Forwards IE Inspec Repts 50-324/78-24 & 50-325/78-24 on 780918,20-22,26-28 During Which No Items of Noncompliance Were Noted
ML20062D120
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 10/11/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20062D123 List:
References
RII:JJB, NUDOCS 7811200029
Download: ML20062D120 (2)


See also: IR 05000324/1978024

Text

, .,

'

m UNITED STATES  ;. * */'

' [e " Ecog o, NUCLEAR REGULATORY COMMISSION

~

.

,'

[ k REG!oN 11 ' -

{ ,- , f ,

'-*-

i 101 MARIETTA STREET, N W. (, . * *

,

o [ ATLANTA, GEORGIA 30303

%, ' #

__

....." OCT 11 B78

In Reply Refer To:

RII:JJB

50-324/78-24

~ 50-325/78-24

Carolina Power and Light Company

ATTN: Mr. J. A. Jones

Executive Vice President l

Engineering, Construction

and Operation ,

1

336 Fayetteville Street

Raleigh, North Carolina 27602

Gentlemen:

This refers to the inspection conducted by Mr. J. J. Blake of this office on

September of activities authorized by NRC Operating License Nos. DPR-62 and

DPR-71 for the Brunswick Steam Electric Plant, Unit Nos. I and 2 facilities,

and to the discussion of our findings held with Messrs. Banks and Tollison

at the conclusion of the inspection.

Area.s examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor) believe

to be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure. Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information is

proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

781120042.74

~ . .. . . _ .

,

>

-

.

  • *

. i

,

A

, .

Carolina Power and Light -2-

INMII) '  !

i

Company 1

i

.

1

i

Should.you have any questions concerning this letter, we will be glad to

discuss them with you. .

Sincerely,  !

CA .. CW

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

r

. Enclosure:

,

Inspection Report Nos.

! 50-324/78-24 ,

50-325/78-24

4

cc w/ encl:

1 Mr. A. C. Tollison, Jr.

Plant Manager  !

4

Box 458

Southport, N. C. 28461  !

!

3 C. C. Williams

Region III ,

.

! .

.

t

J

,

}

r

L

'

,

E

!

+

1

b

r

i

l

-

t

Y

A

'- -

. - . . , _