PLA-2530, Monthly Operating Repts for Aug 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1985
ML20136B671
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/31/1985
From: Keiser H, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2530, NUDOCS 8511200260
Download: ML20136B671 (9)


Text

_

.- 4

' N4 AVERAGE DAILY UNIT POWER LEVEL

^ 4>

i M eg E DOCKET NO. 50-387 L7 '  %

UNIT One fp h DATE 09/05/85 L.A. Kuczynski R{C $ COMPLETED BY TELEPHONE (717)S42-3759 gg g August, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1035 37 887 2 1035 33 1015 3 1036 19 1023 -

4 1030 20 1028 5 1020 21 1031 6 1007 22 1033 7 1023 1035 23 -

3 1026 1031 24 9 1027 25 1026 10 1026 26 1021 gg 1021 1026 27 12 1031 3 1028 i

33 1026 29 1028 34 1014 1026 3o 15 1015 3 1034 16 1024 l

l l

INSTRUCT 10NS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

' - (9/77) 8511200260 850831 PDR R

ADOCK 05000387 PDR IQght

y %4

-K j t?9 '7 Z ____ $

t 'L_ . . - ZL , j OPERATING DATA REPORT N DOCKET NO. 50-387 Q

h ?ggg gYM DATE 09/05/85 COMPLETED BY l.A. J.tglynski TELEPHONE (717)S42-3759 OPERATING STATUS Unit 1 Susquehanna Steam Electric Station N 5

1. Unit Name:
2. Reporting Period:

August, 1985

3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152 1065

~

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 1068
7. Maximum Dependable Capacity (Net MWe): 1032
5. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

None

9. Power Level To Which Restricted. If Any (Net MWe): None
10. Reasons For Restrictions. If Any: None This Month Yr. to.Date Cumulatise
11. Hours in Reporting Period 744 5.831 19,584
12. Number Of Hours Reactor Was Critical 744 2.892.5 13.285.2
13. Reactor Reserve Shutdown Hours 0 41.8 513.2
14. Hours Generator On.Line 744 2,812.5 12,959.4
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 2.434.576 8.534.879 39.163.867
17. Gross Electrical Energy Generated (MWH) 787,202 2,763,238 12.753,768
18. Net Electrical Energy Generated (MWH) 759,953 2.622,365 12.202.935
19. Unit Service Factor 100 48.2 66.2
20. Unit Availability Factor 100 48.2 66.2 -
21. Unit Capacity Factor (Using MDC Net) 99 43.6 60.4
22. Unit Capacity Factor (Using DER Net) 95.9 42.2 58.5
23. Unit Forced Outage Rate 0 1.9 11.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each t:

Refueling Outage; February 15, 1986; 84 days

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77 )

( i 9

/

7 7 SF N

) ,o SF c o u hr ec

)O

_ de l ud N d

l e o n 0IA g e D a '

I D t. !( ANN et E  ;

- 2 Y')N 4

\

I

- GFEDCBAR l - - - - - - - e Hg, - %v OOAORRMEa tp dp e e aqs hemeg fiu o r a ia r u eunin er tp

( t nt l innm al e

$35 Eoti i s roto ae xnr r g pl li a a nn 2gE a r Ty t a ct e F iEviR nrr ene oa

) is fi l o nt r g i Tu r r

(

&c t e

s e 5n3 E i t(

s L o E p i n x c p h e l ni n a j 3 *_.

)

t e ni

)

igY j U

  • E N

'x d g 5 3 s" I T

a S

mi H n R a E U t

i P T o R L O D n eEi O p v ec R roe n n s T W t t e M N a e S O

N A D N 3 I D P

A O 95 4321 M

- - - - E u W 0R fCAMMe rouaah t mpg o

g u E te t nno s R hdon eu m tm o auud a . ,

t R rc pnt S a i ll E

t ic 1 D

iruc r gE6g*E 9 U o e a Sa -

C n v iia.

tcr m h* 5 8

D oom un.

O N

s S m

o n

t h

5 4 C P O r C E 0EEfE o e a T M D x 1 vn r x v

e u E P UO h 6et h nae s

L L NC b

i 1 nr

) ty rPib t c

& E PE T TK I

H E D N ET t

RSpt ei i

t Ri I

ehaG e oC c no

- per ea O D AA N S

- ut r r oec NBTM r

EYEE.O t

m a otofns r

t

(

s ionI t r

e n t i

e Lr oru c v ( L 0 O 5 E e e n 0 S Lfc 7 . 9 o RiDi c t 1 / e -

u r

)

eao 7 .A 0 3 c Fnt i s n a

) 5 8 e le s 5 K / 7 e e 4 u 8

(

N 2 c 5

- z U 3 y R 7 n E 5 s G -

9 k i

Vn

m-m 5

Unit 1

-SUSQUEHANNA STEAM ELECTRIC STATION Docket No. 50-387 Date 09/05/85 Completed by L.A. Kuczynski' Telephoen (717)S42-3759 Chal'lenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual None'-

' Mdjor Changes ' to Radioa'ctive Waste Treatment' Systems None.'

y :.

'4

'l r

4

.gANN4@

W AVERAGE DAILY UNIT POWER LEVEL Q Q N0]\?

50-388

@ w .\

DOCKET NO.

a ' " %;

L7 UNIT Two

  • Ip G2B 4 # DATE 0 9/05/85 L. A. Kuczynski NJC $Y COMPLETED BY TELEPHONE (717)S42-3759 MONTH August, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWww g 1043 37 1040 2 1043 13 1036 3 1044 19 1034 .

4 1028 20 1041 5 349 21 1043 6 0 1046 22 7 0 1046 23 -

3 590 24 1040 9 840 25 1035 10 1018 1029 26 11 1030 27 1035 12 1039 a

, 1038 13 1033 29 1037 34 1022 30 1036 15 1025 3g 1044 16 1036 INSTRUCT 10NS On this format, list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/771 l

l l

i

.- U h

, , ss e _ = _ _

tN. ZZJ OPERATING DATA REPORT Q DOCKET NO. 50-388 hhgg [4 DATE Two COMPLETED BY 09/05/85 TELEPHONE (717)S42-3759 OPERATING STATUS Unit 2 Notes

1. Unit Name: Susquehanna Steam Elect ric Stat ion
2. Reporting Period: Auaust. 1985
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWel: 1065
6. Maximum Dependable Capacity (Gross MWe): 1068
7. Maximum Dependable Capacity (Net MWe): 1032
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:

None

9. Power Level To which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions,if Any: None This Month Yr. to.Date Cumulatise
11. Hours In Reporting Period 744 4,823 4,823
12. Number Of Hours Reactor Was Critical 691.5 4.343.8 4.343.8
13. Reactor Reserve Shutdown Hours 52.5 432.7 43?.7
14. Hours Generator On-Line 680 4,241.5 4,241.5
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 2,198,260 13.363.794 13.363.794
17. Gross Electrical Energy Generated (MWH) 714,908 4.358,034 4.358.034
18. Net Electrical Energy Generated (MWH) 688.440 4.200.939 4.200.939
19. Unit Service Factor 91.4 87.9 87.9
20. Unit Availability Factor 91.4 87.9 87.9 -
21. Unit Capacity Factor iUsing MDC Net) 89.7 84.4 84.4
22. Unit Capacity Factor (Using DER Net) 86.9 81.8 81.8
23. Unit Forced Outage Rate 8.6 12.I 12.1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Status tPrior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIA L OPERATION (u/7h

e- 3 q,M 4 4

hI k u) A

\

3 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-388 UNIT NAME Two

$D Prat gd DATE 09/05/85 ,

COMPLETED BY L.A. Kuczynski -

O7 'NIC SIg REPORT MONTil August, 1985 I TELEPHONE (717)542-3759

, .! E }t; $h Licensee Eg . Cause & Corrective No. Date i 5g os5 Event g? g3 Action to H

$= $ j@g Repori n mO g' Prevent Recurrence 6

13 850805 F 64 G 3 85-023-00 CH INSTRU Due to an error by an ISC technician

  • during a routine surveillance test of the feedwater level control system, vessel icvel increased to'the turbine trip setpoint. The reactor scrarnmed -

following the turbine trip. tb ECCS actuated; none were required. Plant response was per design.

I 2 3 4 F: Forced Reason: Method: Exlubit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LE R) File (NUREG-D-Regulatory Restriction 4-Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5' G-Operational Error (Explain) 5-Reduction Exhibit 1 - Same Source (9/77) II-Ot her (E xplain) 9-0ther

.c ,

Unit 2 SUSQUEHANNA STEAM ELECTRIC STATION Docket No. 50-388 Date 09/05/85 Completed by L. A. Kuczynski Telephone (717)S42-3759 Challenges to Main Steam Safety Relief Valves .

None 1

Changes'to the Offsite Dose Calculation Manual None

- Major Changes to Radioactive Waste Treatment Systems None r

i

. i.

b s

L k._w a,- . , - - ~ - , . - - . . _ , - - . - - - - - . _ . - . - - - . _ _ - - - _ . - - -

T x *- s g.

Q Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 / 77G5151 Harold W. Keiser Vice President-Nuclear Operations 215/770-7502 SEP1'1885 Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2530 50-388/NPF-22

Dear Mr. Beebe:

The August 1985 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, H. W. Keiser Vice President-Nuclear Operations Attachment cc: Dr. Thomas E. Murley Regional Administrator-Region I

- U.S. Nuclear Regulatory Commission -

631 Park Avenue King of Prussia, PA 19406

-Director-Office of Inspection and Enforcement .

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk (12 copies)

Mr. R. H. Jacobs - NRC Ms. M. J. Campagnone -NRC i

. . . .- . .