PLA-2832, Monthly Operating Repts for Mar 1987

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1987
ML20206E860
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/31/1987
From: Hirt J, Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2832, NUDOCS 8704130763
Download: ML20206E860 (9)


Text

.- .__ _ _ - _______ _______- ..- . _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

g AVERAGE DAILY UNIT POWER LEVEL k

[@ __..

+

DOCKET NO. 50-387 l p "4 UNIT Om

( 0 DATs 4-6-87 4rcsMs COMPLETED BY J.A. h TELEPHONE (717) 542-3917 l

KONE March, 1987 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) , (MWe-Net)

I 1039 37 1042 2

1044 1042 18 3 inas 39 1042 4 1049 20 44a 5 1043 R2R 21 6 1032 829 22 7 1033 822 23 8 in17 24 821 9 1042 821 25 10 inaa 26 840 gg 1043 1037 27 12 1043 28 i n17 13 1044 1034 29 14 1nad 1037 30 15 1042 1037 3

16 1043 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 07041hh p

?" \(

i

8'gANN4 c.

.D e  !

Mr %@7

@ ,e.T__O 3 LA* CCNL J OPERATING DATA REPORT 0 50-387 p DOCKET NO.

DATE 04-06-87 OpklC S i [s COMPLETED BY J.A. H1rt TEllPHONE (717)542-3917 OPERATING STATUS Unit One

1. Unit Name:

Susquehanna Steam Electric Station Notes

2. Reporting Period: March, 1987
3. Lkensed Thermal Power (MWt): l'193
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1068
7. Maximum Dependable Capacity (Net MWe): 1032
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None

9. Power Level To Which Restricted,If Any (Net MWe): None
10. Reasons For Restrictions,If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744 2.160 33,433
12. Number Of Hours Reacto Was Critic 2] 744 2,160 24,347.5
13. Reactor Reserve St utdown Hours 0 0 812.7
14. Hours Genmt9t O.t.Line 744 2.160 23,774
15. Unit Reserve Mutdawn Hours 0 0 0
16. Gross Thermal Ens gy Generated (MWH) 2,346,691 6,813,143 73,096,281
17. Gross Electrical Erergy Generated (MWH) 767,964 2,231,248 23,818,786  :
18. Net Electrical Energy Generated (MWH) 742,040 2,151,282 22,826,311
19. Unit Service Factor 100.0 100.0 71.1
20. Unit Availability Factor 100.0 100.0 71.1
21. Unit Capacity Factor (Using MDC Net) 96.6 96.5 66.2
22. Unit Capacity Factor (Using DER Net) 93*7 3*D *E
23. Unit Forced Outage Rate U.u U.u w.a
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

A Refueling Outage is scheduled to begin Septsber 5,1987 and end November 20,1987.

Evrected duration is 76 days,

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved
  • 1 INITIA L CRITICALITY INITIA L ELECTRICITY j COMMERCIAL OPERATION (4/77) l

pANN ,

a e -

Pk A.~. r.'

~k\

5 i

-b DOCKET NO.

50-387 -

L UNIT SHUTDOWNS AND POWER REDUCTIONS tn ,,g UNIT NAME s m - Unit One fp DATE 04/06/87 44IC c;t - REPORT MONTH March 19R7 COMPLETED BY J.A. Hirt 1ELEPHONE (7171542-3917 e.

50 4 Licensee Ee e Cause & Corrective No. Date h F-jj yI 5

$ )Y5$ Event (i f'.O 8 Action to jgg Report a mO g Prevent Recurrence d

There were no' Unit Shutdowns or significant power reductions for March, 1987 1 2 3 4 F: Forceci Reason: Method: Exhibit G . Instructions S: Schedtled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & Ucense Examination from previous month F-Administrative 5 G-Operational Error (Explain) 5-Reduction Exhibit I - Same Source (1/77) Il-Other (Explain) 9-Other

. o -

T SUSQUEHANNA STEAM ELECTRIC STATION Docket Ntaber 50-387 ' Date 04/06/87 Canpleted by J.- A. Hirt Telephone (717) 542-3917 i

Challenges to Main Stean Safety Relief Valves None

Changes to the Offsite Dose Calr,ilation Manual i

None-i Major Changes to Radioactive Waste Treatment Systems

! None i.

4 d

6 i

4 l

e i

).

N i

i

,l l

i i

I w w .a-.. 4 , , < , . . . - , - ,.._,,1,, .h r , ,, _.,__,....m, .-y . ' , , , , ,.. . , , , , ,. .

[ AVERAGE DAILY UNIT POWER LFVEL

.... 3 DOCKET NO. 50-388 L "4 UNIT Two y 30 DATE 04/06/87

?gg eft COMPLETED BY J.A. Hirt TELEPHONE (717)S42-3917 MONE March, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) j i 1051 g7 1052 1 2 1055 1g 1054 3 1056 1054 19 4 ins 6 20 1053 1055 5 21 1055 )

6 1055 1051 22 7

756 g 1051 8 909 1050 24 9 1052 25 1048 10 1054 26 1050 1054 1050 II 27 12 1053 1047 28 13 1054 in44 29 14 1053 1047 30 15 1052 1048 3

16 1053~

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

Y g

~

[ $$Uh y

@ -. ~:. :.' -  %

t ,i i :nnid j OPERATING DATA REPORT O DOCKETNO. 50-388 h NIC 6N M DATE 04/06/87 COMPLETED BY _J. A. Hirt TELEPHONE (717)542-3917 OPERATING STATUS Unit 'lko Susquehanna Steam Electric Station Notes

2. Reporting Period: March. 1987
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065 1068 o
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe): 1032
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None i

1

9. Power Level To Which Restricted,If Any (Net MWe): None

]

10. Reasons For Restrictions,If Any: N/A

)

l This Month Yr..to-Date~ Cumulative

11. Hours In Reporting Period ' '
12. Number Of Hours Reactor Was Critical 744 2,097 15,205
13. Reactor Reserve Shutdown Hours 0 0 717.9
14. Hours Generator On-Line 744 2,061.3 14,790.6
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 2,416,289 6,610,686 46,003,571
17. Gross Electrical Energy Generated (MWH) 799,144 2,184,612 15,088,906
18. Net Electrical Energy Generated (MWH) 772,151 2,109,164 14,511,693
19. Unit Service Factor 100.0 95.4 79.2
20. Unit Availability Factor *U *4 *A
21. Unit Capac ty Factor (Using MDC Net) 100.6 94.6 75.3
22. Unit Caparity Factor (Using DER Net) 97.5 91.7 73.0
23. Unit Fo'end Outage Rate 0.0 4.6 11.5
24. Shutdow as Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

Ne shutdowns are currently scheduled.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status tPrior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION (9/77)

4,M 4 4 .

gI,ha- ,@

\ 7 m . + - , s .

I DOCKET NO. 50-388 UNIT SHUTDOWNS AND POWER REDUCTIONS g R UNIT NAME SSES-Unit %10

@f@ 4 8 DATE 04/06/87 I

Ric 5# REPORT MONTH March, 1987 COMPLE BY

, jE }; Y Licensee Eg ". Cause & Corrective

%. Date g 3g ,g& Event p pU Action to H

$5 5 j gg g Report # mV g Prevent Recurrence 8

3 870307 S 0 B 5 N/A N/A N/A On March 7,1987, power was reduced to approximately 50% to change the Reactor Recirculation M/G set brushes and to perform a control rod sequence exchange. Power was returned to 100% on March 9, 1987, I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 01611 E-Operator Training & License Examination from previous month F-Administrative 5 G-Operational Error (Explain) 5-Reduction Exhibit I- Same Source (9/77) Il-Other (Explain) 9-Other

- ~ . . - .

..~ , . .

1 1

e SUSQUEHANNA STEAM EECTRIC STMION '

Docket Nunber 50-388 Date 04/06/87 9

1 Canpleted by J. A. Hirt Telephom (717) 542-3917 Challenges to Main Stean Safety Relief Valves Nom ,

Changes to the Offsite Dose Calculation Manual Nom Major Changes to Radioactive Waste Treatment Systems 1

Nom i

1 4

-I J

l a

l l

m , -

~

6- _._,

PP&L Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 I 770-5151 fpRQ81987 Submitted pursuant to-Technical Specifications Harold W. Keiser Section 6.9.1.6 Vice President-Nuclear Operations 215/770-7502 Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 i

SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 PLA-2832 FILE R41-2A 50-388/NPF-22

Dear Mr. Beebe:

The March 1987 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, f

<t~ q 59 H. W. Keis r Vice Presi ent-Nuclear Operations Attachment cc: Document; Control Desk'(Original)

NRC Region I Mr. L. R. Plisco - NRC Resident l Mr. M. C. Thadani - NRC Project Manager l l

l