ML17331A967

From kanterella
Revision as of 08:25, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1993 for DC Cook Nuclear Plant,Unit 1.W/930906 Ltr
ML17331A967
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/31/1993
From: BLIND A A, JANISSE J D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9309220196
Download: ML17331A967 (7)


Text

ACCELERATE DOC UMEN'I'IS'I'RI UTION SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RXDS)ACCESSION NBR:9309220196 DOC~DATE: '~AVE~NOTARIZED:

NO DOCKET FACIL:50 315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.NAME AUTHOR AFFILXATION JANISSE,J.D.

Indiana Michigan Power Co.(formerly Indiana&Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operatin re t for Aug 1993 for DC Cook Nuclear Plant, unit 1.W 930906 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR j ENCL g SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECXPIENT ID CODE/NAME PD3-1 LA WETZELPB INTERNAL: AEOD/DOA NRR+DORS/OEAB

<<REG FIL Ol EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 1 1 1 1 1 1 1 1 1 1 RECXPXENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 NRC PDR COPIES LTTR ENCL, 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CON'I'ACI'I IE DOCIJMEl"I CON TROI.D!:SI..ROOM Pl-37 (EXT.504-20Ci5)

TO ELIMINATE YOUR NAME FROM Dlb'fRI!31"I'lON LISTS FOR DOCUMENTS YOU DO%"f NEED!TOTAL NUMBER'OF COPIES REQUIRED: LTTR 14 ENCL 14

~s ,4 Indiana Michigan Power Company Cook Nuclear Plant One Cook Place~Bridgman, Ml 49106 616 465 5901 September 6, 1993 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:

Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of August 1993 is submitted.

Respectfully, A.A.Blind Plant Manager Attachment c;NRC Region III D.R.Hahn R.C.Callen S.Hamming J.G.Keppler INPO Records Center ANI Nuclear Engineering Department E.E.Fitzpatrick R.L.Simms W.G.Smith, Jr.S.J.Brewer D.W.Paul S.H.Steinhart J.L.Leichner J.A.Isom D.G.Turner E.A.Smarrella J.C.Krieger B.A.Svensson D.F.Krause M.E.Russo ry<<930,92201%6 930831 m~PDR'" ADOCN 05000315 R.PDR N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE SEPT 6, 1993 COMPLETED BY JD JANISSE TELEPHONE 616-465-5901 OPERATING STATUS l.Unit Name D.C.Cook Unit 1 2.Reporting Period AUG 1993 notes 3.Licensed Thermal Power (MWt)3250 4.Name Plate Rating (Gross MWe)1152 5.Design Electrical Rating (Net MWe)1020 6.Maximum Dependable Capacity (GROSS MWe)1056 7.Maximum Dependable Capacity (Net MWe)1000 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.Power eve o c estric e.10.Reasons For Restrictions.

If Any: ny et e is o.r.to ate ll.Hours in Reporting Period 744.0 5831.0 12.No.of Hrs.Reactor Was Critical 744.0 5831.0 13.Reactor Reserve Shutdown Hours 0.0 0.0 14.Hours Generator on Line 744.0 5831.0 15.Unit Reserve Shutdown Hours 0.0 0.0 16.Gross Therm.Energy Gen.(MWH)2414864 18732648 17.Gross Elect.Energy Gen.(MWH)764060 46748170 18.Net Elect.Energy Gen.(MWH)736627 5845958 19.Unit Service Factor 100.0 100.0 20.Unit Availability Factor 100.0 100.0 21.Unit Capacity Factor (MDC Net)99.0 100.3 22.Unit Capacity Factor (DER Net)96.1 98.2 23.Unit Forced Outage Rate 0.0 0.0 24.Shutdowns Scheduled over Next Six Months (Type, Date,and Refuelin outa e to be in Februar 5 1994 f estimated duration of 90 da s.umm.163631.0 122725.4 463.0 120679.6 321.0 354174971 115002530 110608323 74.7 74.7 67.2 65.5 6.2 Duration):

25.ut own t n o eport erio , stimate ate o artup: 26.nits in est atus rior to ommercia INITIAL CRITICALITY INITIAL ELECTRIC ITY COMMERCIAL OPERATION peration: Forcast Achieved AVERAGE DAILY POWER LEVEL (HWe-Net)MONTH DOCKET NO.50-315 UNIT ONE DATE SEPT 6, 1993 COMPLETED BY JD JANISSE TELEPHONE 616-465-5901 AUGUST 1993 DAY 1 2 3 5 6 7 8 9 10 ll 12 13 14 15 16 AVERAGE DAILY POWER LEVEL 988 985 990 987 987 992 996 997 996 991 985 987 983 990 987 981 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL 985 1004 987 994 1003 997 993 984 988 981 980 981 996 996 1003 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: AUGUST 1993 UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

D.C.COOK UN$T 1 September 9, 1993 R.D.Reynnelik (616)465-5901'URATION NO.DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.CODE CODE TO PREVENT RECURRENCE None There were no unit shutdown or significant power reductions from 100%RTP this month.1 F: S$Forced Scheduled 2 Reason: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 Method: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)4 Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 1061)5 Exhibit I: Same Source DOCKET NO.UNIT NAME: COMPLETED BY: TELEPHONE:

DATE PAGE 50-315 D.C.Cook Unit 1 R-D.Reynnells (616)465-5901 Sept.9, 1993 Page 1 of 1 MONTHLY OPERATING ACTIVITIES

-AUGUST 1993 HIGHLIGHTS The unit entered the reporting period in Mode 1 at 100 4 RTP.The unit exited this reporting period in Mode 1 at 100%RTP.There were no challenges to the pressurizer safety valves or power operated relief valves.Gross Electrical generation for the month'of August was 764060 MWH.DETAILS The unit remained at 100%power for the entire reporting period.

~~(e DOCKET NO: UNIT NAME: COMPLETED BY: TELEPHONE:

DATE PAGE: 50-315 D.C.Cook Unit 1 M.E.Russo (616)465-5901 September 6, 1993 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE

-Au ust.1993 No major safety-related maintenance items are included for the month of August.