Application for Amends to Licenses DPR-66 & NPF-73,which Modifies Unit 1 Design Feature Section 5.2.1 to Add ZIRLO as Fuel Assembly Matl & Adds Ref to NRC Approved WCAP-12610 to Administrative Control 6.9.1.12 for Both Units
ML20147E624
Person / Time
Site: Beaver Valley
Issue date: 03/10/1997
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20147E628 List:
References
NUDOCS 9703180063
Download: ML20147E624 (2)


Text

. - - - . .- -- _ .- .

y Valley Power Station 1 SNppingport. PA 15077 0004 i SUSHIL C. JAIN (412) 393 5512 V President March 10, 1997 Fax (412) 643-8069 Nuclear Power Division i

U. S. Nuclear Regulatory Comimssion  ;

Attention: Document Control Desk Washington, DC 20555-0001

)

Subject:

Beaver Valley Power Station, Unit No. I and No. 2 )

i BV-1 Docket No. 50-334, License No. DPR-66

BV-2 Docket No. 50-412, License No. NPF-73 j Proposed Operating License Change Request Nos. 238 and 114 Pursuant to 10 CFR 50.90, Duquesne Light Company requests an amendment to the above licenses in the form of a change to the technical specifications. The proposed change modifies Unit 1 Design Feature Section 5.2.1 to add ZIRLO as fuel assembly I material and adds reference to NRC approved WCAP-12610 to Administrative Control l

6.9.1.12 for both units. l The proposed technical specification change is presented in Attachment A. The safety analysis (including the no significant hazards evaluation) is presented in Attachment B.

J Thi; change has been reviewed by the Onsite Safety Committee and Offsite Review l Committee. The change was detennined to be safe and does not involve a significant hazard consideration as defined in 10 CFR 50.92 based on the attached safety analysis.

I Approval of this amendment is requested for September 5, 1997. An  ;

implementation period of up to 60 days is requested following the effective date of this  ;

l amendment.

Sincerely, 1

i Sushil C. Jain

[h c: Mr. D. M. Kern, Sr. Resident Inspector Mr. H. J. Miller, NRC Region 1 Administrator Mr. D. S. Brinkman, Sr. Project Manager DEllVERING Mr. W. P. Dornsife, Director BRP/DEP QUALITY Mr. M. P. Murphy (BRP/DEP) ENERGV E 8 *!8882 E88o834 IRI.URPPEE.E.E P PDR ,.

_ _ _ _ - . _ . ~ . . . .__ _ . _ . _ _ _ . . . . _ _ _ _ _ _ _. . . __ _ _

1 .

AFFIDAVIT FOR APPLICATION i '

OF AMENDMENT 2

COMMONWEALTH OF PENNSYLVANIA) I

) SS: i

COUNTY OF BEAVER )

1 i

i

Subject:

Beaver Valley Power Station, Unit No. I and No. 2  !

, BV-1 Docket No. 50-334, License No. DPR-66 l

{ BV-2 Docket No. 50-412, License No. NPF-73 l Proposed Operating License Change Request Nos. 238 and 114 Before me, the undersigned notary public, in and for the County and Commonwealth aforesaid, this day personally appeared Sushil C. Jain, to me known, who being duly sworn according to law, deposes and says that he is Division Vice President, Nuclear Services of the Nuclear Power Division, Duquesne Light Company, l he is duly authorized to execute and file the foregoing submittal on behalf of said l Company, and the statements set forth in the submittal are true and correct to the best of his knowledge, information and belief.