MONTHYEARIR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 05000369/LER-1923-001, Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error2023-12-13013 December 2023 Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection – U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20234012023-08-0404 August 2023 – Security Baseline Inspection Report 05000369/2023401 and 05000370/2023401 (OUO-SRI) Cover IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 – Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station – Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23124A0862023-05-0303 May 2023 Cycle 29, Revision 1, Core Operating Limits Report (COLR) ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility 2024-08-26
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML22087A4782022-03-25025 March 2022 301 Exam Report IR 05000369/20203022021-02-26026 February 2021 Reissue - William B. McGuire, NRC Retake Written Examination Report 05000369/2020302 and 05000370/2020302 ML20353A3902020-12-18018 December 2020 William B. McGuire Nuclear Station, NRC Retake Written Examination Report 05000369/2020302 and 05000370/2020302 IR 05000369/20203012020-04-24024 April 2020 William B. McGuire Nuclear Station NRC Examination Report 05000369/2020301 and 05000370/2020301 IR 05000369/20183012018-06-25025 June 2018 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2018301 and 05000370/2018301 ML16092A1742016-03-29029 March 2016 Operator Licensing Written Examination Approval 05000369/2016301 and 05000370/2016301 IR 05000369/20133012014-01-23023 January 2014 Er 05000369-13-301, 05000370-13-301; on December 2 - 6, 2013 & December 12, 2013; McGuire Nuclear Plant, Units 1 and 2, Operator License Examinations IR 05000369/20123012012-10-22022 October 2012 Er 05000369-12-301, 05000370-12-301, August 20 - 28, 2012 & September 5, 2012; McGuire Nuclear Plant, Units 1 &2, Operator License Examinations ML12221A3912012-08-0606 August 2012 Duke Energy - Response to NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations IR 05000369/20113012011-08-23023 August 2011 Er 05000369-11-301; 05000370-11301; 06/27/2011 - 07/06/2011; McGuire Nuclear Station, Units 1& 2, Operator License Examinations IR 05000369/20103012010-09-0808 September 2010 NRC Examination Report 05000369-10-301 and 05000370-10-301 IR 05000369/20093022009-12-0303 December 2009 Operator Retake License Examination Report 05000369/09-302 and 05000370/09-302 IR 05000369/20093012009-07-0707 July 2009 NRC Examination Report 05000369/2009301 and 05000370/2009301 ML0826802612008-09-24024 September 2008 May, 05000369-08-301 & 05000370-08-301 Final As-Given RO Written Exam ML0818502312008-07-0303 July 2008 Er 05000369-08-301 and 05000370-08-301, on 05/12-21/08 & 05/23/08, McGuire Nuclear Plant, Units 1& 2, Licensed Operator Examinations IR 05000369/20073012007-04-25025 April 2007 Er 05000369-07-301 and 05000370-07-301 on March 19-22, 2007, McGuire Units 1 & 2 ML0527602732005-09-21021 September 2005 Duke Power - Response to NRC Regulatory Issue Summary 2005-19 Preparation and Scheduling of Operator Licensing Examinations ML0331403662003-11-10010 November 2003 NRC Examination Report 05000369/2003-302 and 05000370/2003-302 IR 05000369/20033022003-11-10010 November 2003 NRC Examination Report 05000369/2003-302 and 05000370/2003-302 ML0323700262003-06-16016 June 2003 June 2003 Exam 50-369/03-301 & 50-370/03-301, Final Combined Ro/Sro Written Exam with Kas, Answers, References, & Analysis ML0321002242003-06-16016 June 2003 June 2003 Exam 50-369/03-301 & 50-370/03, Written Exam ML0321103322003-06-16016 June 2003 June 2003 Exam 50-369/03-301 & 50-370/03-301, Final Ro/Sro Written Exam References ML0321002272003-06-16016 June 2003 June 2003 Exam 50-369/03-301 & 50-370/03-301, Written Exam ML0306603912003-03-0707 March 2003 Reactor and Senior Reactor Operator Initial Examinations - McGuire Nuclear Station 50-369/03-301 and 50-370/03-301 ML0227001272002-09-26026 September 2002 Er 05000369-02-302 and 05000370-02-302, on 07/15/2002 and 08/29/2002, McGuire Nuclear Station, Units 1 and 2 Licensed Operator Retake Examinations ML0220502652002-07-16016 July 2002 Response to NRC Regulatory Issue Summary 2002-09, Supplement Preparation and Scheduling of Operator Licensing Examinations 2024-07-29
[Table view] |
Text
September 20, 2023
SUBJECT:
WILLIAM B. MCGUIRE NUCLEAR STATION - NRC EXAMINATION REPORT 05000369/2023 301 AND 05000370/2023 301
Dear Mr. Pigott:
During the period of July 31, 2023, to August 10, 2023, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the William B. McGuire Nuclear Station. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on August 17, 2023.
All applicants passed both the operating test and written examination. There were no post-administration comments submitted by your training staff. A Simulator Fidelity Report is included in this report as Enclosure 2.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 12.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997 -4518.
Sincerely,
/RA/
Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety
Docket Nos: 50- 369 and 50- 370 License Nos: NPF-9 and NPF-17
Enclosures:
1. Report Details 2. Simulator Fidelity Report
REGION II==
Examination Report
Docket No.: 05000369, 05000370
License No.: NPF-9, NPF-17
Report No.: 05000369/2023 301 and 05000370/2023 301
Enterprise Identifier: L-2023-OLL- 0026
Licensee: Duke Energy Carolinas LLC
Facility: McGuire Nuclear Station, Units 1 & 2
Location: Huntersville, NC 28078-8985
Dates: Operating Test - July 31, 2023 - August 10, 2023 Written Examination - August 17, 2023
Examiners: M. Bates, Senior Operations Engineer J. Bundy, Senior Reactor Inspector A. Goldau, Operations Engineer N. Lacy, Operations Engineer V. Furr, Operations Engineer (Trainee)
Approved by: Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety
Enclosure 1 SUMMARY
ER 05000369/ 2023 301 and 05000370/ 2023 301; operating test July 31, 2023 - August 10, 2023
& written exam August 17, 2023; William B. McGuire Nuclear Station; Units 1 and 2 Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 1 2, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the McGuire Nuclear Station staff developed both the operating tests and the written examination. The initial operating test, written RO examination, and written SRO examination submittals met the quality guidelines contained in NUREG-1021.
The NRC administered the operating tests during the period of July 31,2023 - August 10, 2023.
Members of the McGuire Nuclear Station training staff administered the written examination on August 17, 2023. All Reactor Operator (RO) and Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. All applicants were issued licenses commensurate with the level of examination administered.
There were no post-examination comments.
No findings were identified.
REPORT DETAILS
4. OTHER ACTIVITIES
4OA5 Operator Licensing Examinations
a. Inspection Scope
The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed, were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC performed an audit of license applications during the preparatory site visit in order to confirm that they accurately reflected the subject applicants qualifications in accordance with NUREG-1021.
The NRC administered the operating tests during the period of July 31, 2023, to August 10, 2023. The NRC examiners evaluated five Reactor Operator (RO) and 12 Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021.
Members of the McGuire Nuclear Station training staff administered the written examination on August 17, 2023. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the McGuire Nuclear Station, met the requirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating tests.
b. Findings
No findings were identified.
The NRC developed the written examination sample plan outline. Members of the McGuire Nuclear Station training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 12, of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
The NRC determined, using NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.
All applicants passed both the operating test and written examination and were issued licenses.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee submitted no post-examination comments. A copy of the final written examination and answer key, with all changes incorporated, may be accessed not earlier than September 24, 2025, in the ADAMS system (ADAMS Accession Number(s)
ML23258A122 and ML23258A148).
4OA6 Meetings, Including Exit
Exit Meeting Summary
On August 10, 2023, the NRC examination team discussed generic issues associated with the operating test with B. Bare, Station Manager, and other members of the McGuire Nuclear Station staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT
Licensee personnel
B. Bare Station Manager M. Matheny Operations Manager J. Banse Assistance Operations Manager - Shift S. Moser Training Manager C. Vrikkis Superintendent - Nuclear Operations Training W. Killette Superintendent - Nuclear Operations Training J. Thomas Regulatory Affairs Manager C. Bush ILT Lead Instructor - Nuclear Operations Training R. Rowe Assistant Operations Manager - Support
SIMULATOR FIDELITY REPORT
Facility Licensee: McGuire Nuclear Station
Facility Docket No.: 05000369 and 05000370
Operating Test Administered: July 31, 2023 - August 10, 2023.
This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
No simulator fidelity or configuration issues were identified.
Enclosure 2