MCGUIRE INITIAL LICENSE EXAM 4 1, 2 01/10/2022 01/14/2022 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 02/14/2022 02/25/2022 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3 1, 2 01/31/2022 02/04/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments SECURITY BASELINE INSPECTION 1 1, 2 03/07/2022 03/11/2022 IP 71130.01 000733 Access Authorization 1, 2 03/07/2022 03/11/2022 IP 71130.08 000740 Fitness For Duty Program UNIT 1 IN-SERVICE INSPECTION +SG 2 1 03/28/2022 04/01/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 2 1, 2 04/04/2022 04/08/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/04/2022 04/08/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/04/2022 04/08/2022 IP 71124.04 000728 Occupational Dose Assessment 1, 2 04/04/2022 04/08/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 04/04/2022 04/08/2022 IP 71151 000746 Performance Indicator Verification 1, 2 04/18/2022 04/22/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/18/2022 04/22/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/18/2022 04/22/2022 IP 71124.04 000728 Occupational Dose Assessment 1, 2 04/18/2022 04/22/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 04/18/2022 04/22/2022 IP 71151 000746 Performance Indicator Verification MCGUIRE REQUAL INSPECTION 2 1, 2 06/13/2022 06/17/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS 6 1, 2 06/27/2022 07/01/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 07/18/2022 07/22/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report McGuire 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2 1, 2 10/17/2022 10/21/2022 IP 71114.02 000717 Alert and Notification System Testing 1, 2 10/17/2022 10/21/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 10/17/2022 10/21/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 10/17/2022 10/21/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 10/17/2022 10/21/2022 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION 3 1, 2 10/24/2022 10/28/2022 IP 71130.02 000734 Access Control 1, 2 10/24/2022 10/28/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 10/24/2022 10/28/2022 IP 71130.07 000739 Security Training 1, 2 10/24/2022 10/28/2022 IP 71130.09 001656 Security Plan Changes 1, 2 10/24/2022 10/28/2022 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.