PLA-2387, Monthly Operating Repts for Dec 1984

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1984
ML20106J715
Person / Time
Site: Susquehanna  
Issue date: 12/31/1984
From: Kenyon B, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2387, NUDOCS 8502190091
Download: ML20106J715 (10)


Text

{{#Wiki_filter:i AVERAGE DAILY UNIT POWER LEVEL n et),

  1. .m DOCKET NO.

50-387 y o uN,T ome PPsL DAIT 01/09/85 vS' % gg gi COMPLETED BY L.A. Kuczvnski TELEPHONE (717)542-3759 MOPfg December, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Ncs) (MWe Net) 1050 g7 1042 2 919 gg 1045 3 1039 gg 1045 4 1053 20 1045 1049 21 1042 1049 1032 6 g 1029' 7 1050 23 g 948 545 y 9 883 23 0 935 10 26 0 3g 1040 27 0 12 1046 23 0 13 1032 29 0 l 34 959 30 280 15 1035 33 808 16 1045 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. (9/77) g} (f G502190091 841231 n PDR ADOCK 050003G7 R PDR l I

[,1 g m E LA+- TJl OPERATING DATA REPORT PP&L [ ' DOCKET NO. 50-387 DATE 01/09/85 if RfC S COMPLETED BY L.A. Kuczynski TELEPHONE (717)S42-3759 OPERATING STATUS Unit 1 Notes

l. Unit Name: Suscuehanna Steam Electric Station
2. rep rting Period: December, 1984 Ena or core life power 3293
3. Licensed Thermal Power (MWt):

1152

4. Nameplate Rating (Gross MWe):

21, 1984. 1065

5. Design Electrical Rating (Net MWe):

1068

6. Maximum Dependable Capacity (Gross MWe):

1032

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratir:gs (Items Number 3 Through 7)Since Last Report. Give Reasons:

None None

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions. If Any: None This Month Yr..to-Date Cumulative
11. Hours In Reporting Period 744 8.784 13.753
12. Number Of Hours Reactor Was Critica!

627 1 6,547.4 10,392.7

13. Reactor Reserve Shutdown Hours 0

314.7 471.4

14. Hours Generator On Line 614.9 6.378.6 10,146.9
15. Unit Reserve Shutdown Hours 0

0 0 j

16. Gross Thermal Energy Generated (MWH) 1.899.012

_19.367.327 30.628.988 l

17. Gross Electrical Energy Generated (MWH) 624,280 6,323,980 9,990,530
18. Net Electrical Energy Generated (MWH) 601,046 6,088,141 9,624,514
19. Unit Service Factor 82.6 72.6 73.8
20. Unit Availability Factor 82.6 72.6 73.8
21. Unit Capacity Facior (Using MDC Net) 78.3 67.2 67.8
22. Unit Capacity Factor (Using DER Net) 75.9 65.1 65.7
23. Unit Forced Outage Rate 17.4 15.1 14
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Refuelino Outace; February 9. 19857 15 Weeks. NA

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26 Units In Test Status (Prior to Commercial Operation): Forecast Achiesed l INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77 )

j'ff$3]f% '{ M K DOCKET NO. 50-387 l UNIT SHUTDOWNS AND POWER REDUCTIONS U UNIT NAME one $% @M DATE 01/09/85 0

  1. RIC REPORT MONTH December-1984 TELEPHONE (717)542-3759

":.= c .E_ g 3 --* y5 Licensee Eg h Cause & Corrective No. Date g 3g n jss Event g7 gO3 Action to I-g 5 jgg Report sr mO Prevent Recurrence g b 19 841224 F' 129,1 A 2 84-048 SE VALVEX Nitrogen gas for primary containment make-up was off-loaded from a vendor tanker prior to proper system line up due to a miscommunication. 'No pri-mary containment isolation valves were damaged. Unit shutdown followed due to loss of primary containment in-tegrity caused by excessive leakage through damaged valves. The valves were repaired and the Unit returned to service. i l 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG. D-Regulatory Restriction 4 Continuation 0161) E-Operator Training & License Examination from previous month 5 F-Administrative 5-Reduction G-Operational Error (Explain) Exhibit I - Same Source 9-Other (9/77) 11 O:her (Explain)

,.g. '14.

  • 7,p s..

-. ~. s- -i - - Unit'1 ' ' SUSQUEHANNA; STEAM ELECTRIC' STATION Docket Number 50-387' Date 01/09/85 Completed by L.A.-Kuczynski- ' Telephone (717)542-3759 i - 01allenges to Main Steam Safety Relief Valves - None- ~ Changes to the Offsite Dose Calculation Manuall None. 4 3 Major Ch'anges to Radioactive Waste Treatment Systems None 1 d 5 t I 3 4 l i: 19 ~,

4 AVERAGE DAILY UNIT POWER LEVIL M% ~ a Ct) 3 DOCKET NO. 50-388 LP UNIT Wo f+ DATE 01/09/85 ggg {T COMPLETED BY L.A. Kuczynski TELEPHONE (717)S42-3759 MONTH N em,ber, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1 O g7 0 2 0 gg 0 3 0 19 0 4 0 20 0 5 0 21 0 0 6 n 0 7 0 B D 8 0 0 24 9 0 3 o 10 0 26 0 11 0 37 0 0 12 3 o 0 0 l 13 29 14 0 0 30 0 15 3, o l 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. l l .(9/77)

f*? e,+ i O 7 3 W LN- ~CJ OPERATING DATA REPORT DOCKET NO. 50-388 DATE 01/09/85 h if NIC S COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-3759 OPERATING STATUS Unit 2 Notes

1. Unit Name:

Susquehanna Steam Electric Station

2. Reporting Period: December, 1984 3293
3. Licensed Thermal Power (MWt):

1152

4. Nameplate Rating (Gross MWe):

1065

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
  • To be determined.
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. lf Any (Net MWe): None
10. Reasons For Restrictions,if Any:

None This Month Yr.-to.Dne Cumulative

11. Hours in Reporting Period.

744 4356 4356

12. Number Of Hours Reactor Was Critical 0

2.145.9 2,145.9

13. Reactor Reserve Shutdown Hours O

495 495

14. Hours Generator On-Line 0

1,769.3 1,769.3

15. Unit Reserve Shutdown Hours 0

142.4 142.4 l

16. Gross Thermal Energy Generated (MWH) 0 3.227.193 3.227.193
17. Gross Electrical Energy Generated (MWH) 0 989,040 989,040 0

932,026 932,026

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor NA NA NA
20. Unit Availability Factor NA NA NA NA NA NA
21. Unit Capacity Factor (Using MDC Net)

NA NA NA

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate NA NA NA
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

l None 1

25. If Shut Down At End Of Report Period Estimated Date of Startup: January 8, 1985
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY 05/09/84 05/08/84 INITIAL ELECTRICITY 06/28/84 07/03/84 COMMERCIAL OPERATION 01/31/85 (9/77)

M 5^. ) 'Y'{8) \\ % ~ 2e r. :. E DOCKET NO. 50-388 h UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Tm 6 eraL f@ DATE 01/09/85 COMPLETED BY I,.A. Kuczynski NIC @ REPORT MONTH December 1984 TELEPHONE (7171542-3759 e. E E .! ? jY5 Licensee $g je. Cause & Currective No. Date g 3g .g s 5 Event p gU3 Action to P yE 5 j 53 g Report a mo Prevent Recurrence g d 16 841027 S 744 B 4 NA NA NA Reactor scram as part of scheduled Startup Testing. Pre-commercial outage, commenced. I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B-Mair.tenance of Test 2-Manual Scram-Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161) EOperator Training & License Examination from previous month F-Administrative 5-Reduction 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) II-Other (Explain) 9-Other

Y

',.- - 1,. ;..
  • <.~

, g I Unit 2. . SUSQUEHANNA STEAM ELECTRIC STATION Docket'-Number 50-388 Date 01/09/85 Completed by L.A..Kuczynski Telephone (717)542-3759 Challenges-to Main Steam Safety Relief Valves- .None. Changes to the Offsite' Dose calculation Manual . None. - Major Changes to Radioactive Waste Treatment' Systems None. t 4 4 D 4

pr PP&L Pennsylvania Power & Light' Company Two North Ninth Street

  • Allentown, PA 18101
  • 21517705151 Bruce D. Kenyon Vice President-Nuclear Operations ~

215/770-7502 JnN 141995 ' . Director,- Data Automation' & Management Information Division Attention: ~Mr. M. R. Beebe-Management:Information Branch Office:of Resource Management ~U.S. Nuclear Regulatory Comm Osion Washington, D.C._ 20555 SUSQUEHANNA STEAM ELECTRIC' STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2387 50-388/NPF-22

Dear Mr. Beebe:

The December 1984 monthly operating reports for Susquehanna SES Units 1 and 2 are attached. Very truly yours, 7,/ E. D. Kenyo Vice Presid

-Nuclear Operations Attachment

$g

y j

..g-r .j a,- e b -N'. .. ), -h, F f-{ ;, {._E ., ; o ~ g, f-JAff1 ~41985 Page 21 ~i SSES ' ' ' E A-2387- ~ 'ER 100450 File 8411 Mr. M.:R. Beebe~ cc: Dr. ; Thomas E;i Murley - Suited 15007 INPO Records Center m Regional. Administrator-Region I: -U.S. Nuclear RegulatoryfCommission: 11001 Circle 75. Parkway 631 Park Avenue. Atlanta, Georgia 30331~- ~ King of PrussiaUPA.19406 Director .Mr. Thomas E. Pollog. ' Office of= Inspection and Enforcement. Department ofsEnvironmental. U.S. Nuclear Regulatory Commission. Resources 1 Washington, D.C.' 20555' Bureau.of Radiation Protection ~. Attn: Document, Control Desk (12 copies) P.O. Box 12063 Harrisburg, PA 17120

Mrs - R. H. Jacobs NRC

.American Nuclear Insurers-Ms. M.'J. Campagnone - NRC- ,The Exchange Suite 245 270 Farmington Avenue- .Farmington,.CT-.06032 ~ Attn: Librarian 1 ~ ~. o z i e i 4 -a ....4-.. :......- , -,.,. ~.}}