PLA-2639, Monthly Operating Repts for Apr 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1986
ML20207C539
Person / Time
Site: Susquehanna  
Issue date: 04/30/1986
From: Keiser H, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2639, NUDOCS 8607210392
Download: ML20207C539 (11)


Text

h54' AVERAGE DAILY UNIT POWER LEVEL

@y

~

rh 7

DOCKET NO.

50-3n7

/(

-s LP

~ %J 0"

UNIT p

DATE s-8-86 4

NIC SY COMPLETED BY L.A. Kuczynski TELEPHONE (717) 542-37s9 MONTH April, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER.EVEL (MWe Net)

(MWe-Neti 0

1 0

37 0

0 2

18 3

19 0

0 4

20 0

0 5

21 0

6 0

y o

0 114 7

23 8

24 314 0

9 0

0 10 26 14 0

II 27 451 545 12 23 0

662 13 g

0 14 30 15 3y 0

16 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

~

(9/77) 8607210392 860430 DR ADOCK 05000307 PDH 1fdY I{t

ANN 4 4

4.> - @

D 7

Z

__ S-E _

L 7-.

.R J OPERATING DATA REPORT C

DOCKET NO.

50-387 RfC g@4 Q

DATE 5-8-86 COMPLETED BY L.A.

ruqzynski TELEPHONE (7171542-3759 OPERATING STATUS Unit 1

1. Unit Name: Succuehanna Steam Electric Station b0l'5 CompletedUnit1Secondl
2. Reporting Penod:

Anril, 1986 Refueling and Inspection j

3. Licensed Thermal Power (Mhti:

1293 outage at 0615 on April 23,

4. Nameplate Rating (Gross MWet:

1152 1986.

5. Design Electrical Rating (Net MWel:

1065

6. Maximum Dependable Capacity (Gross MWe):

1068 l

7. Maximum Dependable Capacity (Net MWe):

1032 I

8. If Changes Occur in Capacity Ratings titems Number 3 Through 7)Since Last Report. Gise Reasons:

None

9. Power Level To which Restricted. If Any (Net MWe):

None

10. Reasons For Restrictions if Any:

None This Month Yr..to Date Cumularise

11. Hours In Reporting Period 719 2,879 25,392

~

12. Number Of Hours Reactor Was Critical 245.6 1,327.4 17,318.6
13. Reactor Reserve Shutdown Hours n

n 710.6 1.:. Hours Generator On-Line 170 o 1.9,0.n 16,839.7

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 91?.n11 3.651.510 51,240,835 17 Gross Electrical Energy Generated lMWH) 75,2sr, 1,194,152 16,693,144
18. Net Electrical Energy Generated (MWH) 62,249 1,125,919

_15,970,657

19. Unit Service Factor 19.5 42.4 66.3
20. Unit Asailability Factor 19.5 42.4 66.3 8.4 37.9 61
21. Unit Capacity Factor (Using MDC Net) 8*1 36.7 59.1
22. Unit Capacity FactoriUsing DER Net)
23. Unit Forced Outage Rate 24.1 3.5 10.7
24. Shutdowns Scheduled Oser Next 6 Months tType. Date.and Duration of Eaein.

N/A

25. If Shut Down \\t End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status t Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPER A TION pu-~,

e

gANN4 l

Jy A! }!.*h.)

y 3

~

i y

+

'h UNIl' SillilDOWNS AND POWER RFDUC110NS DOCKET NO.

50-387 R

UNIT N AME one 6

PPat f,

t' DATE

--R -n c, l

h COMPLETED BY L.A. Kuczynski

'C'?NIC nt RFpORT MONTil April, 1986 TELEPilONE (7171 542-3759 w.

E E

_' E' i 1 k ensee E-r En Cause & Corsettive 50

=

No.

Date

{

jj k

)h5 Event 5i S-i Achon to Repori n NU hL present Recurrence

$5 5

3 5 =g e

u o

3 860215 S

534.2 C

4 N/A ZZ ZZZZZZ Manual scram to commence second refueling and inspection outage.

Breaker closed on April 23 at 0615 prior to main turbine overspeed trip test.

4 860423 S

0.5 B

9 N/A ZZ ZZZZZZ Generator removed from grid due to main turbine overspeed trip.

5 860424 F

44.4 A

2 N/A IF tiECFUN Manual scram from 19% power to allow containment entry for tip indexer repair.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions S: Scheduled A 1quipment Failure (Explain) 1 Manual for preparation of Data j

B Maintenance of Test 2-Manual Scram-Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Repori II.1:R) File INURlG-D-Reg.datory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administ rative 5-Reduction 5

G-Operational Error (Explain)

Exhibit I - Same Source (9/77)

Il-Ot her ( E xplain) 9-Other

UNIT 1 SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 5-8-86 Completed by L.A. Kuczynski Telephone (717) 542-3759 Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None

NANNj%

AVERAGE DAILY UNIT POWER LEVEL M j

)\\

D v

i C/)

/

3 DOCKET NO.

50-1RR g

LM

~ %J Two UNIT 0

DATg 5-8-86 s

ggg [

COMPLEED BY L. A. Kuc7vnski TELEPHONE (717)542-3759 MONTH April 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe. Net)

(MWe-Net) i 1,037 17 1,04R 2

1,043 gg 1,043 3

1,042 39 1,040 4

1,036 20 1,034 853 5

21 1 039 6

9f0 22 1,043 7

1,048 23 1,045 10,4_4 24 1,039 g

4 1,029 9

1,050 25 10 1.04R 26 906 Ig 1,025 27 1,036 862 g2 23 1,037 g3 1,000 29 14 1,047 30 15 1,048

~

3g 16 1,048 INSTRUCTIONS On this format, list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole rnegawatt.

19177) l

ANN4 G y

-e v

D s&

7 Z

_ S - -~ ~_ _ M L%_

Z.~. J OPERATING DATA REPORT Q

DOCKET NO.

50-388 h NIC g@6 DATE 5-8-86 COMPLETED BY T.. A. Muczynski TELEPHONE (717)S42-3759 OPERATING STATUS Unit 2

1. Unit Name: Susauehanna Steam Electric Station Notes l

I

2. Reporting Period:

Anril, 1986 I

3. Licensed Thermal Power (Mwt):

3293 1152

4. Nameplate Rating (Gross Mhel:
5. Design Electrical Rating (Net MWei: 1065 t
6. Maximum Dependable Capacity (Gross MWe):

1068 j

j

7. Maximum Dependable Capacity (Net MWe):

1032 i

8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Gise Reasons:

None

9. Power Level To which Restricted. If Any (Net MWe):

None

10. Reasons For Restrictions,if Any:

None This Month Yr..to.Date Cumulatise 719 2,879 10,631

11. Houas in Reporting Period 19
12. Number Of Hours Reactor Was Critical 2.7R5.6 M6. 8
13. Reactor Reserve Shutdown Hours 0

133.6 717.9

14. Hours Generator On Line 719 2,720.6 9,715.7
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2,316,RR5 8.659.5R9 30,690,387 I~. Gross Electrical Energy Generated (MhH) 760,438 2,858,704 10,071,504
18. Net Electrical Energy Generated IMWH) 733,624 2,757,843 9,712,153
19. Unit Service Factor 100.0 94.5 91.4
20. Unit Availability Factor 100.0

__94.5 91.4

21. Unit Capacity Factor (Using MDC Net) 98.9

_ 92.8 88.5 "8

89.9

22. Unit Capacity Factor (Using DER Net) 85.8
23. Unit Forced Outage Rate nn 5.5 8.6
24. Shutdowns Scheduled Oser Next 6 Months iType. Date and Duration of Eaen L Refueling Outage; August 2, 1986; 84 days l
25. If Shut Down At End Of Report Period. Estimated Date of Startup.
26. Units in Test Status tPrior to Commercial Operation):

Forecast Achiesed

)

INITIA L CRITICA LITY INITIAL ELECTRICITY COMM ERCI A L OPER ATION p c-,

1 1

9 N

/

o 7

S f.

n N

7 e

.o

)

SF c

o hr h

ec k

h de ud 4.

d R'

IwI p el y

.o k h

M D

I a

et C

N b

,N S

p [

yu I

1 n

V 2

i sy GF0DCBAR I

A E-I

- 4

- - - e

-O4A) RRMLa

)

tp dp e e aqs hemreg fiu o u unin er r a ia l

e tp t t int al e i s ot i nm r o ae QBE5 n

Eot snr g

pl l t Ty nn r

a a ct EE:

r e

a iai R F

iEs oa nr ene

)

i s fi r

l o

nt r

g i Tu r

r e e

&c

(

ykE s

t E

i t(

o E

x Ln pl ci x

p e

ai n

al 7I n

i U

w n

)

"= hE

)

N E

g=c

> ~ O ;~

x I

a I

mi R

S I

n I

E U

a t

P I

i R

L O

D on e l i R

O p i c v e roe n T

W n

se M

N i

e e

S O

r N

A T

N 3

I D

I P

95 4321 M i

A O

OR fCAMMet E5E p

W te rouaah G3n r

E nno i

R t

hdon o eu m tm a au u d.

,R l

rc a

l l E

i pnt S D

t ic 1

iruc o e a Sa o$SEC.

9 U

r 8

C n v t c.m Ug."

r 6

T ii a

I oo

(

u n.m

)N s

S mon t

h 5

4 C

O P

C M

D r

E 0EEfE e

a T

o x

1 vn x

v u

E P U O r

h 6et h

e s

b 1 nr Pi nae L L N C i

ty ei t

ct &

E E I

b t

RSpt Ri P T T K r

i

)

E e oC iE D N T ehaG I

f c no 0 D per A A ea N

S rot t ut r

NBTM r

m t siI rr a

oe EYEE.O on o nst e

ct f

(

n e

I or c

i

(

, 5 1

r v

S E Lfut 1

8 5

e e

7 c

o RiDi c

u

) e: o 7

A T

0 rc Fnt n 8

w 1

e lis a e

6 o 3

s e e s K 8

i a u 8

N c

m U

z R

y E

s n

G o

s k

i i

l

\\

UNIT 2 SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-388 Date 5-8-86 Completed by L. A. Kuczynski Telephone (717)542-3759

)

Challenges to Main Steam Safety Relief Valves None changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None

PLEASE DO NOT MAIL NRC CORRESPONDENCEfREVIEH U/f86 ptA_

2639 dl f 8 a-ueo -

ag TO:

b =

'E b'M l

SUBJECT:

v bY/-2 A AFFIDAVIT:.yttf ER:

FILE:

NAME TITLE SIGNATURJ

\\

wE BamJ bre e 1% L i

/M i

TAA Ces amids CL1}

Tsur ken PLts-2297/

(/

\\

I IRED ?

NQA VERIFICATION? Y W REQUIRED / REQUESTED l

VERIFIED BY DATE COMMENTS AND COMMITMENTS RESOLUTION ho 4

1 1

i i

1 l

\\

i l

i.

IN I

LOCATION:

EXT:

ORIGINATOR:

N01-QA-3.3.1A -

PLEASE DO NOT MAIL GN0796 j

REY. 3(7/84L

. - - _ _,. ~, _ -. _ _. _ _ - _ _ _..

i

._.__m_

i

,e f

Q Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown. PA 18101
  • 215 / 770 5151

)

i Harold W. Keiser Vice President-Nuclear Operations t

a i

215/770-7502 i

t j

MAY ! 51986 1

1 Director, Data Automation &

l Management Information Division

{

Attention:

Mr. M. R. Beebe l

Management Information Branch 1

Office of Resource Management l

U.S. Nuclear Regulatory Commission i

Washington, D.C.

20555 l

i j

SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 PLA-2639 FILE R41-2A 50-388/NPF-22 i

i j

Dear Mr. Beebe:

i The April 1986 monthly operating reports for Susquehanna SES Units 1 and 2 are l

]

attached.

i i

j Very truly yours, s

dow l

H. W. Keiser Vice President-Nuclear Operations Attachment cc:

Dr. Thomas E. Murley I

Regional Administrator-Region I U.S. Nuclear Regulatory Commission 631 Park Avenue

{

King of Prussia, PA 19406 1

1 Director

}

Office of Inspection and Enforcement

[

U.S. Nuclear Regulatory Commission j

Washington, D.C.

20555 Attn: Document Control Desk (12 copies) 1 Mr. R. H. Jacobs - NRC l

Ms. M. J. Campagnone - NRC 1

1 I

9>4 i

i I

.,..,yw.-.

.--.---.,_-m,.,,

,--..-,,_r.,,

...---.-.,----..,,-.-,..,..-,-_,,-.y,7..y,_-.,,..c.--%-,,,-wvm..,7--7.---

..me..-_--w,.n---,-,y-