s MAR 31986 Docket No.
50-219 GPU Nuclear Corporation P. R. Clark, President 100 Interpace Parkway Parsippany, New Jersey 07054 Gentlemen:
Subject:
Systematic Assessment of Licensee Performance (SALP) No.
50-219/85-99 Thank you for your letter dated December 5,1985 wherein you presented, as a follow-up to our October 28, 1985 meeting, a detailed response to the Oyster Creek SALP for the period May 1,1984 through June 30, 1985. We appreciate the effort you made to address our concerns and intend to follow-up your corrective actions in future inspections.
The SALP report, our transmittal letter, and your response letter are enclosed and will be placed in the Public Document Room.
In your letter you requested we reconsider the Category 3 rating in Maintenance.
We recognize that a substantial amount of effort has gone into and continues to be applied in improving performance in this area subsequent to the 10R outage.
However, observations by our inspectors during the evaluation period indicated that your efforts have been slow in producing resalts. Also, many of the ef-forts described in your SALP response represent future plans and the positive effects they will have on overall performance at Oyster Creek. We appreciate your descriptions of plans for improvement, which are an important aspect of the SALP process.
But since the SALP process evaluates performance based on observations during the assessment period, the plans you described would n.ot provide basis for changing the assessment for the expired SALP period. There-fore, we consider our Category 3 rating of your performance in maintenance to be appropriate at this time. We are also somewhat concerned regarding instances where your response discounted items as not being " safety issues".
In our SALP, we gave you perceptions wherein the safety issue was the underlying attitudes and philosophies involved; we hope this point has not been missed.
The point is made several times in your letter, but most strongly in the Techni-cal Support response, that you feel increased NRC understanding of your organi-zation would be of benefit to us in assessing your performance.
It is important that you appreciate the NRC inspection program is a systematic, sampling type program that is similarly applied to all licensees. It is designed to evaluate performance regarding nuclear safety and we feel confident in our ability to make assessments in this area based on our current inspection program.
Further, because our inspections programs at both TMI and Oyster Creek have evaluated corporate and technical support, we feel our current understanding of your organization is good. We do, however, continually strive to improve the inspec-tion program and are, in fact, attempting to provide increased inspection of corporate based support at all facilities, which should further enhance our understanding of your programs.
OFFICIAL RECORD COPY SALP OiC 85-99 LTR - 0001.0.0 02/19/86 0603110349 060303
'
PDR ADOCK 05000219
-
O PDR 9;/
l
!'
GPU Nuclear Corporation
In discussing EMRV problems, you cited a failure by the vendor to provide you with information, but do not detail measures to improve your control over vendors. We plan to discuss this item with you during the next site visit by regional management.
In your review of Operations, you state our determination of the root cause of many of the LER's was not accurate, however, you recognized in the same para-graph that a judgement was made by the NRC in evaluating the LERs and esta-blishing root cause. We do not feel our root cause evaluation to be in error.
Whether the cause is procedural inadequacy / administrative control or interface problems, appears to be a matter of perspective.
From our perspective, the procedural inadequacies and lack of administrative controls stem from under-lying inter-and intra-department interface problems.
Furthermore, in your response to Section F, Quality Assurance, you emphasized the relatively few QC holdpoints missed as compared to those accomplished, however, our concern with regard to the missed QC holdpoints was your failure to take action after QC self-identified the problems and issued a QDR. Al-though your response to the particular NRC. violation regarding failure to follow procedures governing QDR's indicated you understood the NRC concern, your more recent SALP response does not reflect such understanding.
In summary, we felt the SALP meeting was a beneficial interchange of thoughts and ideas. Regarding corrective actions, we intend to verify that you meet the various commitment dates stated in your response. As you requested, we recon-sidered the rating of Category 3 in Maintenance but concluded no change is warranted.
Your cooperation is appreciated.
Sincerely, origthal eisnea by
> E.Murley Thomas E. Murley Regional Administrator i
Enclosures:
1.
NRC Region I SALP, Oyster Creek Nuclear Generating Station, August 20 and 30, 1985 2.
NRC Letter, T. Murley to P. Fiedler, dated October 11, 1985 3.
GPU Nuclear letter, P. Clark to T. Murle December 5, 1985~
RI:DRP JI:0RP R
~
,Blough Kister SA o ecki Al an IMurley 2/ /86 2/ /86
{ { 86 2 \\/86 J/M6 0FFICIALRECORDh0PY SALP OYC 85-99 LTR - 0002.0.0 02/18/86 I
- SEE PREVIOUS CONCORRENCES l
)
GPU Nuclear Corporation
In your review of Operations, you state our determination of the root cause of many of the LER's was not accurate, however, you recognized in the same para-graph that a judgement was made by the NRC in evaluating the LERs and esta-blishing root cause. We do not feel our root cause evaluation to be in error.
Whether the cause is procedural inadequacy / administrative control.or interface problems, appears to be a matter of perspective.
From our perspective, the procedural inadequacies and lack of administrative controls stem from under-lying inter-and intra-department interface problems.
Furthermore, in your response to Section F, Quality Assurance, you emphasized the relatively few QC holdpoints missed as compared to those accomplished, however, our concern with regard to the missed QC holdpoints was your failure to take action af ter QC self-identified the problems and issued a QDR. Al-though your response to the particular NRC violation regarding failure to follow procedures governing QDR's indicated you understood the NRC concern, your more recent SALP response does not reflect such understanding.
In summary, we talt the SALP meeting was a beneficial interchange of thoughts and iaeas. Regarding corrective actions, we intend to verify that you meet the various commitment dates stated in your response. As you requested, we recon-sidered the rating of Category 3 in Maintenance but concluded no change is warranted.
Your cooperation is appreciated.
Sincerely,
.
Thomas E. Murley Regional Administrator Enclosures:
1.
NRC Region I SALP, Oyster Creek Nuclear Generating Station, August 20 and 30, 1985 2.
NRC Letter, T. Murley to P. Fiedler, dated October 11, 1985 3.
GPU Nuclear letter, P. Clark to T. Murley, December 5,1985 9RB RI:DRP
P RI:DRP RI:DRA Blough Kister Starosteckt Allan 2/f/86 2/(o/86 2/ /86 2/ /86 0FFICIAL RECORD COPY SALP OYC 85-99 LTR - 0002.0.0 02/05/86
,
._
GPU Nuclear Corporation
cc w/ enc 1:
M. Laggart, BWR Licensing Manager Licensing Manager, Dyster Creek Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New Jersey Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech bec w/ enc 1:
' Region I Docket Room (with concurrences)
ManagementAssistant,DRMA(w/oenc1)
Section Chief, DRP PA0 (2)
SALP File D. Holody, Enforcement Specialist J. Taylor, IE T. Murley, Regional Administrator OFFICIAL RECORD COPY SALP OYC 85-99 LTR - 0003.0.0 02/19/86
[