PLA-2387, Monthly Operating Repts for Dec 1984
| ML20106J715 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 12/31/1984 |
| From: | Kenyon B, Kuczynski L PENNSYLVANIA POWER & LIGHT CO. |
| To: | Beebe M NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| PLA-2387, NUDOCS 8502190091 | |
| Download: ML20106J715 (10) | |
Text
{{#Wiki_filter:i AVERAGE DAILY UNIT POWER LEVEL n et),
- .m DOCKET NO.
50-387 y o uN,T ome PPsL DAIT 01/09/85 vS' % gg gi COMPLETED BY L.A. Kuczvnski TELEPHONE (717)542-3759 MOPfg December, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Ncs) (MWe Net) 1050 g7 1042 2 919 gg 1045 3 1039 gg 1045 4 1053 20 1045 1049 21 1042 1049 1032 6 g 1029' 7 1050 23 g 948 545 y 9 883 23 0 935 10 26 0 3g 1040 27 0 12 1046 23 0 13 1032 29 0 l 34 959 30 280 15 1035 33 808 16 1045 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. (9/77) g} (f G502190091 841231 n PDR ADOCK 050003G7 R PDR l I
[,1 g m E LA+- TJl OPERATING DATA REPORT PP&L [ ' DOCKET NO. 50-387 DATE 01/09/85 if RfC S COMPLETED BY L.A. Kuczynski TELEPHONE (717)S42-3759 OPERATING STATUS Unit 1 Notes
- l. Unit Name: Suscuehanna Steam Electric Station
- 2. rep rting Period: December, 1984 Ena or core life power 3293
- 3. Licensed Thermal Power (MWt):
1152
- 4. Nameplate Rating (Gross MWe):
21, 1984. 1065
- 5. Design Electrical Rating (Net MWe):
1068
- 6. Maximum Dependable Capacity (Gross MWe):
1032
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratir:gs (Items Number 3 Through 7)Since Last Report. Give Reasons:
None None
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any: None This Month Yr..to-Date Cumulative
- 11. Hours In Reporting Period 744 8.784 13.753
- 12. Number Of Hours Reactor Was Critica!
627 1 6,547.4 10,392.7
- 13. Reactor Reserve Shutdown Hours 0
314.7 471.4
- 14. Hours Generator On Line 614.9 6.378.6 10,146.9
- 15. Unit Reserve Shutdown Hours 0
0 0 j
- 16. Gross Thermal Energy Generated (MWH) 1.899.012
_19.367.327 30.628.988 l
- 17. Gross Electrical Energy Generated (MWH) 624,280 6,323,980 9,990,530
- 18. Net Electrical Energy Generated (MWH) 601,046 6,088,141 9,624,514
- 19. Unit Service Factor 82.6 72.6 73.8
- 20. Unit Availability Factor 82.6 72.6 73.8
- 21. Unit Capacity Facior (Using MDC Net) 78.3 67.2 67.8
- 22. Unit Capacity Factor (Using DER Net) 75.9 65.1 65.7
- 23. Unit Forced Outage Rate 17.4 15.1 14
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
Refuelino Outace; February 9. 19857 15 Weeks. NA
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26 Units In Test Status (Prior to Commercial Operation): Forecast Achiesed l INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77 )
j'ff$3]f% '{ M K DOCKET NO. 50-387 l UNIT SHUTDOWNS AND POWER REDUCTIONS U UNIT NAME one $% @M DATE 01/09/85 0
- RIC REPORT MONTH December-1984 TELEPHONE (717)542-3759
":.= c .E_ g 3 --* y5 Licensee Eg h Cause & Corrective No. Date g 3g n jss Event g7 gO3 Action to I-g 5 jgg Report sr mO Prevent Recurrence g b 19 841224 F' 129,1 A 2 84-048 SE VALVEX Nitrogen gas for primary containment make-up was off-loaded from a vendor tanker prior to proper system line up due to a miscommunication. 'No pri-mary containment isolation valves were damaged. Unit shutdown followed due to loss of primary containment in-tegrity caused by excessive leakage through damaged valves. The valves were repaired and the Unit returned to service. i l 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG. D-Regulatory Restriction 4 Continuation 0161) E-Operator Training & License Examination from previous month 5 F-Administrative 5-Reduction G-Operational Error (Explain) Exhibit I - Same Source 9-Other (9/77) 11 O:her (Explain)
,.g. '14.
- 7,p s..
-. ~. s- -i - - Unit'1 ' ' SUSQUEHANNA; STEAM ELECTRIC' STATION Docket Number 50-387' Date 01/09/85 Completed by L.A.-Kuczynski- ' Telephone (717)542-3759 i - 01allenges to Main Steam Safety Relief Valves - None- ~ Changes to the Offsite Dose Calculation Manuall None. 4 3 Major Ch'anges to Radioactive Waste Treatment Systems None 1 d 5 t I 3 4 l i: 19 ~,
4 AVERAGE DAILY UNIT POWER LEVIL M% ~ a Ct) 3 DOCKET NO. 50-388 LP UNIT Wo f+ DATE 01/09/85 ggg {T COMPLETED BY L.A. Kuczynski TELEPHONE (717)S42-3759 MONTH N em,ber, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1 O g7 0 2 0 gg 0 3 0 19 0 4 0 20 0 5 0 21 0 0 6 n 0 7 0 B D 8 0 0 24 9 0 3 o 10 0 26 0 11 0 37 0 0 12 3 o 0 0 l 13 29 14 0 0 30 0 15 3, o l 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. l l .(9/77)
f*? e,+ i O 7 3 W LN- ~CJ OPERATING DATA REPORT DOCKET NO. 50-388 DATE 01/09/85 h if NIC S COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-3759 OPERATING STATUS Unit 2 Notes
- 1. Unit Name:
Susquehanna Steam Electric Station
- 2. Reporting Period: December, 1984 3293
- 3. Licensed Thermal Power (MWt):
1152
- 4. Nameplate Rating (Gross MWe):
1065
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- To be determined.
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted. lf Any (Net MWe): None
- 10. Reasons For Restrictions,if Any:
None This Month Yr.-to.Dne Cumulative
- 11. Hours in Reporting Period.
744 4356 4356
- 12. Number Of Hours Reactor Was Critical 0
2.145.9 2,145.9
- 13. Reactor Reserve Shutdown Hours O
495 495
- 14. Hours Generator On-Line 0
1,769.3 1,769.3
- 15. Unit Reserve Shutdown Hours 0
142.4 142.4 l
- 16. Gross Thermal Energy Generated (MWH) 0 3.227.193 3.227.193
- 17. Gross Electrical Energy Generated (MWH) 0 989,040 989,040 0
932,026 932,026
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor NA NA NA
- 20. Unit Availability Factor NA NA NA NA NA NA
- 21. Unit Capacity Factor (Using MDC Net)
NA NA NA
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate NA NA NA
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
l None 1
- 25. If Shut Down At End Of Report Period Estimated Date of Startup: January 8, 1985
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY 05/09/84 05/08/84 INITIAL ELECTRICITY 06/28/84 07/03/84 COMMERCIAL OPERATION 01/31/85 (9/77)
M 5^. ) 'Y'{8) \\ % ~ 2e r. :. E DOCKET NO. 50-388 h UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Tm 6 eraL f@ DATE 01/09/85 COMPLETED BY I,.A. Kuczynski NIC @ REPORT MONTH December 1984 TELEPHONE (7171542-3759 e. E E .! ? jY5 Licensee $g je. Cause & Currective No. Date g 3g .g s 5 Event p gU3 Action to P yE 5 j 53 g Report a mo Prevent Recurrence g d 16 841027 S 744 B 4 NA NA NA Reactor scram as part of scheduled Startup Testing. Pre-commercial outage, commenced. I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B-Mair.tenance of Test 2-Manual Scram-Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161) EOperator Training & License Examination from previous month F-Administrative 5-Reduction 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) II-Other (Explain) 9-Other
Y
- ',.- - 1,. ;..
- <.~
, g I Unit 2. . SUSQUEHANNA STEAM ELECTRIC STATION Docket'-Number 50-388 Date 01/09/85 Completed by L.A..Kuczynski Telephone (717)542-3759 Challenges-to Main Steam Safety Relief Valves- .None. Changes to the Offsite' Dose calculation Manual . None. - Major Changes to Radioactive Waste Treatment' Systems None. t 4 4 D 4
pr PP&L Pennsylvania Power & Light' Company Two North Ninth Street
- Allentown, PA 18101
- 21517705151 Bruce D. Kenyon Vice President-Nuclear Operations ~
215/770-7502 JnN 141995 ' . Director,- Data Automation' & Management Information Division Attention: ~Mr. M. R. Beebe-Management:Information Branch Office:of Resource Management ~U.S. Nuclear Regulatory Comm Osion Washington, D.C._ 20555 SUSQUEHANNA STEAM ELECTRIC' STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2387 50-388/NPF-22
Dear Mr. Beebe:
The December 1984 monthly operating reports for Susquehanna SES Units 1 and 2 are attached. Very truly yours, 7,/ E. D. Kenyo Vice Presid
- -Nuclear Operations Attachment
$g
- y j
..g-r .j a,- e b -N'. .. ), -h, F f-{ ;, {._E ., ; o ~ g, f-JAff1 ~41985 Page 21 ~i SSES ' ' ' E A-2387- ~ 'ER 100450 File 8411 Mr. M.:R. Beebe~ cc: Dr. ; Thomas E;i Murley - Suited 15007 INPO Records Center m Regional. Administrator-Region I: -U.S. Nuclear RegulatoryfCommission: 11001 Circle 75. Parkway 631 Park Avenue. Atlanta, Georgia 30331~- ~ King of PrussiaUPA.19406 Director .Mr. Thomas E. Pollog. ' Office of= Inspection and Enforcement. Department ofsEnvironmental. U.S. Nuclear Regulatory Commission. Resources 1 Washington, D.C.' 20555' Bureau.of Radiation Protection ~. Attn: Document, Control Desk (12 copies) P.O. Box 12063 Harrisburg, PA 17120
- Mrs - R. H. Jacobs NRC
.American Nuclear Insurers-Ms. M.'J. Campagnone - NRC- ,The Exchange Suite 245 270 Farmington Avenue- .Farmington,.CT-.06032 ~ Attn: Librarian 1 ~ ~. o z i e i 4 -a ....4-.. :......- , -,.,. ~.}}