ML17227A456

From kanterella
Revision as of 16:17, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for May 1992 for St Lucie,Units 1 & 2.W/920610 Ltr
ML17227A456
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/31/1992
From: BREEN J J, SAGER D A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-170, NUDOCS 9206150388
Download: ML17227A456 (14)


Text

ACCELERATED DISTIUBUTION DEMONSTRATION SYSTEM REGULAY INFORMATION DZSTRIBUTIOQSYSTEM (RIDE)ACCESSION NBR:920~FACJ'-L:50-335 St.50-389 St.AUTH.iVAME BREENFJ.J.

SAGER,D.A.

RECIP.NAME Lucie Plant, Unit 1, Florida Power&Light Co.Lucie Plant, Unit 2, Florida Power&Light Co.AUTHOR AFFILIATION Florida Power&Light Co.Florida Power&Light Co.RECIPIENT AFFILIATION DOCKET 05000335 05000389

SUBJECT:

Month crating repts for May 1992 for St Lucie,Units 1&2 20610 tr.DISTRIBUTION CODE'E24D COPIES RECEIVED:LTR I ENCL I SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-2 LA NORRIS F J COPIES LTTR ENCL 3 3 1 1 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCE,J.H NSIC 10 1 1 1 10 AEOD/DOA 1 NRR/DLPQ/LPEB10 1 REG FIXE~-01 1 1 NRC PDR 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK.ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 P.O.Box 12B, Ft.Pierce, FL 34954-0120

%PI June 10, 1992 L-92-170 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Ik Attached are the May 1992 Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us~Ve truly yours, D.A.ger Vice esident St.L ie Plant DAS:JJB:kw cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments DAS/PSL 8714-92 9Z06150388 920531 PDR ADOCK 05000335 R.PDR 5 O O Qn FPL Group company P, A V~PJ~v AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-335 COMPLETED BY Z.Z.Breen DAY MONTH MAY 1992 AVERAGE DAILY POWER LEVEL (MWe<<Net)5/1/92 5/2/92 5/3/92 5/4/92 5/5/92 5/6/92 5/7/92 5/8/92 5/9/92 5/10/92 5/ll/92 5/12/92 5/13/92 5/14/92 5/15/92 5/16/92 5/17/92 5/18/92 5/19/92 5/28/92 5/Zi/92 5/22/92 5/23/92 5/24/92 5/25/92 5/26/92 5/27/92 5/28/92 S/29/92 5/30/92 5/31/92 865 865 865 S66 864 86S S64 865 864 864 863 860 861 861 861 859 857 857 856 855 856 856 855 854 855 854 853 852 851 850 848 OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 COMPLETED BY Ji J+5REEN TELEPHONE 487/468/4248 1o UNXT NAME: ST+LUCXE UNIT 1 2+REPORTING PERIOD i MAY 1992 3i LICENSED THERMAL POWER (MAT)+2708 4+NAMEPLATE RATING (GROSS MHE)f 850 5o DESIGN ELECTRICAL RATING<NET MME)i 830 6+MAXIMUM DEPENDABLE CAPACXTY (GROSS MHE)o 872 7, MAXIMUM DEPENDABLE CAPACITY (NET MHE);839 8, IF CHANGES OCCUR XN CAPACITY RATXNGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORTr GIVE REASONS'OHER LEVEL TO WHICH RESTRXCTEDr XF ANY (NET MHE)'10>REASONS FOR RESTRICTXONSr XF ANY+MONTHLY-YTD-CUMULATIVE il.HOURS XN REPORT PERIOD: 12+NUMBER OF HOURS REACTOR HAS CRITICAL 13+REACTOR RESERVE SHUTDOWN HOURS 14'OURS GENERATOR ON-LINE 15+UNIT RESERVE SHUTDOHN HOURS 16+GROSS THERMAL ENERGY GENERATED<MHH)17'ROSS ELECTRXCAL ENERGY GENERATED (MHH)18+NET ELECTRICAL ENERGY GENERATED (MHH)19'NXT SERVICE FACTOR 20 UNIT AVAILABILITY FACTOR 21 o CAPACITY FACTOR (USING MDC NET)22+CAPACITY FACTOR (USING DER NET)Z3 UNIT FORCED OUTAGE RATE 24'HUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 744 744+0 OiO 744iO 8+0 2008981 671980 638867 180+0 100oO ie2 3 183o5 eiO 3647 3647iO Oie 3647.8 oie 9810557 3301350 3139122 100+0 ieeiO ie2 103'Owe 135383.0 103756i6 205i3 102842+9 39+3 265537889 87634170 8Z822818 76iO 76 i 0 75+6 74 i 7 4oO 25'F SHUT DOHN AT END OF REPORT PERIODr ESTXMATED DATE OF STARTUPf UNIT SHVTDOWNS AND POWER REDUCTIONS DOCKET NO.50-335 UNIT NAME ST LU IE DATE JUN i 0 COMPLETED BY J J BREEN TDLHIHDIIH LID4468<248 REPORT MONTH MAY 1 2 No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report System Code'omponent Code'ause&Corrective Action to Prevent Recurrence The average daily power for Unit 1 was 100%for the month of May, 1992.F Forcal S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training ds License Examination F-Administrative G-Operational Error (Expalin)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scratn 4-Continual 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Shccts Liccnsec Event Rcport (LER)File (NUREG41 6 1)Exhibit I-Same, Source

%C<>>r I I 4

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO 50'-335 COMPLETED BY J.J.Breen TELEPHONE 407'68-4248 REPORT MONTH MAY 1992 The average daily power of Unit 1 was 1004 for the month of May, 1992.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POlifER LEVEL DOCKET NO.50-389 DATE COMPLETED BY Z.Z.Breen MONTH MAY'1992 DAY AVERAGE DAILY POWER LEVEL (Mwe-Net)5/1/92 5/2/92 5/3/92 5/4/92 5/5/92 5/6/92 5/7/92 5/8/92 5/9/92 5/10/92 5/ii/92 5/12/92 5/13/92 5/14/92 5/15/92 5/16/92 5/17/92 5/18/92 5/19/92 5/20/92 5/21/92 5/22/92 5/23/92 5/24/92 5/25/92 5/26/92 5/27/92 5/28/92 5/29/92 5/30/92 5/31/92-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3 OPERATXNG DATA REPORT OPERATXNG STATUS DOCVET NO 50-389 DATE gag g g gg2 COMPLETED BY Ji di BREEN TELEPHONE 407/468/4248 1+UNIT NAMEi STo LUCXE UNIT 2 2+REPORTING PERIOD i MAY 1992 3+LICENSED THERMAL POWER (MHT)i~700 4 NAMEPLATE RATING (GROSS MHE)'50 5+DESIGN ELECTRICAL RATXNG (NET MHE): 830 6+MAXIMUM DEPENDABLE CAPACITY (GROSS MME)i 882 7i MAXXMUM DEPENDABLE CAPACITY (NET MHE)+839 8, IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT r GIVE REASONS i POHER LEVEL TQ HHICH RESTRICTED~

IF ANY (NET MHE)10'EASONS FOR RESTRICTIONS'F ANY: MONTHLY-YTD-CUMULATIVE 11+HOURS IN REPORT PERIOD i 12 o NUMBER OF HOURS REACTOR HAS CRITICAL 13i REACTOR RESERVE SHUTDOHN HOURS 14 i HOURS GENERATOR ON-LINE 15o UNIT RESERVE SHUTDOHN HOURS 16, GROSS THERMAL ENERGY GENERATED (MHH)17>GROSS ELECTRICAL ENERGY GENERATED (MHH)18'ET ELECTRXCAL ENERGY GENERATED (MHH)19'NIT SERVICE FACTOR 20'NIT AVAILABILITY FACTOR Zii CAPACITY FACTOR (USXNG MDC NET)22+CAPACITY FACTOR (USING DER NET)23'NIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 2 IS CURRENTLY IN A REFUELING OUTAGE 744 OiO OiO OiO Oie 0 0-2246 OiO OiO 0+0 OiO Oie 3647 2665+6 OiO 2665+6 OiO 7022240 2360550 2234640 73+1 73ei 73iO 73+8 OiO 77280oO 66285+9 0+0 65269i9 0+0 171134846 57086370 53997487 84+5 84o5 84 i 6 84'4i9 25'F SHUT DOHN AT END QF REPORT PERIODS ESTIMATED DATE OF STARTUPi 6/22/92 0 ,j i UNIT SHUTDOWNS AI'K)POWER REDUCTIONS DDCRRT NO.~44 UNIT NAME ST LU IE UNIT 2 DATE AUD.1'0: COMPLETED BY J J BREEN THLHPHONH 244 468A248 RHPORT MONTH~MAY 4 2 No.Date Type'uration (Hours)Reasons Method of Shutting Down Reactor Licensee Event Report¹System Code4 Component Code Cause 8c Corrective Action to Prevent Recurrence 920421 N/A RC FUELEX Unit 2 taken offline for refueling.

F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training ds License Examination F-Administrative G-Operational Error (Expalin)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continual 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Shccts Licensee Event Rcport (LER)File (NUREG4161)

Exhibit 1-Same Source

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-389~~~COMPLETED BY Z.Z.Breen TELEPHONE 407-'68-4248 REPORT MONTH MAY 1992 Unit 2 was in a refueling outage for the month of May, 1992.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

0 0 I)~'7 I'V q~lt