MONTHYEARML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions PLA-3027, Monthly Operating Repts for Apr 19881988-04-30030 April 1988 Monthly Operating Repts for Apr 1988 PLA-2938, Monthly Operating Repts for Oct 19871987-10-31031 October 1987 Monthly Operating Repts for Oct 1987 PLA-2924, Monthly Operating Repts for Sept 19871987-09-30030 September 1987 Monthly Operating Repts for Sept 1987 PLA-2913, Monthly Operating Repts for Aug 19871987-08-31031 August 1987 Monthly Operating Repts for Aug 1987 PLA-2900, Monthly Operating Rept for Jul 19871987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 PLA-2886, Monthly Operating Repts for June 19871987-06-30030 June 1987 Monthly Operating Repts for June 1987 PLA-2866, Monthly Operating Repts for May 19871987-05-31031 May 1987 Monthly Operating Repts for May 1987 PLA-2853, Monthly Operating Repts for Apr 19871987-04-30030 April 1987 Monthly Operating Repts for Apr 1987 PLA-2832, Monthly Operating Repts for Mar 19871987-03-31031 March 1987 Monthly Operating Repts for Mar 1987 PLA-2810, Monthly Operating Repts for Feb 19871987-02-28028 February 1987 Monthly Operating Repts for Feb 1987 PLA-2798, Monthly Operating Repts for Jan 19871987-01-31031 January 1987 Monthly Operating Repts for Jan 1987 PLA-2782, Monthly Operating Repts for Dec 19861986-12-31031 December 1986 Monthly Operating Repts for Dec 1986 PLA-2765, Monthly Operating Repts for Nov 19861986-11-30030 November 1986 Monthly Operating Repts for Nov 1986 PLA-2753, Monthly Operating Repts for Oct 19861986-10-31031 October 1986 Monthly Operating Repts for Oct 1986 ML20207F9501986-09-30030 September 1986 Monthly Operating Repts for Sept 1986 PLA-2713, Monthly Operating Repts for Aug 19861986-08-31031 August 1986 Monthly Operating Repts for Aug 1986 PLA-2701, Monthly Operating Rept for Jul 19861986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 PLA-2675, Monthly Operating Repts for June 19861986-06-30030 June 1986 Monthly Operating Repts for June 1986 PLA-2660, Monthly Operating Repts for May 19861986-05-31031 May 1986 Monthly Operating Repts for May 1986 PLA-2639, Monthly Operating Repts for Apr 19861986-04-30030 April 1986 Monthly Operating Repts for Apr 1986 PLA-2624, Monthly Operating Repts for Mar 19861986-03-31031 March 1986 Monthly Operating Repts for Mar 1986 PLA-2606, Monthly Operating Repts for Feb 19861986-02-28028 February 1986 Monthly Operating Repts for Feb 1986 PLA-2595, Monthly Operating Repts for Jan 19861986-01-31031 January 1986 Monthly Operating Repts for Jan 1986 PLA-2580, Monthly Operating Repts for Dec 19851985-12-31031 December 1985 Monthly Operating Repts for Dec 1985 PLA-2567, Monthly Operating Repts for Nov 19851985-11-30030 November 1985 Monthly Operating Repts for Nov 1985 PLA-2552, Monthly Operating Repts for Oct 19851985-10-31031 October 1985 Monthly Operating Repts for Oct 1985 PLA-2543, Monthly Operating Repts for Sept 19851985-09-30030 September 1985 Monthly Operating Repts for Sept 1985 PLA-2530, Monthly Operating Repts for Aug 19851985-08-31031 August 1985 Monthly Operating Repts for Aug 1985 PLA-2516, Monthly Operating Repts for Jul 19851985-07-31031 July 1985 Monthly Operating Repts for Jul 1985 PLA-2500, Monthly Operating Repts for June 19851985-06-30030 June 1985 Monthly Operating Repts for June 1985 PLA-2487, Monthly Operating Repts for May 19851985-05-31031 May 1985 Monthly Operating Repts for May 1985 PLA-2466, Monthly Operating Repts for Apr 19851985-04-30030 April 1985 Monthly Operating Repts for Apr 1985 PLA-2442, Monthly Operating Repts for Mar 19851985-03-31031 March 1985 Monthly Operating Repts for Mar 1985 PLA-2424, Monthly Operating Repts for Feb 19851985-02-28028 February 1985 Monthly Operating Repts for Feb 1985 PLA-2409, Monthly Operating Repts for Jan 19851985-01-31031 January 1985 Monthly Operating Repts for Jan 1985 PLA-2387, Monthly Operating Repts for Dec 19841984-12-31031 December 1984 Monthly Operating Repts for Dec 1984 PLA-2371, Monthly Operating Repts for Nov 19841984-11-30030 November 1984 Monthly Operating Repts for Nov 1984 PLA-2349, Monthly Operating Repts for Oct 19841984-10-31031 October 1984 Monthly Operating Repts for Oct 1984 PLA-2330, Monthly Operating Repts for Sept 19841984-09-30030 September 1984 Monthly Operating Repts for Sept 1984 PLA-2305, Monthly Operating Repts for Aug 19841984-08-31031 August 1984 Monthly Operating Repts for Aug 1984 PLA-2273, Monthly Operating Repts for Jul 19841984-07-31031 July 1984 Monthly Operating Repts for Jul 1984 PLA-2248, Monthly Operating Repts for June 19841984-06-30030 June 1984 Monthly Operating Repts for June 1984 ML20092M9831984-05-31031 May 1984 Monthly Operating Repts for May 1984 PLA-2195, Monthly Operating Repts for Apr 19841984-04-30030 April 1984 Monthly Operating Repts for Apr 1984 1998-02-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML17146B1741999-08-0303 August 1999 GL 96-06 Risk Assessment for Sses. ML20206D3331999-04-27027 April 1999 SER of Individual Plant Examination of External Events Submittal on Susquehanna Steam Electric Station,Units 1 & 2. Staff Notes That Licensee IPEEE Complete with Regard to Info Requested by Suppl 4 to GL 88-20 ML20195B2381999-03-31031 March 1999 Redacted Version for 10CFR2.790 Request for Decommissioning Status Rept for Sses,Units 1 & 2 ML17164A8451998-10-31031 October 1998 SSES Unit 1 Tenth Refueling & Insp Outage ISI Outage Summary Rept. ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20217Q4891998-04-21021 April 1998 Rev 1 to Draft LDCN 2482, FSAR Chapter 13.4 & FSAR Chapter 17.2 Changes to Support ITS Implementation ML18026A4931998-03-30030 March 1998 LER 97-007-01:on 971017,entry Into TS 3.0.3 Occurred to Allow Completion of Surveillance Testing of One Channel of Rbm.Caused by Failure of Components in LPRM Output to Rbm. Submitted TS Change Request to Extend LCO Action Statement ML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18026A4891997-11-17017 November 1997 LER 97-007-00:on 971017,TS 3.0.3 Entry Voluntarily Made. Caused by Inadequate Post Maint Testing Following Earlier Work Associated W/Components.Failed Components Repaired, Replaced & Testing Completed ML18017A2921997-10-28028 October 1997 1997 Nrc/Fema Observed Exercise. ML17158C1861997-06-0505 June 1997 Proceedings of Intl Topical Meeting on Advanced Reactors Safety Vol II, on 970601-05 ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML18026A4781997-03-28028 March 1997 Rev 1 to Application of Anfb to ATRIUM-10 for Susquehanna Reloads. ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20155F7661996-07-25025 July 1996 Partially Deleted Job Number 739619-96, Investigation of E Diesel Breaker Misalignment ML20155F7491996-07-24024 July 1996 Independent Safety Evaluation Svcs Project Rept 3-96, Investigation of E Diesel Generator In-Operability Event ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML18026A5961996-01-0202 January 1996 LER 95-013-00:on 951119,thermally Induced Pressure Locking of HPCI Valve Occurred Under Bonnet Pressure of 3,000-7,000 Psig.Damaged HPCI Injection Valve repaired.W/960102 Ltr ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17158A8771995-08-15015 August 1995 Exercise Manual. ML17158A8061995-07-14014 July 1995 Books 1 & 2 of ISI Outage Summary Rept SSES Unit 1 8th Refuel Outage. ML18017A0461995-07-0707 July 1995 LER 95-008-00:on 950609,shift Average Licensed Core Thermal Power Was Exceeded.Caused by Failed Instrumentation Drift. Repaired & Recalibrated Subject Instrumentation ML17164A6631995-04-11011 April 1995 Impact of Extending T-10 AOT from 3 to 7 Days. ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML18026A5351994-10-31031 October 1994 SSES Unit 1 & 2 MSIV Leakage Alternate Treatment Method Seismic Evaluation. W/One Oversize Drawing ML17158A4821994-08-23023 August 1994 ISI Outage Summary Rept Unit 2 6th Refueling Outage, Books 1 & 2 of 2 ML17158A2391994-04-0505 April 1994 Books 1 & 2 of SSES Unit 1 Seventh Refueling & Insp Outage ISI Outage Summary Rept. ML18017A2701993-12-31031 December 1993 PP&L Annual Rept 1993. ML17158A2651993-12-31031 December 1993 Allegheny Electric Cooperative,Inc Annual Rept 1993. ML17158A1631993-12-0909 December 1993 Remote Indication of Spent Fuel Pool Level & Temperature. ML18026A4281993-08-16016 August 1993 PP&L Response to NRC Concerns Re Loss of Spent Fuel Pool Cooling Following Loca,Sses,Units 1 & 2. ML18026A4261993-06-0909 June 1993 LER 90-007-01:on 900705,primary Power Supply to RPS a Power Distribution Panel Lost When One Electrical Protection Assembly (EPA) Breaker Tripped.Epa Logic Cards Reviewed & RPS Power Supply Will Be redesigned.W/930609 Ltr ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML18017A2031993-02-0101 February 1993 Books 1 & 2 of Unit 2 Fifth Refueling & Insp Outage,Isi Outage Summary Rept. ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions ML17157C3691992-12-31031 December 1992 PP&L Annual Rept 1992. ML20056C3941992-12-31031 December 1992 Allegheny Electric Cooperative,Inc Annual Rept 1992 ML18017A0421992-12-14014 December 1992 Suppl to 921127 Part 21 Rept Re High Air Concentration in Reactor Bldg Making Area Uninhabitable for Retrieving Air Filters,Per NUREG-0737,Item II.F.1.Util Current Position Re Fuel Pool Cooling Issues Contrary to Reg Guide 1.3 ML18026A2481992-11-27027 November 1992 Part 21 Rept Re Substantial Safety Hazard in Design of Facility for Loss of Normal Spent Fuel Pool Cooling ML18026A4231992-11-17017 November 1992 LER 92-016-00:on 920416,discovered That Existing Analysis for Two Spent Fuel Storage Pools Did Not Reflect Current Fuel Design & Plant Operation.Caused by Failure to Modify FSAR Analysis.Fsar Will Be revised.W/921117 Ltr ML17157C1421992-10-21021 October 1992 Engineering Assessment of Fuel Pool Cooling Piping EDR-G20020. ML17157C1411992-08-31031 August 1992 Loss of Fuel Pool Cooling Event Evaluation. ML17157C1401992-08-31031 August 1992 Review of Fuel Pool Cooling During Postulated Off-Normal & Accident Events SSES Units 1 & 2. ML20082C4941992-08-14014 August 1992 Evaluation of Unit 1 & Unit 2 Derating of Power Cables in Raceways Wrapped W/Thermo-Lag Matl ML17157C1381992-07-27027 July 1992 Safety Consequences of Boiling Spent Fuel Pool at Susquehanna Steam Electric Station. ML17157B9331992-07-24024 July 1992 Sixth Refueling & Insp Outage Inservice Insp Outage Summary Rept, Books 1 & 2 ML20097D4681991-12-31031 December 1991 Pennsylvania Power & Light Company,1991 Annual Rept ML18017A0391991-07-26026 July 1991 LER 91-010-00:on 910628,RWCU Isolated on Two Occassions Due to Actuations of Steam Leak Detection Instrumentation. Caused by Design Deficiency & Elevated Ambient Penetration Room Temps.Temp Modules replaced.W/910726 Ltr 1999-09-30
[Table view] |
Text
I d
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-387 gggy4 UNIT One 4
DATE 9/06/95
, 4 3 ,
y COMPLETED BY R.S. Ball e i
. 3 TELEPHONE (717) S42-3453 L -ita ;
MONTII Aucust 1995 P
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)
- 1. 1081 17, 1080
- 2. 1079 18. 1083
- 3. 1075 19. 1090
- 4. 1078 20. 1091
- 5. 1083 21. 1085
- 6. 1985 22. 1091
- 7. 1091 23. 1093
- 8. 1095 24. 1088
- 9. 1096 25. 1094
- 10. 1088 26. 1087 11, 1082 27. 1085
- 12. 1083 28. 1091
- 13. 1087 29. 1089
- 14. 1083 30. 10 1 _
- 15. 1076 31. 1086
- 16. 1076 INSTRUCTION:
On this format, list the average daily unit power level in MWe-Net Ar each day in the reporting month. Compute to the nearest whole megawatt.
Page1of1-9509210176 950915 PDR ADOCK 05000387 R. PDR
1 i
- j OPERATING DATA REPORT l AN DOCKET NO. 50-387 4 @y@ UNIT One l:) 7 DATE 9-06-95 W '
- E COMPLETED BY R.S. Ball L
"" J TELEPHONE (717) S42-3453 PPat h+
YRI 5 OPERATING STATUS NOTES:
- 1. Unit Name: Susquehanna Steam Electric Station (Ul)
- 2. Reporting Period: Aucust 1995
- 3. Licensed Thermal Power (MWt): 3441
- 4. Nameplate Rating (Gross MWe): 1165
- 5. Design Electrical Rating (Net MWe): 1100
- 6. Maximum Dependable Capacity (Gross MWe): 1128
- 7. Maximum Dependabic Capacity (Net MWe): 1090
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Repon, Give Reasons:
None
- 9. Power Level To Which Restricted, If Any (Net MWe): None
- 10. Reasons For Restrictions, if Any: N/A This Month Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 744 5.831 107.232
- 12. Number of Hours Reactor Was Critical 744 4.827.3 84.068.2
- 13. Reactor Reserve Shutdown Hours 0 0 1.032
- 14. Hours Generator On-Line 744 4.805.8 82.560.5
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 2.437.773 15.301.864 260.459.734 17, Gross Electrical Energy Generated (MWH) 836.700 5.102.155 85.205.375
- 18. Net Electrical Energy Generated (MWH) 807.865 4.908.332 81.885.292
- 19. Unit Service Factor 100.0 82.4 77.0
- 20. Unit Availability Factor 100.0 82.4 77.0
- 21. Unit Capacity Factor (Using MDC Net) 99.6 78 8 73.3
- 22. Unit Capacity Factor (Using DER Net) 98.7 78.1 72.6
- 23. Unit Forced Outage Rate 0 0 7.3 i
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down at End of Repon Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Page1ofI
UNIT SHUTDOWNS AND POWER REDUCTIONS
l 9 '
i UNIT One '-
g DATE 9-06-95 COMPLETED BY . R.S. Ball
- IELEPHONE 0 17) 542-3453 REPORT MONTH August 1995 No. Date Type' Duration Reason 2
Me* hod of Ixensee Component Cause & Corrective Action (Ilours) Shutting Event System Code' to Present Recurrence Down Reactor 8 Report # Code' NO REPORT REQUIRED l
i j 1. 2. 3. 4.
F. Forced Reason: Method: Exhibit G -Instructions I S. Scheduled A - Equipment Failure (Explain) l- Manual for Preparation of Data l B - Maintenance or Test 2- Manual Scram Entry Sheets for Licensee
! C - Refueling 3- Automatic Scram Event Report (LER) File (NUREG-0161) l D - Regulatory Restriction 4- Continuation from presious E - Operator Training & License month 5.
Examination 5- Reduction Exhibit 1 - Same Source F- Administrative 9- Other C- Operational Error (Explain)
H - Other (Explain)
Page1ofI
_ _ . . ~ . . . _
SUSQUEHANNA STEAM ELECTRIC STATION i
Docket Number: 50-388 Date: 9/6/95 Completed by: R. S. Ball Telephone: (717) 542-3453 Challenaes to Main Steam safety Relief Valves i
None.
! Chanaes to the Offsite Dose Calculation Manual
)
Yes. See Attachment A for changes.
Maior chanaes to Radioactive Waste Treatment Systems None. ,
i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-388 UNIT Two ANN 4 DATE 9-06-95 fy
, p COMPLETED BY R.S. Ball
'P TELEPHONE (7171 542 3453 3 ;
m '
rnvr E i '"' ;
MONTil Aucust 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)
- 1. 1059 17. 1055
- 2. 1054 18. 1059
- 3. 1050 19. 1050
- 4. 1052 20. 1069
- 5. 1056 21. 1063
- 6. 1061 22. 1072
- 7. 1073 23. 1077
- 8. 1076 24. 1071
- 9. 1072 25. 1082
- 10. 1064 26. 1079
- 11. 1058 27. 1037
- 12. 1058 28. 1072
- 13. 1061 29. 1070
- 14. 1053 30. 1073
- 15. 1045 31. 1066
- 16. 1049 INSTRUCTION:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Page1ofI l
i
OPERATING DATA REPORT AN 4 DOCKET NO. 50-388
. <h UNIT Two O 7 DATE 9-06-95 i 9 '
- E COMPLETED BY R.S. Ball L '" " ; TELEPliONE (717) 542-3453 0
+
SY c
YRI Notes:
OfERATING STATUS
- 1. Unit Name: Susauchanna Steam Electric Station (U2)
- 2. Reporting Period: August 1995
- 3. LicensedThermalPower(MWt): 3441
- 4. Nameplate Rating (Gross MWe): 1168
- 5. Design Electrical Rating (Net MWe): 1100
- 6. Maximum Dependable Capacity (Gross MWe): 1132
- 7. Maximum Dependable Capacity (Net MWe): 1094
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
None
- 9. Power Level To Which Restricted, If Any (Net MWe): None
- 10. Reasons For Restrictions, if Any: N/A This Month Yr.-to-Date Cumulative
- 11. Ilours in Reporting Period 744 5.831 92.471
- 13. Number of11ours Reactor Was Critical 744 5.701.6 77.888.5
- 13. Reactor Reserve Shutdown llours 0 0 717.9
- 14. Ilours Generator On-Line 744 5.680.6 76.471.3
- 15. Unit Reserve Shutdown llours 0 0 0
- 16. Gross Thermal Energy Generated (MWil) 2.519.013 19.301.631 245.344.341
- 17. Gross Electrical Energy Generated (MWil) 819.048 6.300.736 80.475.520
- 18. Net Electrical Energy Generated (MW11) 790.491 6 085.416 77.486.312
- 19. Unit Service Factor 100.0 97.4 82.7
- 20. Unit Availability Factor 100.0 97.4 82.7
- 21. Unit Capacity Factor (Using MDC Net) 97.1 95 4 79.7
- 22. Unit Capacity Factor (Using DER Net) 96.6 94.9 79.3 23 Unit Forced Outage Rate 0 26 5.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueline Outage to rJLmmence 9/16/95 with an estimated duration of 50 days.
25, if Shut Down at End of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPERATION Page1of1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-388
_-[
4 $(, uNrr T DATE 9-06-95 COMPIEIED BY R.S. Ball TELEPHONE- (717) 542-3453 REPORT MONTH August 1995 Duration Reason' Method of Licensee System Component . Cause & Corrective Action -
No, Date Tp t (Hours) Shutting Event Code
- Code' to Prevent Recurrence Down Reactor 5 Report #
NO REPORT REQUIRED
.1. 2. 3. 4.
F. Forced Reason: Method: Exhibit G -Instructions S. Scheduled A -_ Equipment Failure (Explain) 1- Manual for Preparation of Data B - Maintenance or Test 2- Manual Scram Entry Sheets for Licensee C - Refueling 3- Automatic Scram Event Report (LER) File (NUREG4161)
D - Regulatory Restriction 4- Continuation from previous E - Operator Tiaining & License month 5.
Examination 5- Reduction Exhibit 1 - Same Source F- Administrative 9- Other G- Operat%'.r.' Error (Explain)
H - Other (Eg ain)
Page1ofI .
f L.
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Date: 9/6/95 Completed by: R. S. Ball Telephone: (717) 542-3453 Challenoes to Main Steam safety Relief Valves None.
Chanaes to the Offsite Dose Calculation Manual .
Yes. See Attachment A for changes.
- Maior chanaes to Radioactive Waste Treatment Systems None.
.i i
J 4
1 j
l l
4 l
m 6 4- en 4 m,--gr A - -e,a .n a n4 AeA a o .u sa r --a-. L k
3 i
) e d
2 5
4 4
4 ATTACIIMENT A I
4 1
.1 M
i n
e