IR 05000219/1985037

From kanterella
Jump to navigation Jump to search
Meeting Rept 50-219/85-37 on 851113.No Violation Noted. Major Areas Inspected:Status of Reverification Program of safety-related Piping & Pipe Supports for Closure of Listed IE Bulletins
ML20138M262
Person / Time
Site: Oyster Creek
Issue date: 12/16/1985
From: Kamal Manoly, Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20138M259 List:
References
50-219-85-37-MM, IEB-79-02, IEB-79-04, IEB-79-07, IEB-79-14, IEB-79-2, IEB-79-4, IEB-79-7, NUDOCS 8512200318
Download: ML20138M262 (15)


Text

_ _ _

,

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report N /85-37 Docket N l l License No. DPR-16 Category C Licensee: GPU Nuclear Corporation P. O. Box 388

.

Forked River, N.J. 08731

!' Facility Name: Oyster Creek Nuclear Generating Station Meeting At: NRC-Region I Office King of Prussia, Pennsylvania Meeting Conducted: November 13, 1985 Meeting No: M85-369 NRC Participants: r Inspector:

Kamal~ Manoly, Lead Reactor Engineer

,

Approved by: .

C [4

Jam s Wiggins, Chief, Materials &

Processes Section, EB Inspection Summary: Meeting on November 13,1985 (Report No. 50-219/85-37),

Area Reviewed: Status of re-verification program of safety related piping and pipe supports at Oyster Creek in conjunction with inspection findings-identified in NRC inspection No. 50-219/85-14 for closure of IEB 79-02, 79 04, 79-07 and 79-1 Results: No violations were identifie .

C5122OO318 951216

+ PDR ADOCK 05000219 0 PDR

. .

l DETAILS 1.0 Meeting Participany NRC l

J. Durr, Chief, Engineeriag Branch, DRS J. Wiggins, Chief, Materials and Processes Section, EB, DRS K. Manaly, Lead Reactor Engineer, EB, DRS H. Kister, Chief, Project Branch R. Blough, Chief Project Section No. IA, DRP J. Donahew, OCPM, ORB #5, NRR W. Bateman, Senior Resident Inspector

!

GPU Nuclear R. Wilson, Technical Functions Director D. Croneberger, Director Engineering and Design N. Kazanas, Director Quality Assurance E. O'Connor, Manager Special Projects J. Thrope, Utrector Licensing & Regulatory Affairs R. 81ough, !;upervisor Suppl. Evaluation

,

R. Zak, Engineer, Engineering Mechanics l

J. Rogers, Licensing Engineer 2.0 Piping Reve df,1 cation Program I A meeting was held on November 13, 1985 in King of Prussia, Pennsylvania between representatives of GPU Nuclear and the NRC staff to discuss the status of the current piping reverification program. The activity was l undertaken by the licensee in response to findings identified during the NRC Region I inspection for closeout of IEB 79-02 and 79-14 (Report N /85-14).

The licensee's representative provided: a sumrr.ary of the IEB 79-14 rever-ification scape, status of inspection and completion schedule on a system by system basis, description of activities and cempletion schedule on a system by system basis, description of activities performed on site and at the corporate office, results of technical evaluations, and identified nonconformances requiring rewor Details of the above activities were provided by the licensee during the meeting and are enclosed with this meeting report (Attachment 1).

'

Other related items and schedular commitments which were discussed during the meeting incit.ded:

,

! ..

__ - _ _ _ __ .- - - - - - - _ . .

.

.

Tentative plans were made for a meeting between GPU Nuclear and the NRC in Region I office in May 1986 to review the status of the IEB 79-14 reverification program effor *

Changes to the completion schedules proposed in Report 50-219/85-22 were discussed. These changes were transmitted in the licensee's letter dated November 7, 198 *

Licensee reinspection activities related to IEB 79-02 findings will be completed in April 198 In the scope of this program, the licensee will perform individual anchor bolt pull testin *

Licensee re-anilysis for IEB 79-14 will be completed before restart from outage Ill, except for recirculation hangers inside the drywel *

The specifications and criteria for performing engineering evalua-tions related to IEB 79-02 and 79-14 reverification programs have been approved for use in October 198 ,

-.

.

l-

'

ATTACHMENT 1

-

l

'

l ,

AGENDA 79-14 HANGER

. REVERIFICATION PROGRM

.. .. .

79-14HANGERINSPECTIONS PROJECTSCOPEANDINSPECTIONSIAIUS

.. . .. SCHEDUURREQUIRMBIS IECBICALEVALUAIIONS IECMICALRESULIS IECBICAL DOCLETATION

.

e

.

-

-.

.

>- .

E L ,

'

79-14HANGERINSPECIIONS 1.0 79-14PROJECTSCOPE:

'

'

AVERIFICATIONPROGRAMHASBEENIMPlf.MENIEDTO RE-INSPECTANDRE-ANALYZE 11SEISMICCATEGORYIPIPING SYSIEMS AND APPR0XDIAIELY 816 CORRESPONDING SEPPORIS,

' 10DATE,AllSEPPORISHAVEBEENINSPECIEDEXCEPIFOR 84REACIORRECIRCULATIONSUPPORISWICHWERE

!

IDENTIFIEDINGPUNSUBMIIIAL(0CI.28,1985).

.

I s

i l

-. __, -, -

- .__ - _ . -. . _ .- _

-.

.

.

1.1 79-14 SUPPORI INSPECTIONS:

,

SYSTEMSDESCRIPIION SUPPORIS CLEANUPDEMINERALIZER 11 CONIAIh H SPRAY 170 CONTROLR0DDRIVE 110 CORESPRAY 126 ISOLATIONCONDENSER 78 EMERGENCYSERVICEWATER 86 FEEDWATER 28

>

LIQUIDP0IS0N MAINSIEAM 31 REACIORRECIRCULATION 105 REACIORSHUIDOWNC0OLING 39

.

Total 816

.

.

. .

\

"

79-14 WORK SCOPE COMPARISON

,

900

,,,_ Legend s i = = ^ :!!r m ? a 700-

,

g.00-l sos

< 00 O 400-300- '

200

m d  :

I e

- --- ,. - . - . - - , - . - - - - , - - - - , - . . - . - . . , -

_

.

.

, SCilEDUlARREQUIREES:

2.1 OUISIDEDRKEllPIPINGANALYSIS 2,2 OUISIDE DRWEll SUPP0EI ANALYSIS 2.3 INSIDE DRWEll PIPING ANALYSIS 2,4 INSIDEDRWEllSUPPORIANALYSIS

.

___ __ _ . . .. __. . _ _ . - _ _

,

~

IEBUllEITN79-14HANGERREVERIFICAIl0N OUISIDEDRYWEll-PIPINGANALYSIS

-

(ASOfNOV.1,1985)

.

1985 1986 1sCHEDUL El J A S O N D J F M A

.

IJUL85 19JUL85 LIQUID POISON '

liii IJUL85 26JUL8 SHUTDOM COOLING _

i 22JUL85 22NOV85 CORE SPRAY l*

1 1 8 29JUL85 15NOV85 ISO CONDENSER I *

I I I

~

5AUG85 22NOV85 EMERGENCY SERVICE WATER lk '

i i i 12AUG85 7NOV85 CRD/SDV I *

Il'  ;

'

210CT85 3J Atl86 CONTAINMENT SPRAY l l* 1 1 I i 8NOV85 21NOV85 FEEDWATER 0 *

I I I 22NOV85 90EC85 MAIN STEAM 0 * i l l l !  !

, 15JAN86 5FEB86 EMERG SERV WATER-INT AKE O * l l l DATA DATE

.

  • OPERATIONALANDRADIOLOGICALRESTRAINISDEL INSPECTIONSANDPIPINGANALYSE l

- . _ - _ - - .- _ _ _ _ _ .. -

- -

.

I

.

!

, IEBCllETIN79-14HANGERREVERIFICATION l

,

OUISIDEDRYWEll-SEPPORIANALYSIS

<

(ASOFNOV.1,1985) i

i

.

'

_

1985 1986

'.Is c H E D LJ L El -

S 0 N D J F M A M 9SEP85 20SEP85 LIQUID POI 30N-23 16SEP85 20CT85 SHUTDOWN COOLINC-29 23SEP85 6DEC85 CORE SPRAY-114 l l l 26NOV85 13JAN86 EMERG SERVICE WATER-75 l l

- 1 I I

'

90EC85 27JAN86 ISO CONDENSER-59 U l i l i 14JAN86 12 MAR 86 CRD-95 I I I I I T4JAN86 24FEB86 CoffTAINMENT SPR AY-98 I I I I 20JAN86 5FEB86 "fW-DEMAIN STEAM-4 O I I I I 21FEB86 10 MAR 86 ESW - INTAKE-11 0

'

DATA

, DATE

. _ _ _ _ _ _ , _ _ _ . . _ _ _.,_ __ _ _ _ _ _. _

. . . -----

n -

.

.

\

' IEBULLETIN79-14HANGERREVERIFICATION INSIDEDRMll-PIPINGANALYSIS (ASOfNOV.1,1985)

1985 1986 iSCHEDUL EI N D J F M A M J J A S O 11NOV85 11FEB86 CORE SARAY l l l

18NOV85 230EC85 ISO CONDENSER I

10DEC85 2JAN86 CRD 0 1 I 18DEC85 20JAN86 FEEDWATER .

I I ,

26DEC JAN86 SHUTDOWN COOLING 0

-

1 I 3JAN86 24JAN86 MAIN STEAM O I I 6JAN86 16JAN86 LIQUID POISON O

'

I I 6FEB86 SMAR86 CONTAINMENT SPRAY l i I I 3M'AR86 24 MAR 86 CLEAN-UP DEMINERALIZER O

28JUi86 25SEP86 RECIRCULATION l l

.

DATA DATE

- . . , - -- ~ ,..__----- - - .--_-.-- ..,.----. -., ------._, , .~. -. . . -_--,-- , , - - - -.

-- .-. . __

,

.

24 IEBUllETIN79-14HANGERREVERIFICATION INSIDEDRMll-SUPPORTANALYSIS .

(AS Of NOV.1,1985)

'

1986

-

Is c H EDUL El J F M A M J J A S O N 28JAN86 20FE886 FEEDWATER-26 C 11FEB86 SMAR86 CRD-15 0

24FEB86 4 MAR 86 SHUfDOWN C00LINC-10 0 .-

l 28FE886 19 MAR 86 CORE SPRAY-12 O l

4 MAR 86 15APR86 CONTAINMENT SPRAY-71 I- l l

6 MAR 86 17 MAR 86 CLE AN-UP DEMIN-11 0

25 MAR 86 11APR86 LIQUID POISON-9 0 l I 8APR86

~

9MAY86 MAIN S TE AM-29 l l I 3SEp86 200CT86 RECIRCULATION-105 l l

,

. _ _ _ _ _ - . - , . , _ . , _ _ _ _ , _ _ _ _ , - _ _ _ _ _

-

. _ _ _ . - _ _ _ . _ _ _ _ _ _ _ - , _

-

_ . .

.

. TECHNICAL EVALUATIONS

'

'MNCRCONDITIONALRELEASEEVALUATION(0C)

'ANCHORTOANCHORSYSTEMCONDITIONALEVALUATION(0C)

'INDEPENDENTREVIEW0FCONDITIONALEVALUATIONS(HQ)

' CONFIRMATORY DETAILED PIPING AND PIPE SUPPORT C

.

I70?w

" .

.

-

.

. TECHNICAL RESULTS

'ALLQlAINSPECTIONSCONPLETED(EXCLUDINGRECIRCULATION)

~

'ALLMNCREVALUATIONSCOMPLETED

'ALLANCHORTOANCHOREVALUATIONSCOMPLETED

'ALL NSR PIPING SYSTEMS ARE CURRENTLY IN AN CPERABLE CONDITIO

'100DETAILEDPIPESUPPORTCALCULATIONSCOMPLETED

'20OfTHE100SUPPORTSWILLBEUPGRADEDTODESIGNSPECIFICATIONS (CYCLE 11, llR OUTAG REWORKITEMS

'MNCREVALVATIONSREQUIREDREWORKON120F732 SUPPORTS

' PRELIMINARY INDICATIONS FROM DETAILED CALCULATIONS INITIATED ON21ESWSUPPORTS(COMPLETEDDURING10M)

'0ETAILEDCALCULATIONSONCORESPRAYPIPESUPPORTSARECURRENTLY BEINGPERFORMEDANDMAYINITIATESUPPORTREWOR .

F* .s ,

q .

s

' * ,

'

'

,_

,

'

_.

l TECHNICAL DOCUMENTATION J

. 1 .

l i, 'PIPINGANALYS;:SSPECIFICATION(COMPLETED)

' '

e ,  :

-

.' 'PIPINGSUPPORTANALYSISSPECIflCATION(COMPLETED)

"

'IdPECTIONPACGGESFOREACHPIPESUPP0sSYSTEM(COMPLET ' CALCULATION E KAGE FOR EACH PIPING SYSTEM (IN-PROCESS)

l

' '

'CALCULAI;:0NPACOGEFOREACHPIPESdPCRT(IN-PROCESS)

- -

, .7 ,

.i

,

"

.

'

h 3

.

(IN-USDf

-

.,

.-

!0 'PIPIdliRESS IS0 METRICS AND PLPMG CCNPUTER M -

!

3 BECONTROLLEDREFLE TING.THEA'S-BUILTCONflGUR

.

.

-

'

-

. ..

.

W

'

.

'

'). .

,

, ,

.L ,

.~

9 '% ,

'

.

%.

,

'% N p t

. <

l .#* v .*

( ** o

~

. .

.

%

,

'

..

e

';~ ." ,,

^

- , ' p *y ~4

.