Monthly Operating Rept for Jan 1993 for DC Cook Nuclear Plant,Unit 2.W/930205 Ltr
ML17331A035
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/31/1993
From: BLIND A A, TURNER D G
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9302180152
Download: ML17331A035 (9)


Text

wren.mm X oOmMZm ossa mrox SvsxKM.'REGULATO INFORMATION DISTRIBUTION TEM (RIDS)ACCESSION NBR:9302180152 DOC.DATE: 9@$46/9+NOTARIZED:

NO DOCKET FACIL 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316AUTH.NAME AUTHOR AFFILIATION TURNERED~G~Indiana Michigan Power Co.(formerly Indiana a Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.(formerly Indiana 8 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R'UBJECT: Monthly operati g e t for Jan 1993 for DC Cook Nuclear Plant, unit 2.W 930205 ltr.DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR j ENCL/SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D RECIPIENT ID CODE/NAME PD3-1 LA DEANEW INTERNAL: AEOD/DOA NRQ/3)LPQ/LPEB10 REG FILE 01 EXTERNAL: EG&G BRYCEEJ.H NSIC COPIES LTTR ENCL 3 3 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN3 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI D TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14 g~If f Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 February 5, 1993 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:

Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of January 1993 is submitted.

Respectfully, A.A.Blind Plant Manager Attachment co 3, B~Z D.R.Hahn R.C.Callen S.Hamming J.G.Keppler INPO Records Center ANI Nuclear Engineering Department E.E.Fitzpatrick R.L.Simms W.G.Smith, Jr.S.J.Brewer D.W.Paul S.H.Steinhart J.L.Leichner J.A.Isom D.G.Turner E.A.Smarrella J.C.Krieger B.A.Svensson D.F.Krause E.C.Schimme1 I 8Q)pQ 9302180152 930131 PDR ADOCK 05000316 R , PDR N.R.C.OPERATING DATA REPORT DOCKET NO.50-316 DATE 02-Feb-93 COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS l.Unit Name D.C.Cook Unit 2 2.Reporting Period January 93 3.Licensed Thermal Power (MWt)3411 4.Name Plate Rating (Gross MWe)1133 5.Design Electrical Rating (Net MWe)1090 6.Maximum Dependable Capacity (GROSS MWe)1100 7.Maximum Dependable Capacity (Net MWe)1090 notes 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.Power Level To Which Restricted.

If Any (Net MWe)10.Reasons For Restrictions.

If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.'ours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Gen.(MWH)18.Net Elect.Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six None This Mo.Yr.744 0 744.0 0'744'0.0 2528550 837510 812061 100.0 100'100 F 1 100.1 0.0 Months (Type, to Date 744.0 744.0 0.0 744.0 0'2528550 837510 812061 100.0 100.0 100.1 100'0.0 Date,and Cumm.132241.0 87101.5 0.0 84060.4 0.0 260116322 84591540 81484233 64.7 64'59.1 57.5 16.3 Duration):

25.If Shut Down At End of Report Period, Estimated Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):

Forcast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved AVERAGE DAILY POWER LEVEL (MWe-Net)DOCKET NO.50-316 UNIT TWO DATE 02-Feb-93 COMPLETED BY DG Turner TELEPHONE 616-465-5901 DAY 1 2 3 4 5 6 7 8 9 10 11 12 13.14 15 16 MONTH January 93 AVERAGE DAILY POWER LEVEL 1084 1081 1089 1086 1091 1093 1093 1089 1091 1090 1092 1087 1089 1092 1099 1092 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL 1096 1094 1090 1091 1093 1097 1095 1097 1095 1098 1096 1092 1093 1090 1084 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 1993 UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

D C.COOK U¹T 2 February 3, 1993 G.J.Costello (616)465-5901 i METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO DATE TYPE HOURS REASON REACTOR REPORT NO.CODE CODE TO PREVENT RECURRENCE None There were no unit shutdown or significant power reductions from 100%RTP this month.1 F S Forced Scheduled 2 Reason: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 Method: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 1061)5 Exhibit I: Same Source ta DOCKET O.: UNIT NAME: COMPLETED BY: TELEPHONE:

DATE PAGE: 50-316 D.C.Cook Unit 2 G.J.Costello (616)465-5901 February 3, 1993 Page 1 of 2 MONTHLY OPERATING ACTIVITIES

-JANUARY 1993 HIGHLIGHTS The unit entered the reporting period in Mode 1 at 100: RTP.The unit exited this reporting period in Mode 1 at 100~RTP.There were no challenges to the pressurizer safety valves or power operated relief valves.-Gross Electrical generation for the month of January: was 837510 MWH.DETAILS None DOCKET N UNIT NAME: COMPLETED BY: TELEPHONE:

DATE: PAGE: 50-316 D.C.Cook Unit 2 E.C.Schimmel (616)465-5901 February 5, 1992 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE

-Januar 1993 There were no major safety-related maintenance items during the month of January.

y