Concurs W/Determination That Schedular Relief from ASME Boiler & Pressure Vessel Code Section Xi,Subarticle IWA-2400 Requirement Re Hydrostatic Pressure Testing of Piping & Components Not Required,Per 880121 Request
ML20150D646
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/08/1988
From: Adensam E
Office of Nuclear Reactor Regulation
To: Utley E
CAROLINA POWER & LIGHT CO.
References
TAC-67125, NUDOCS 8807140088
Download: ML20150D646 (2)


Text

. . -. . .

t r

. 9. <

OISTRIBUTION Occket No. 50-324 DocketJ11e/ E. Jordan (MNB8 3302)

NRC PDR B. Grimes (9A2)

Mr. E. E. Utley Local POR C. Y. Cheag (9H15)

Senior Executive Vice President P021 r/f ACRS (10)

Power Supply and Engineering & Construction S. Varga (14E4)

Carolina Power & Light Company G. Lainas P. O. Box 1551 P. Anderson Raleigh, North Carolina 27602 B. Mozafari

1. Buckley

Dear Mr. Utley:

OGC

SUBJECT:

WITH0RAWAL 0F HYOR0 STATIC TEST SCHEDULAR RELIEF REQUEST, BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 (TAC N0. 67125)

By lette; dsted January 21, 1988, you requested schedular relief from the ASME Boiler and Pressure Vessel Code,Section XI, Subarticle IWA-2400, requirement that hydrostatic pressure testing of piping and components be completed by the end of each ten-year inspection interval. The schedular relief requested was based on a modified end date of November 30, 1988 for the first ten-year interval for the Brunswick Steam Electric Plant, Unit 1.

In your letter dated May 2,1988, you stated that only one outage of at least six months hac been :ised to modify the end date of the first ten-year interval, resulting in an end date of November 30, 1988. The code allows the inspection interval to be extended for a period equal to the sum of all outages of six months of longer. Thus, the code would permit the additional use of an eight-month outage (from March 19, 1985 through November 8, 1985) to set the ending date of the interval. When the length of the additional outage is added, the recalculated end of the first ten-year interval is July 22, 1989. Based on the new ending date, the relief request of January 21, 1988 was determined unnecessary and, therefore, was withdrawn.

The staff has reviewed the infor.7.ation provided in the letters dated January 21, 1988, and May 2, 1988. Based on the review, the staff has determined the modified ending date for the first ten-year inspection interval for the Brunswick Steam Electric Plant, Unit 1, is in compliance with paragraph n !WA-2400(c) of Section XI of tne ASME Boiler and Prc:sure Vessel Code. ,

c)@ Therefore, we agree with your determination that schedulcr relief for

-go. conducting the hydrostatic pressure test is not required.

00 gg Sincerely, is ec \b\

p Elinor G. Adensam, Director Project Directorate 11-1

@@M 0)o Division of Reactor Prcjects 1/11 cc: See next page '(0(

OFC :LA:PDP R:PE :DRPR:P 021:0RPR: EMTB: DEST f)

0 #021-

/

PR :

Y

. . . . . : . . . ., 7 : . : ..I .....: . . . . : . . gg. . . : .Lg . . . . . . . : . . . . . . . . . . . :: .' . . . . . . . .

NAME : PAnd  ! :BMi afari:ch: 88u ley  : Cwtieng  : EAd sam  :  :

DATE : 7/7,/88  ;.. . . :. 7/8

. : . ./ .88

. . . .: . 7/4;/88

. . . . : . . .: . .7/. . . . . . .:: .7/. . /88

. b(/ f,8 0FFICIAL RECORD COPY

.1/., .

l Mr. E. E. Utley Brunswick Steam Electric Plant Carolina Power & Light Company Units 1 and 2 cc:

Mr. P. W. Howe Mr. C. R. Dietz Vice President Plant General Manager Brunswick Nuclear Project Brunswick Nuclear Project Box 10429 Box 10429 Southport, North Carolina 28461 Southport, North Carolina 28461 Mr. R. E. Jones, General Counsel Mr. H. A. Cole Caroiina Power & Light Company Special Deputy Attorney General P. 0. Box 1551 State of North Carolina Raleigh, Nortn C>rolina 27602 Post Office Box 629 Raleign, North Carolina 27602 Mr. Mark S. Calvert -

)

Associate General Counsel Mr. Robert P. Gruber Carolina Power & Light Company Executive Director Post Office Box 1551 Public Staff - NCUC Raleign, North Carolina 27602 Post Office Box 29520 Raleigh, North Carolina 27626-0520 Mr. Christopher Chappell, Chairman Board of Commissioners I Post Office Box 249 Bolivia, North Carolina 28422  !

x*

Mrs. Chrys Baggett State Clearingnouse l Budget and Management  :

116 West Jones Street l Raleign, North Carolina 27603 l l

Resident Inspector l U. S. Nuclear Regulatory Commission Star Route 1 Post Office Box 208 Southport, North Carolina 28461 Regional Administrator, Region II U. S. Nu: lear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30323 Mr. Dwayne H. Brown, Chief Radiation Protection Branch Division of Facility Services N. C. Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008

- a.-e - - g --- .-v. y,-m y. 9  %.,q,.w,, ic _

9<, 4 m.9e..---mw

=x y m 9 y .--