ML17335A333

From kanterella
Revision as of 07:08, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Plant,Unit 1.With 981105 Ltr
ML17335A333
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/31/1998
From: CENTER J F, COOPER D E, MINOR J W
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9811170290
Download: ML17335A333 (8)


Text

CATEGORYj.REGULATYINFORMATION DISTRIBUTIO YSTEM(RIDS)lACCESSION NBR:9811170290 DOC.DATE:

98/10/31NOTARIZED:

NODOCKETIFACIL:50-315 DonaldC.CookNuclearPowerPlant,Unit1,IndianaM05000315AUTH:~~22kE

.AUTHOR'AFFILIATION MINOR,J.W.

,AmericanElectricPowerCo.,Inc.CENTER,J.'F.

AmericanElectricPowerCo.,Inc.COOPER,D.E.

AmericanElectricPowerCo.,Inc.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthlyoperating reptforOct1998forDCCookNuclearPlant,Unit1.With981105ltr.ADISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:ERECIPIENT IDCODE/NAME PD3-3PDINTERNAL:

AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL:

LITCOBRYCE,JHNRCPDRCOPIESLTTRENCL1111111111RECIPIENT IDCODE/NAME STANG,J-EIGEKTZMRGN3NOACCOPIESLTTRENCL11111111D'NNOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTS'RREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:

LTTR9ENCL9 AmericanElectricPo~CookNuclearPlantOneCookPlaceBridgman, Ml491066164655901U.S.NuclearRegulatory Commission ATTN:DocumentControlDeskWashington, D.C.20555November5,1998Gentlemen, Pursuanttotherequirements ofDonaldC.CookNuclearPlantUnit1Technical SpeciTication 6.9.1.8,theattachedMonthlyOperating ReportforthemonthofOctober1998issubmitted.

Sincerly,ooperPlantManagerIjcAttachment NRCRegionIIIINPORecordsCenterANINuclearEngineering Department D.R.HahnS.HammingB.LewisR.P.PowersJ.R.SampsonB.L.BartlettP.A.BarrettJ.B.KingseedD.W.PaulD.L.NobleW.H.SchalkD.G.TurnerG.JohnD.P.LynchR.G.PickardG.T.Gaffney98iii70290 98i03iPDRADOCK05000Si5RPDR

~II1'I1 DOCKETNO.DATECOMPLETED BYTELEPHONE 50-315November5,1998JWMinor616-465-5901 D.COPERATING STATUS1.UnitName2.Reporting Period3.LicensedThermalPower(MWt)4.NamePlateRating(GrossMWe)5.DesignElectrical Rating(NetMWe)6.MaximumDependable Capacity(GROSSMWe)7.MaximumDependable Capacity(NetMWe)CookUnit1Oct-9832501152102010561000Notes:8.IfChangesOccurinCapacityRatings(Itemsno.3through7)SinceLastReportGiveReasons:9.PowerLevelToWhichRestricted, IfAny(NetMwe):10.ReasonsForRestrictions, IfAny:11.HoursinReporting Period12.No.ofHrs.ReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator onLine15.UnitReserveShutdownHours16.GrossThermalEnergyGen.(MWH)17.GrossElectrical EnergyGen.(MWH)18.NetElectrical EnergyGen.(MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(MDCNet)22.UnitCapacityFactor(DERNet)23.UnitForcedOutageRateThisMonth744.00.00.00.00.00.00.00.00.00.00.00.0100.0Year-to-Date 7296.00.00.00.00.00.00.00.00.00.00.00.0100.0Cumulative 208920.0151285.3463.0148821.1321.0440194814.0 143013940.0 137597640.0 71.971.965.664.011.524.Shutdowns Scheduled overNextSixMonths(Type,Date,andDuration):

None25.IfShutDownAtEndofReportPeriod,Estimated DateofStartup:TobeDetermined.

26.UnitsinTestStatus(PriortoCommercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION ForecastAchieved DOCKETNO.UNITNAMEDATECOMPLETED BYTELEPHONE 50-315D.C.CookUnit1November5,1998JWMinor616-465-5901 AVERAGEDAILYPOWERLEVEL(MWe-Net)

October1998DAYAVERAGEDAILYPOWERLEVELDAYAVERAGEDAILYPOWERLEVEL10/1/9810/2/9810/3/9810/4/9810/5/9810/6/9810/7/9810/8/9810/9/9810/10/9810/11/9810/12/9810/13/9810/14/9810/15/9810/16/9810/17/9810/18/9810/19/9810/20/9810/21/9810/22/9810/23/9810/24/9810/25/9810/26/9810/27/9810/28/9810/29/9810/30/9810/31/98 DOCKETNO.UNITNAMEDATECOMPLETED BYTELEPHONE PAGE50-315D.C.CookUnit1November5,1998JFCenter616-697-5098 1of1MONTHLYOPERATING ACTIVITIES

-October1998HIGHLIGHTS Theunitenteredthisreporting periodinMode5at0%RTP.Theunitexitedthisreporting periodinMode5at0%RTP.Therewerenochallenges tothepressurizer safetyvalvesorpoweroperatedreliefvalves.Grosselectrical generation forthemonthofOctoberwas0MWh.DETAILS10/01/98TheReactorwasshutdown09/08/97toresolvedesignbasisquestions discovered duringtheNRCArchitect andEngineering (AE)Inspection.

'lltimesareinEasternStandardTime(EST).

DOCKETNO.UNITNAMEDATECOMPLETED BYTELEPHONE PAGE50-315D.C.CookUnit1November5,1998JFCenter.616-697-5098 1of1UNITSHUTDOWNS ANDPOWERREDUCTIONS

-October1998METHODOFSHUTTINGLICENSEEDURATIONDOWNEVENTSYSTEMCOMPONENT NO.DATETYPE"HOURSREASON2REACTOR3REPORTNO.CODE4CODE5CAUSEANDCORRECTIVE ACTIONTOPREVENTRECURRENCE 333090897F720.097-01097-01197-01297-01397-01497-016N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/ATheunitwasshutdowntoresolvedesignbasisquestions discovered duringtheNRCArchitect andEngineering (AE)Inspection.

1TYPE:F:ForcedS:Scheduled 2REASON:A:Equipment Failure(Explain)

B:Maintenance orTestC:Refueling D:Regulatory Restriction E:OperatorTrainingandLicenseExamination F:Administrative G:Operational Error(Explain)

H:Other(Explain) 3METHOD:1:Manual2:ManualScram3:Automatic Scram4:Other(Explain) 4SYSTEM:ExhibitG-Instructions forpreparation ofdataentrysheetsforLicenseeEventReport(LER)File(NUREG0161)5COMPONENT:

ExhibitI:SameSource aQEl