PLA-3027, Monthly Operating Repts for Apr 1988

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1988
ML20154E197
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/30/1988
From: Hirt J, Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Mcdonald W
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
PLA-3027, NUDOCS 8805200124
Download: ML20154E197 (9)


Text

-

4 m;' r g

-p AVERAGE DAILY UNIT POWER LEVEL p '

SiOl y (0 -...- 3 DOCKET NO. 50-387 L;s . " r'. J

. One fp O D E 05/09/88 CONIPLETED BY J.A. Hirt NJC $W ~

TELEPHONE MONTH April, 1988 _ _ _

DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL DlWe Net) (MWe-Net )

1,052 ,7 1,052 2 1.050 18 1,053 3 1,048 ig 1,056 4 1,046 20 1,055 1,050 1,054 5 21 1,051 yy 1,054 6

1,056 1,052 7 ,

8 1,057 24 1,050 9 1,058 1,052 23 1,055 1,049 to 26 11 1.054  :; 1,047

1,055 g 1,053 g3 1,055 ,,

1,054 14 1,055 30 803 15 1,055 3, 1,056 16 INSTRUCTIONS On this format. list the aserage daily unit power lesel in \lwe Net for each das in the reportin; month Compu'e to the nearest whole megawatt.

01/77) l~

8805200124 DR 88043o I ADOCK 05000387 f DCD

~

N

- G<co*?,s e D g '-*W Z 7. . . 1 3 L7 . r, J OPERATING DATA REPORT O DOCKET NO, .50-387 bp - DATE _05/09/80 RfC cgTP'D COMP!ITED BY J. A. Hirt TELEPHONE (717)542- 3917 OPERATING STATUS ' - - ' " -

Unit One Notss

1. Unit Name: .Syp3;ehanna Steam Electric Station
2. Reporting Period:

April, 1988 3,293

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

1,152

5. Design Electrical Rating (Net MWe):

1,065 1,068

6. Masimum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

I' #

8. If Change Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Gise Reasons:

None

9. Power Lesel To Which Restricted.lf Any (Net MWe):

D

10. Reasons For Restrictions. lf Any: N/A This Month Yr..to Date Cumulatise 719 2,903
11. Hours in Reporting Period 719 2,628 42,936_I 32,280.
12. Number Of Hours Reactor Was Critical
13. Reactor Resene Shutdown Hour, 0 0 812.7 719 2,584.4 30,531.4
14. Hours Generator On-Line 0 0 0
15. Unit Resene Shutdown Hours 2,356,635 8,254,661 94,308,138
16. Gross Therrnal Energy Generated (MWH) 17 Gross Electrical Energy Generated (MWH) 776,720 2,726,112 30,736,711 _

751,003 2,630,162 29,471,390

18. Net Electrical Energy Generated (MbH) 100.0 39.0 71.1
19. Unit Senice Factor
20. Unit Asailability Factor 100.0 _

89.0 71.1 101,2 _ 87.8 66.5

21. Unit Capacity Factor (Using MDC Nett 98.1 85.1 64.5
22. Unit Capacity Factor (Using DER Net) 0.0 5.5 10.4
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months iType. Date,and Duration of Eachi:

Unit One is not currently scheth.21ed to shutdown within the next six nonths.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA
26. Units in Test Status (Prior to Commercial Operation r Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION t o li' )

$pANN4 g # -

r :

g

+

p:g.}\ > .

R P f 50-387 .-

'#' ' fIIDL UNIT Sl1UIDOWNS AND POWER REDUCI10NS DOCKET NO. ,

,Y UNIT NAME SSES- Unit One DATE 05/09/88 k @6 @[

Ikic REPORT MONT11 April, 1988 COMPLETED BY TELEPHONE

.T A _ Hi rt-(717)S42-3917 w.

_ E c

-, $g 3j j $5 Licensee h E S%

Cause & Corrective N. .. Date g 3g jg5 E4nt u? Action to

$3 5 3 ;f3 :

e  !

Repost

  • EV u

!'3 Present Recurrence 6

4 880430 S 0 B 5 NA JD zzzzzz Ch 7pril 30, 1988, at approxuetely 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br />, Operations perra nel began decreasing reactor power to perform a control rod secuence exchange and to scram time 19 oontrol rods. Follcving cmpletion of these activities, operatims perscnnel increased reactor power. Full power operation was restored on Kr/ 1, 1988 at approxinntely 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />.

I 2 3 4 f: Forted Reawn: Method. Exhibit G -Instructims S Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for lxensee C-Refucimg 3 Automatic Scram. Esent Report (LER) File (NUREG-D-Regulatory Restriction 4-Continuation 0161) 14)perator Training & 1xense I namination from previous month F-Adnunist rative 5 G-Operational I rror (I splam) 5-Reduction Exhibit I - Same Serce (9/77) Il4)t her (E xplam) 9-Other

SUSQUEIU\NNA STFRt EIECTRIC STATION Docket Ntaber 50-387 Ente 05/09/88 Orpleted by J.A. Ilirt 'Iblephone (717)542-3917 l

l l

Onllenges to Main Steam Safety Iblief Valms Nano Own,*s to the Offsite Dose Calculatico Funual l Ncne bhjor dunges to Padioactive Waste Treatment Systems Ibne

  • 4gANN4 AVER AGE D ALLY UNIT POWE R LEVEL p ~ Wi.f .,.

50-388 (4 .... .

2

$ DOCKET No.

hO

~

nJ UNIT O 05/09/88 Y DATE CO%IPLETED BY J.A. Ilirt (RIC c5Tb TELLP110NE (717)542-3917 MONTil April, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL t MWe-Net) otwe. Net)

I 17 2 0 18 0 3 0 i9 0 0 ,o 0 4

0 0 5 33 __

6 0 22 0 7 0 23 0

0 ,4 0

8 0

9 25 10 0 23 0 0 ,, 0 ll 0 0 12 ,3 13 __

0 29 0 0 30 0 14 15 0 3i 16 0 INSTRUCTIONS On this format.hst the aserage daily umt power lesel m stWe. Net for each day in the reporting month. Compute f o the nearest whole mepwatt.

oI77)

gANN4 D

W s 4'N %73

~....

L. . r *, ; OPERATING DATA REPORT Q DOCKET No. 50-388 DATE 05/09/8s h NIC $@6 COMPLETED BY 7 L Hi rt TELEPHONE f717)542-3917 OPERATING STATUS Unit 'Iko SusyJunna Steam Electric Station Notes

1. Unit Name:

April, 1988

2. Reporting Period:

3,293

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

1,154 1,065

5. Design Electrical Pating (Net MWe):

1,068

6. Maximum Dependable Capacity (Gross MWe):
7. Masimum Dependable Capacity (Net MWel:

I'#

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasoits:

Ncne

9. Powe'r Lesel To which Restricted,if Any (Net MWe): he
10. Reasons For Restrictions.lf Any: N/A This Month Yr..to.Date Cumulatise 719 2,9n3 28,175
11. Hours in Reporting Period 0 1.560 23.152
12. Number Of Hours Reactor was Critical 0 0 717.9
13. Reactor Resene Shutdown Hours 22,697.4 0 1,536.5
14. Houn Generator On-Line 0 0 0
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 0 4,798,980 71,424,693 0 1,572,662 23,379,424
17. Gross Electrical Energy Generated (MWH)

-6,209 1,511,085 22,509,360

18. Net Electrical Energy Generated (MhH) 0 52.9 80.6
19. Unit Senice Factor 0 52.9 80.6
20. Unit Asailability Factor 0 50.5 _ 77.4
21. Unit Capacity Factor (Using MDC Net) 75.0 0 48.9 _
22. Unit Capacity Factor (Using DER Net) 0 0 0.7
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months tty pe. Date.and Duration of Eacht:

thit Two is currently shutdown for its second refueling outape.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: bby 21, 1988
26. Units in Test Status (Prior to Commercial operation): Forecast Achiesed INITI AL CRITICALITY INITI AL ELECTRICITY COMMERCI AL OPER ATION to!77 :

gANPv4

%f

  • j l j'[ }f 'l'7
  1. DOCKET NO. 50-388 ,

1 UN:T SitUIDOWNS AND POWER REDUCTIONS g,

" h UNIT N AME 'l%D Y.

g 0 DATE n; /ns)/RR

- 7.%IC 6g3 6 REPORT MON 111 April, 1988 COMPLETED BY __J. A. liirt TELEPHONE (717)542-3317

-, 5E g Ek Ekensee [-r, Cause & Currective No. Daic g 3g ( }g5 Event E? k% Action to c3 E 5 e

~~ ;g c Repint # EU h'l O

Pievent Recurrente 6

1 880305 S 719 C 1 NA zzzz zzzzzz Q1 Mardi 5,1988, at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, Operations personnel placal the reactor mode switch in the "shutdown" position to cxrrrnce the Unit's second refueling outage.

I 2 3 4 F Fosted Reasim: Method: Exlubit G - Instructi.ms S. Stheduled A-l~qmpment Failure (Explam) I-Manual for Pseparation of Data B-Maintenance or Test 2-Man ual Scram. Entey Sheets for Licensee C-Refueling 3-Autonutic Scram. Event Repixt (LI R) Fde (NURI G-D-Regulatory Restiksi.m 4 Continuation 0161)

I f)perator Trammg a IAcusc i namination from previous month F- Adnu mst ratise 5 GI)peratumal I snos il aplaml 5-Reduction I mhibis 1 - Sanw Source es/77) II 0:her (E splam, 9-Other

SUSQUDIIMIA SEV1 EIECTRIC STATIQ4 Docket IAurber 50-388 Date 05/09/88 Ompleted trf J. A. Ilirt 'Iblephone (717)S42-3917 dullenges to Fhin Steam Safety Felief Valms None 01anges to the Offsite Ibse Calculation Manual tbne bhjor Qianges to Padioactive Waste Treatrent Systans ibne

.y3 e

((fL3 Pennsylvania Power & Light Company Two North Ninth Street e Allentown, PA 18101 1179 e 215/770-5151 Submitted pursuant to Technical Specifications Harold W. Keiser Section 6.9.1.6 Senior Vice President Nuclear 215/770-4194 MAY I 31988 Mr. William G. Mcdonald Director, Office of Administration and Resources Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 PLA-3027 FILE R41-2A 50-388/NPF-22

Dear Mr. Mcdonald:

The April 1988 conthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, y -

1, 2 3

H. W. Keiser Attachment ec: Document Control Desk (Original)

NRC Region I Mr. F. I. Young - NRC Sr. Resident Inspector Mr. M. C. Thadani - NRC Project Manager I

1