Monthly Operating Repts for Aug 1984
ML20093E471
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/31/1984
From: Kenyon B, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2305, NUDOCS 8410120131
Download: ML20093E471 (10)


Text

_ . .

_N4 g AVERAGE DAILY UNIT POWER LEVEL g

D i v i h 50-387 DOCKET NO.

(#1 ----

f L. 9 " %;

UNIT One

%O/ IC Si COMPLETED BY DAIT TELEPHONE 09/10/84 L.A. Kuczynski (717)542-3759 MONM August, 1984 ,

i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1014 1024

_ g7 2 1014 710 18 3 1015 39 971 _

4 1015 20 1034 5 850 993 21 6 1020 1033 22

~

7 1021 1030 3 _

g 1022 24 1036 9 1020 1028 25 10 1025 26 959 11 1014 1033 27 -

12 971 1026 28 13 1020 1022 29 14 1020 1021 30 15 1027 1031 3

16 1028 C l

INSTRUC110NS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

l l (9/77) 8410120131 840831 DR ADOCK 05000

{}

I t

\

l . . - _ , -- - - - - - --- ---

, ANN 4 h, s*y O@

W _ ____ E L ,t 1 -~ 2"F* J OPERATING DATA REPORT C DOCKET NO. 50-387 O M DATE 09/10/84 kiC sf COMPLETED BY L.A. Kuczynski TELEPHONE (717)S42-3759 OPERATING STATUS Unit 1 Susquehanna Steam Electric Station Notes

1. Unit Name. Corrections to July, 1984
2. Reporting Period: Aug u s t , 1984 ltem 12: 561.5
3. Licensed Thermal Power (MWt): 3293 Item 14: 522.1
4. Nameplate Rating (Gross MWe): 1152 These new values are re-
5. Design Electrical Rating (Net MWe): 1065 flected in Y-T-D & Cumulative
6. Maximum Dependable Capacity (Gross MWe): 1068 columns in the August report.
7. Maximum Dependable Capacity (Net MWe): 1032
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reawns:

None

9. Power Level To which Restricted,If Any (Net MWe): None
10. Reasons For Restrictions. lf Any: None This Month Yr..to.Date Cumulative
11. Hours In Reporting Period 744 5,855 10,824
12. Number Of Hours Reactor Was Critical 744 3,893.5 7,738.8
13. Reactor Reserve Shutdown Hours 0 249.1 405.8
14. Hours Generator On.Line 744 3,768.9 7,537.2
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 2.392.310 11,467,140 22,728,801 17 Gross Electrical Energy Generated (MWH) 772,140 3,737.610 7,404,160
18. Net Electrical EnerEy Generated (MWH) 745.057 3,598,837 7,135,210
19. Unit Service Factor 100 64.4 69.6
20. Unit Availability Factor 100 64.4 69.6
21. Unit Capacity Factor (Using MDC Net) 97 59.6 63.9
22. Unit Capacity Factor (Using DER Net) 94 57.7 61.9
23. Unit Forced Outage Rate 0 17.8 15
24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each1:

Refuelino Outaae: February 9, 1985: 13 weeks.

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (4/77 )

4MANN4 1J 4[~8} '

+ .

.3 e '. 1 Ej Y. -

Lh ML UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387 ,

p UNIT NAME One l fp DATE 09/10/84 D ggg COMPLETED BY L.A. Kuczynsk i REPORT MONTil August, 1984 TELEPHONE (717)S42-3759

~.

r -

re 3 == = . -

S*

Licensee Cause & Corrective N,o. Date o

g

.=E e_

3g E

7sX

,, g 5 Event 5%

tt ?

c o 83 Action to NC '

$5 5 j 65 y Repori a Prevent Recurrence 5

10 840318 S 0 H 4 N/A RB CONRODS Scheduled Control Rod Sequence Ex-change to minimiz'e the control blade history effect on the fuel.

l Correct 'R 3ason ' code f ar Un t Shutdown #8 is 'G' Note:

Correct 'D arati an' for Jnit Shutdown #8 is 28.2.

I 2 3 4 F: Forced Reason: Mcthod: Exhibit G - Instructions ,

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data  !

B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee l C-Refueling 3- Automatic Scram. Event Report (LER) File INUREG-D-Regularory Restriction 4-Other (Explain) 0161)

Eoperator Training & Ucense Examination F-Administrative 5 G-Operational Euro IExplain) Exhibit I - Same Source (9/77) Il-Other (Explain)

-w 3:.

i

~

SUSQUEHANNA STER.M ELECTRIC STATION Docket Number 50-387 Date 09/10/84 Completed by L.A.-Kuczynski Telephone (717)S42-3759 Challenges to Main' Steam Safety Reilef Valves None.

Changes'to the Offsite' Dose Calculation Manual None.

Major Changes to Radioactive Waste Treatment Systems None.

1

I .

AVERAGE DAILY UNIT POWER LEVEL g+

(.l-l D 7 CO . . . . . E DOCKET NO. 50-388 l L "% UNIT Two l f DATE 09/10/84 COMPLEED BY L. A. Kuczynski RIC si TELEPHONE (717)542-3759 MON August, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 g7 0 2 0 253 18 3 118 442 39 _

4 348 20 393 3 356 21 392 6 368 450 22 7 52 433 23 -

3 0 312 24 9 96 25 307 10 235 26 0 11 0 98 27 12 0 ;g 146 13 248 0 29 14 0 0 30 15 0 3g 0 16 0 INSTRUCT 10NS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

,,-7.-_-,,--..,4 . . . - - - , - . . - - - - - - ,

_ _ _ _ _ _ _ _ _ . _ .-._ - -_..- _ , _ . - . - _ _ _ . ___._,.,.,,.._.__,__._,..m,

- hgANN4 %

u O", & l O) l 7 W- _ ____ _ 3 L 5- - - WJ OPERATING DATA REPORT Q N

$<p Ng O DOCKET NO. 50-388 O DATE 09/10/84 klC $Y COMPLETED BY L. A. Kuczynski TELEPHONE (717)542-3759

~

OPERATING STATUS Unit 2 Notes

1. Unit Name: Susquehanna Steam Electric Station
2. Reportin3P eriod: Au au s t . 1984
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe):
  • To be determined.
7. Maximum Dependable Capacity (Net MWe): _
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions. If Any: None This Month Yr.-to-Date Cumulative
11. Hours in Reperting Period 744 1,427 1,427
12. Number G Hours Reactor Was Critical 581.9 1,040.6 1,040.6
13. Reactor Leserve Shutdown Hours 162.1 342.4 342.4
14. Hours Generator On.Line 373.4 766.3 766.3
15. Unit Reserve Shutdown Hours 0 142.4 142.4
16. Gross Thermal Energy Generated (MWH) 470.952 944.986 944,986
17. Gross Electrical Energy Generated (MWH) 132.920 254.250 254.250
18. Net Electrical Energy Generated (MWH) 121,170 ,,231,451 231.451
19. Unit Service Factor NA NA NA
20. Unit Availability Factor NA NA NA
21. Unit Capacity Factor (Using MDC Net) NA NA NA
22. Unit Capacity Factor (Using DER Net) NA NA NA
23. Unit Forced Outage Rate NA NA NA
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):

Maintenance Outage: October 20, 1984: 8 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 09/04/84
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY 05/09/84 05/08/84 INITIAL ELECTRICITY 06/28/84 07/03/84 COMMERCIAL OPER ATION 12/31/84 (9/77) o

3 gANN4 aJf%:-]$+h

<- e, el lg d ~~~~ p* UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-388 UNIT NAME Two kb E 4 DATE 09/10/84 COMPLETED BY L.A. Kuczynski

  1. fC 5 REPORT MONTil Augu s t . 1984 TELEPHONE (717)542-3759

-, 5E 3 h Ek Licensee ,E n, h, Cause & Corrective No. Date g 3g ( jg5 Esent g7 o3' Action to H

$2 $ j6g Report # mV Prevent Recurrence 6

3 840726 S 57.2 B 3 84-013 ZZ ZZZZZZ Reactor scram for scheduled Startup Test. Due to an incorrectly completed (See attached page)

. 4 840807 5 53.1 B 3 ft/A ZZ ZZZZZZ Reactor scram as part of scheduled Startup Test.

5 840810 F 0 H N/A N/A HA XXXXXX Generator removed f rom grid for 53 9h to install missing gasket in main (See attached page) 6 840813 F 0 H N/A N/A HA XXXXXX Generator removed f rom grid for 95.7h (See attached page) 7 840826 F 28.6 A 3 84-017 HA VALVEX Reactor scram following turbine trip (See attached page) 8 840828 F 82.1 A 3 84-017 HA VALVEX Reactor scram following turbine trip (See attached page)

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 O her (Explain) 0161)

E-Operator Training & Ucense Examination F-Administrative 5 Goperational Error (Explain) Exhibit I - Same Source 19/77) Il-Other (Explain)

.w

~

+

s~

UNIT 2 SHUTDOWNS AND POWER REDUCTIONS (continued):

NO. 3 electrical lineup, the diesel generators were prevented f rom starting and an Unusual Event was declared. The Startup Test was re-run on August 7, 1984, and successfully completed.

NO. 5 steam line connected to upper portion of high pressure turbine.

Reactor remained critical throughout.

NO. 6 to install missing gasket in main steam line connected to upper portion of high pressure turbine. Reactor remained critical throughout.

NO. 7 on moisture separator drain tank high level . Cause for high level due to malfunctioning drain valve on piping from high pressure turbine exhaust to moisture separator.

NO. 8 on moisture separator drain tank high level . Cause for high level due to malfunctioning drain valve on piping from high pressure turbine exhaust to moisture separator.

y w -

  • ~

f ;-

D.

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-388 Date 09/10/84 Completed by L. A. Kuczynski Telephone (717)S42-3759 Challenges to Main Steam Safety Relief Valves

. Following the reactor scram of August 7,1984, SRV 'E' actuated automatically eight times. See table for specifics.

RX PRESSURE (psig) RX PRESSURE (psig)

OPEN CLOSED AT SRV OPEN AT SRV CLOSED 5:09:34 5: 10:05 1076 989 5: 13:56 5: 14:26 1077 989 5: 18:23 5: 18:53 1073 989 5:22:59 5:23:29 1070 989 5:27:40 5:28: 10 1068 990 5:32:30 5:33:00 1069 990 5:42:57 5:43:29 1076 987 5:49:44 6:00:06 1068 984 Changes to the Offsite Dose Calculation Manual None.

Major Changes to Radioactive Waste Treatment Systems j None.

NOTE: Add the following to Challenges to Main Steam Safety Relief Valves for July, 1984.

Following the scram of July 5,1984, SRV's ' A', 'B', and 'C' were manually actuated to depressurize the RPV. See following table for specifics. Time of scram: 0100. No SRV actuations associated with scram.

RX PRESSURE (psig) RX PRESSURE (psig)

SRV OPEN CLOSED AT SRV OPEN AT SRV CLOSED A 0254 0302 635 ~440 B 0329 0336 ~400 ~ 315 C 0413 0435 ~ 300 125 A 0516 0525 120 95 B 0518 0522 120 96 C 0520 0522 120 96 8 0602 0605 93 89

v. -

.. PPAL Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 / 770 5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 SEP 121984 Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2305 50-388/NPF-22

Dear Mr. Beebe:

The August 1984 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very trul you.s, l

$8WMW B. D. Kenyo Vice President-Nuclear Operations Attachment cc: Dr. Thomas E. Murley INP0 Records Center Regional Administrator-Region I Suite 1500 U.S. Nuclear Regulatory Commission 1100 circle 75 Parkway 631 Park Avenue Atlanta, Georgia 30339 King of Prussia, PA 19406 Director Mr. Thomas E. Pollog Office of Inspection and Enforcement Department of Environmental U.S. Nuclear Regulatory Commission Resources Washington, D.C. 20555 Bureau of Radiation Protection Attn: Document Control Desk (12 copies) P.O. Box 2063 liarrisburg, PA 17120 Mr. R. H. Jacobs - NRC Mr. R. L. Perch - NRC q

'S' .,