Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
17.REGULATOINFORMATION,DISTRIBUTIONSYSTEM(RIDS)4ACCESSIONNBR:9606210072DOC.DATE:96/05/31NOTARIZED:NO'ACIL:S0-335St.LuciePlant,Unit1,FloridaPoweraLightCo.50-389,St.LuciePlant,Unit2,FloridaPower6LightCo.AUTH.NAME"AUTHORAFFILIATIONROGERS,J.A.FloridaPoweraLightCo.STALL,J.A.:FloridaPowerSLightCo.RECIP.NAMERECIPIENTAFFILIATIONDOCKET0500033505000389
SUBJECT:
MonthlyoperatingreptsforMay1996forStLucieUnits1&2.W/960612ltr.DISTRIBUTIONCODE:IE24DCOPIESRECEIVED:LTRENCLSIZE:TITLE:MonthlyOperatingReport(perTechSpecs)NOTES:RECIPIENTIDCODE/NAMEPD2-3PDCOPIESRECIPIENTLTTRENCLIDCODE/NAME11WIENSiL.COPIESLTTRENCL11INTERNAL:RSRGN2111111AEOD/SPD/RRABNRR/DRPM/PECB1111EXTERNAL:LITCOBRYCEiJHNRCPDR1111NOAC11NOTETOALL"RIDS"RECIP1ENTS:PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFNSD-5(EX'15-2083)TOELIMINATEYOURNAMEFROMDISTRIBUTIONLISTSFORDOCUMENTSYOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:LTTR10ENCL10 FloridaPower5LightCompany,P.O.Box128,FortPierce,FL34854-01283Ull121596L-96-14510CFR50.36U.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,DC20555Re:St.LucieUnits1and2DocketNos.50-335and50-389PursuanttoTechnicalSpecification6.9.1.6,attachedaretheMay1996,OperatingData,SummaryofOperatingExperience,AverageDailyUnitPowerLevel,andUnitShutdownsandPowerReductionsReportsforSt.LucieUnits1and2.Shouldtherebeanyquestionsonthisinformation,pleasecontactUS~Verytrulyyours,J.A.Stall,VicePresidentSt.LuciePlantJAS/SLAttachmentscc:StewartD.Ebneter,RegionalAdministrator,RegionII,USNRCSeniorResidentInspector,USNRC,St.LuciePlant96062i007296053iPDRADGCK05000335IRPDRI,anFPLGroupcompany r
EOPERATINGDATAREPORTOPERATINGSTATUSDOCKETNO50-335DATE6/7/96FPLLICENSINGGROUP-JUNOTELEPHONE407/694/4432UNITNAME:ST.LUCIEUNIT1REPORTINGPERIOD:MAY1996LICENSEDTHERMALPOWER(MWT):2700NAMEPLATERATZNG(GROSSMWE):850DESIGNELECTRICALRATING(NETMWE):830MAXIMUMDEPEMDABLECAPACITY(GROSSMWE):872MAXIMUMDEPENDABLECAPACITY(NETMWE):839IFCHANGESOCCURINCAPACITYRATINGS(ITEMSNUMBER3THROUGH7)SINCELASTREPORTiGIVEREASONS9POWERLEVELTOWHICHRESTRICTEDiIFANY(NETMWE)10REASONSFORRESTRICTIONSiIFANYMONTHLY-YTD-CUMULATIVE11.HOURSINREPORTPERIOD:12.NUMBEROFHOURSREACTORWASCRITICAL13.REACTORRESERVESHUTDOWNHOURS14.HOURSGENERATORONLINE15.UNITRESERVESHUTDOWNHOURS16.GROSSTHERMALENERGYGENERATED(MWH)17.GROSSELECTRICALENERGYGENERATED(MWH)18.NETELECTRICALENERGYGENERATED(MWH)19.UNITSERVICEFACTOR20.UNITAVAZLABILITYFACTOR21.CAPACITYFACTOR(USINGMDCNET)22.CAPACITYFACTOR(USINGDERNET)23.UNITFORCEDOUTAGERATE7440.00.00.00.00.00.00.00.00.00.00.00.036472822.50.02797.00.074027692422760229326276.776.774.975.72.2170447.0132862.40.0131418.60.034087955811241178010623853577.177.174.375.15.024.SHUTDOWNSSCHEDULEDOVERNEXT6MONTHS:25.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:7/19/96.
DOCKETNO.:UNIT:DATE:COMPLETEDBY:TELEPHONE:50-335St.Lucie¹1June7,1996J.A.ROGERS(407)467-7296REPORTMONTHUnit1remainedofflinefortheentiremonthforCycle14refuelingandmaintenance.InaccordancewiththerequirementsofTechnicalSpecification6.9.1.6,therewerenochallengestothepoweroperatedreliefvalvesorthesafetyvalvesduringthereportperiod.
AVERAGEDAILYUNITPOWERLEVELDOCKETNO.:UNIT:DATECOMPLETEDBY:TELEPHONE:50-335St.Lucie¹1dune7,1996aT.A.ROGERS(407)467-7296DAYMONTHAVERAGEDAILYPOWERLEVEL(MWe-Net)05/01/9605/02/9605/03/9605/04/9605/05/9605/06/9605/07/9605/08/9605/09/9605/10/9605/11/9605/12/9605/13/9605/14/9605/15/9605/16/9605/17/9605/18/9605/19/9605/20/9605/21/9605/22/9605/23/9605/24/9605/25/9605/26/9605/27/9605/28/9605/29/9605/30/9605/31/96
UNITSHUTDOWNSANDPOWERREDUCTIONSDOCKETNO.:UNITNAME:DATE:COMPLETEDBY:TELEPHONE:50-335STLUCIEUNITIJune7,1996J.A.ROGERS(407)467-7296REPORTMONTHhhy~KNo.DateTypeDuration(Hours)Reason'ethodofShuttingDownReactor'icenseeEventReport¹SystemCode'omponentCode'ause&CorrectiveActiontoPreventRecurrence4/29/96744N/ARCVESSELUnitlofflineforCycle14refuelingandmaintenance.FForcedSScheduledReasonA-Equipmentfai!ure(explain)8-MaintenanceorTestC-RefuelingD-RegulatoryrestrictionE-OperatorTrainingg:LicenseExaminationF-AdministrativeG-OperationalError(Explain)H-Other(Explain)MethodI-Manual2-htanualScram3-AutomaticScram4-Continued5-LoadReduction9-Other(Explain)ExhibitG-InstructionsforpreparationofDataEntrySheetsLicenseeEventReport(LER)File(NUREG416l)5ExhibitI-SameSource0915srFPL K.r OPERATINGDATAREPORTOPERATINGSTATUSDOCKETNO50"389DATE6/7/96FPLLICENSINGGROUP-JUNOTELEPHONE407/694/44321.UNITNAME:ST.LUCIEUNIT22.REPORTINGPERIOD:MAY19963.LICENSEDTHERMALPOWER(MWT):27004.NAMEPLATERATING(GROSSMWE):8505.DESIGNELECTRICALRATING(NETMWE):8306.MAXIMUMDEPEMDABLECAPACITY(GROSSMWE):8827.MAXIMUMDEPENDABLECAPACITY(NETMWE):8398.IFCHANGESOCCURINCAPACITYRATINGS(ITEMSNUMBER3THROUGH7)SINCELASTREPORT,GIVEREASONS:9.POWERLEVELTOWHICHRESTRICTED,IFANY(NETMWE)10.REASONSFORRESTRICTZONS,IFANY:MONTHLY-YTD-CUMULATIVE11.HOURSINREPORTPERIOD:12.NUMBEROFHOURSREACTORWASCRITICAL13.REACTORRESERVESHUTDOWNHOURS14.HOURSGENERATORONLINE15.UNITRESERVESHUTDOWNHOURS16.GROSSTHERMALENERGYGENERATED(MWH)17.GROSSELECTRICALENERGYGENERATED(MWH)18.NETELECTRICALENERGYGENERATED(MWH)19.UNITSERVICEFACTOR20.UNITAVAILABILITYFACTOR21.CAPACITYFACTOR(USINGMDCNET)22.CAPACITYFACTOR'(USINGDERNET)23.UNITFORCEDOUTAGERATE7447440.07440.0198452965545062150810010099.61000.036473603.90.03487.40.091232153025530286181395.695.693.594.51.7112344.094474.50.092926.10.0241585937800862007565248182.782.780.381.16.524.SHUTDOWNSSCHEDULEDOVERNEXT6MONTHS:25.ZFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:
DOCKETNO.:UNXT:DATE:COMPLETEDBY:TELEPHONE:50-389St.Lucie¹2June7,1996J.A.ROGERS(407)467-7296REPORTMONTHUnit2operatedatessentiallyfullpowerfortheentiremonth.InaccordancewiththerequirementsofTechnicalSpecification6.9.1.6,therewerenochallengestothepoweroperatedreliefvalvesorthesafetyvalvesduringthereportperiod.
,AVERAGEDAILYUNITPOWERLEVELDOCKETNO.:UNIT:DATE:COMPLETEDBY:TELEPHONE:50-389St.LucieN2June7,1996J.AROGERS(407)467-7296DAY05/01/9605/02/9605/03/96O5/O4/9605/05/9605/06/9605/07/9605/08/9605/09/9605/10/9605/11/9605/12/9605/13/9605/14/9605/15/9605/16/9605/17/9605/18/9605/19/9605/20/9605/21/9605/22/9605/23/9605/24/9605/25/9605/26/9605/27/9605/28/9605/29/9605/30/9605/31/96MONTHAVERAGEDAILYPOWERLEVEL(Mwe-Net)847848848849850847850850849842845850848847843846843843847847846848843795720727846842848846798
~~tgI)
~JUNITSHUTDOWNSANDPOWERREDUCTIONSDOCKETNO.:50-389~~UNITNAME:STLUCIEUNIT2DATE:June7,1996COMPLETEDBY:J.A.ROGERSTELEPHONE:(407)467-7296REPORTMONTHhfay~5No.DateTypeDuration(Hours)ReasonsMethodofShuttingDownReactor'icenseeEventReportSystemCode'omponentCode'ause&CorrectiveActiontoPreventRecurrenceUnit2operatedatfullpowerfortheentiremonth.IFForcedSScheduled2ReasonA-Equipmentfailure(explain)I)-MaintenanceorTestC-RefuelingD-RegulatoryrestrictionE-OperatorTrainingg:LicenseExaminationF-AdmmistrativeG-OperationalError(Explain)H-Other(Explain)3MethodI-Manual2-ManualScram3-AutomaticScram4-Continued5-LoadReduction9-Other(Explain)4ExhibitG-InstructionsforPreparationofDataEntrySheetsLicenseeEventReport(LER)File(NUREG41161)ExhibitI-SameSourcetslsslFPt.