ML20084G271

From kanterella
Revision as of 01:43, 26 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Forwards Revised Attachment to Application for Amend to License NPF-5,revising Methodology for Conducting Significant Hazards Reviews of Traversing in-core Probe Sys
ML20084G271
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/02/1984
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20084G275 List:
References
NED-84-241, TAC-53398, NUDOCS 8405070148
Download: ML20084G271 (2)


Text

. ....... _ _ .. _ .._.

Georgia Power Company

, 333 P4edmont Avenue 4 At:anta. Georg.a 30308 --

Tetephore 404 526 6526 Ma.i.nq Ad&ess Post Offee Box G5 E Attanta. Georga 30302 L

Geomia a Power n L T. Gucwa U- /N m en C ,

Manager NucMar Eng noenng and Chet Neear Engr.eer di NED-84-241

=

May 2, 1984 -

Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 "

Division of Licensing U. S. Nuclear Regulatory Ccmnission '

Washirgton, D. C. 20555 _

5 NRC DOCKEIS 50-321, 50-366 -

OPERATING LICENSES DPR-57, NPF-5 EIMIN I. HA'ICH NUCLEAR PIANP UNITS 1, 2 REVISION OF PREVIOUS REQUESTS EOR TEDINICAL SPEEIFICATION AMENDMENIS --

f Gentlemen:

On December 21, 1983, Georgia Power Company (GPC) subnitted a request for changes to the Plant Hatch Unit 2 Technical Specification requirements I for usage of the Traversirg Incore Probe (TIP) system. 'Ihis subnittal l contained a significant hazards evaluation as required by 10 CFR 50.92 4 (Attachnent 3 to that subnittal) .

Recently, GPC revised its methodology for conductirg significant hazards reviews for Technical Specification charge proposals. As a result of this, GPC has rewritten the wording subnitted to the NRC in the above mentioned ==-

letter. This revised review does not result in a change to the conclusions g drawn in the original subnittal. The attachnent enclosed with this letter should be used to replace Attachment 3 to the December 21, 1983 TIP E subnittal. Note that the attachnent number and title at the top of the enclosure to this letter coircide with the headirg used in the previous -

subnittal.

=

E R

8405070148 840502 ,'

PDRADOCK05000g -

e -

005 '.

I(;  ;

i 3

s Georgia Power d Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Beactors Branch No. 4 May 2, 1984 Page Two Purtuant to the requirements of 10 GR 50.91, Mr. J. L. Ledbetter of the Environmental Protection Division of the Georgia Department of Natural Resources will be sent a copy of this letter and the attachment.

cs&f L. T. Gucwa CBS Enclosure xc: H. C.' Nix, Jr.

Senior Resident Inspector J. P. O'Reilly, (NRC-Region II)

J. L. Ledbetter 700775

_