Inspection / Activity Plan Page 1 of 2 09/01/2011 08:50:25 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site McGuire EB3 ISI
- UNIT 1 IN-SERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 09/26/2011 09/30/2011 ISFSI
- MC GUIRE ISFSI - DRY RUN 4
1, 2 IP Preoperational Testing Of An ISFSI 60854 12/12/2011 12/16/2011 ISFSI
- ISFSI FIRST LOADING CAMPAIGN (MAGNASTOR) 2 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 01/16/2012 01/20/2012 CDBI
- COMPONENT DESIGN BASES INSPECTION 6
1, 2 IP Component Design Bases Inspection 7111121 02/13/2012 02/17/2012 1, 2 IP Component Design Bases Inspection 7111121 03/05/2012 03/09/2012 1, 2 IP Component Design Bases Inspection 7111121 03/19/2012 03/23/2012 1, 2 IP Component Design Bases Inspection 7111121 04/02/2012 04/06/2012 EB3 HS
- TRIENNIAL HEAT SINK INSPECTION 1
1, 2 IP Heat Sink Performance 7111107T 03/05/2012 03/09/2012 OL RQ
- REQUAL INSPECTION 2
1, 2 IP Licensed Operator Requalification Program 7111111B 06/11/2012 06/15/2012 OL EXAM
- INITIAL EXAM PREP 3
1 MCGUIRE / AUGUST 2012 EXAM AT POWER FACILITIES V23375 07/30/2012 08/03/2012 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 5
1, 2 IP Problem Identification and Resolution 71152B 08/13/2012 08/17/2012 1, 2 IP Problem Identification and Resolution 71152B 08/27/2012 08/31/2012 OL EXAM
- INITIAL EXAM - WEEK 1 3
1 MCGUIRE / AUGUST 2012 EXAM AT POWER FACILITIES V23375 08/20/2012 08/24/2012 OL EXAM
- INITIAL EXAM - WEEK 2 3
1 MCGUIRE / AUGUST 2012 EXAM AT POWER FACILITIES V23375 08/27/2012 08/31/2012 PSB1-RP
- OCCUPATIONAL RP BASELINE WK1 3
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/17/2012 09/21/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 09/17/2012 09/21/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/17/2012 09/21/2012 1, 2 IP Occupational Dose Assessment 71124.04 09/17/2012 09/21/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/17/2012 09/21/2012 1, 2 IP Performance Indicator Verification 71151 09/17/2012 09/21/2012 EB3 ISI
- UNIT 2 INSERVICE INSPECTION & RPVH EXAMS 2
2 IP Inservice Inspection Activities - PWR 7111108P 09/24/2012 09/28/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 09/01/2011 08:50:25 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site McGuire EB3SGISI
- UNIT 2 SGISI 1
2 IP Inservice Inspection Activities - PWR 7111108P 10/01/2012 10/05/2012 PSB1-RP
- OCCUPATIONAL RP BASELINE WK2 3
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/01/2012 10/05/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/01/2012 10/05/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/01/2012 10/05/2012 1, 2 IP Occupational Dose Assessment 71124.04 10/01/2012 10/05/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 10/01/2012 10/05/2012 1, 2 IP Performance Indicator Verification 71151 10/01/2012 10/05/2012 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1, 2 IP Alert and Notification System Testing 7111402 11/05/2012 11/09/2012 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 11/05/2012 11/09/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 11/05/2012 11/09/2012 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/05/2012 11/09/2012 1, 2 IP Performance Indicator Verification 71151 11/05/2012 11/09/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.