MONTHYEARML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions PLA-3027, Monthly Operating Repts for Apr 19881988-04-30030 April 1988 Monthly Operating Repts for Apr 1988 PLA-2938, Monthly Operating Repts for Oct 19871987-10-31031 October 1987 Monthly Operating Repts for Oct 1987 PLA-2924, Monthly Operating Repts for Sept 19871987-09-30030 September 1987 Monthly Operating Repts for Sept 1987 PLA-2913, Monthly Operating Repts for Aug 19871987-08-31031 August 1987 Monthly Operating Repts for Aug 1987 PLA-2900, Monthly Operating Rept for Jul 19871987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 PLA-2886, Monthly Operating Repts for June 19871987-06-30030 June 1987 Monthly Operating Repts for June 1987 PLA-2866, Monthly Operating Repts for May 19871987-05-31031 May 1987 Monthly Operating Repts for May 1987 PLA-2853, Monthly Operating Repts for Apr 19871987-04-30030 April 1987 Monthly Operating Repts for Apr 1987 PLA-2832, Monthly Operating Repts for Mar 19871987-03-31031 March 1987 Monthly Operating Repts for Mar 1987 PLA-2810, Monthly Operating Repts for Feb 19871987-02-28028 February 1987 Monthly Operating Repts for Feb 1987 PLA-2798, Monthly Operating Repts for Jan 19871987-01-31031 January 1987 Monthly Operating Repts for Jan 1987 PLA-2782, Monthly Operating Repts for Dec 19861986-12-31031 December 1986 Monthly Operating Repts for Dec 1986 PLA-2765, Monthly Operating Repts for Nov 19861986-11-30030 November 1986 Monthly Operating Repts for Nov 1986 PLA-2753, Monthly Operating Repts for Oct 19861986-10-31031 October 1986 Monthly Operating Repts for Oct 1986 ML20207F9501986-09-30030 September 1986 Monthly Operating Repts for Sept 1986 PLA-2713, Monthly Operating Repts for Aug 19861986-08-31031 August 1986 Monthly Operating Repts for Aug 1986 PLA-2701, Monthly Operating Rept for Jul 19861986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 PLA-2675, Monthly Operating Repts for June 19861986-06-30030 June 1986 Monthly Operating Repts for June 1986 PLA-2660, Monthly Operating Repts for May 19861986-05-31031 May 1986 Monthly Operating Repts for May 1986 PLA-2639, Monthly Operating Repts for Apr 19861986-04-30030 April 1986 Monthly Operating Repts for Apr 1986 PLA-2624, Monthly Operating Repts for Mar 19861986-03-31031 March 1986 Monthly Operating Repts for Mar 1986 PLA-2606, Monthly Operating Repts for Feb 19861986-02-28028 February 1986 Monthly Operating Repts for Feb 1986 PLA-2595, Monthly Operating Repts for Jan 19861986-01-31031 January 1986 Monthly Operating Repts for Jan 1986 PLA-2580, Monthly Operating Repts for Dec 19851985-12-31031 December 1985 Monthly Operating Repts for Dec 1985 PLA-2567, Monthly Operating Repts for Nov 19851985-11-30030 November 1985 Monthly Operating Repts for Nov 1985 PLA-2552, Monthly Operating Repts for Oct 19851985-10-31031 October 1985 Monthly Operating Repts for Oct 1985 PLA-2543, Monthly Operating Repts for Sept 19851985-09-30030 September 1985 Monthly Operating Repts for Sept 1985 PLA-2530, Monthly Operating Repts for Aug 19851985-08-31031 August 1985 Monthly Operating Repts for Aug 1985 PLA-2516, Monthly Operating Repts for Jul 19851985-07-31031 July 1985 Monthly Operating Repts for Jul 1985 PLA-2500, Monthly Operating Repts for June 19851985-06-30030 June 1985 Monthly Operating Repts for June 1985 PLA-2487, Monthly Operating Repts for May 19851985-05-31031 May 1985 Monthly Operating Repts for May 1985 PLA-2466, Monthly Operating Repts for Apr 19851985-04-30030 April 1985 Monthly Operating Repts for Apr 1985 PLA-2442, Monthly Operating Repts for Mar 19851985-03-31031 March 1985 Monthly Operating Repts for Mar 1985 PLA-2424, Monthly Operating Repts for Feb 19851985-02-28028 February 1985 Monthly Operating Repts for Feb 1985 PLA-2409, Monthly Operating Repts for Jan 19851985-01-31031 January 1985 Monthly Operating Repts for Jan 1985 PLA-2387, Monthly Operating Repts for Dec 19841984-12-31031 December 1984 Monthly Operating Repts for Dec 1984 PLA-2371, Monthly Operating Repts for Nov 19841984-11-30030 November 1984 Monthly Operating Repts for Nov 1984 PLA-2349, Monthly Operating Repts for Oct 19841984-10-31031 October 1984 Monthly Operating Repts for Oct 1984 PLA-2330, Monthly Operating Repts for Sept 19841984-09-30030 September 1984 Monthly Operating Repts for Sept 1984 PLA-2305, Monthly Operating Repts for Aug 19841984-08-31031 August 1984 Monthly Operating Repts for Aug 1984 PLA-2273, Monthly Operating Repts for Jul 19841984-07-31031 July 1984 Monthly Operating Repts for Jul 1984 PLA-2248, Monthly Operating Repts for June 19841984-06-30030 June 1984 Monthly Operating Repts for June 1984 ML20092M9831984-05-31031 May 1984 Monthly Operating Repts for May 1984 PLA-2195, Monthly Operating Repts for Apr 19841984-04-30030 April 1984 Monthly Operating Repts for Apr 1984 1998-02-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML17146B1741999-08-0303 August 1999 GL 96-06 Risk Assessment for Sses. ML20206D3331999-04-27027 April 1999 SER of Individual Plant Examination of External Events Submittal on Susquehanna Steam Electric Station,Units 1 & 2. Staff Notes That Licensee IPEEE Complete with Regard to Info Requested by Suppl 4 to GL 88-20 ML20195B2381999-03-31031 March 1999 Redacted Version for 10CFR2.790 Request for Decommissioning Status Rept for Sses,Units 1 & 2 ML17164A8451998-10-31031 October 1998 SSES Unit 1 Tenth Refueling & Insp Outage ISI Outage Summary Rept. ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20217Q4891998-04-21021 April 1998 Rev 1 to Draft LDCN 2482, FSAR Chapter 13.4 & FSAR Chapter 17.2 Changes to Support ITS Implementation ML18026A4931998-03-30030 March 1998 LER 97-007-01:on 971017,entry Into TS 3.0.3 Occurred to Allow Completion of Surveillance Testing of One Channel of Rbm.Caused by Failure of Components in LPRM Output to Rbm. Submitted TS Change Request to Extend LCO Action Statement ML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18026A4891997-11-17017 November 1997 LER 97-007-00:on 971017,TS 3.0.3 Entry Voluntarily Made. Caused by Inadequate Post Maint Testing Following Earlier Work Associated W/Components.Failed Components Repaired, Replaced & Testing Completed ML18017A2921997-10-28028 October 1997 1997 Nrc/Fema Observed Exercise. ML17158C1861997-06-0505 June 1997 Proceedings of Intl Topical Meeting on Advanced Reactors Safety Vol II, on 970601-05 ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML18026A4781997-03-28028 March 1997 Rev 1 to Application of Anfb to ATRIUM-10 for Susquehanna Reloads. ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20155F7661996-07-25025 July 1996 Partially Deleted Job Number 739619-96, Investigation of E Diesel Breaker Misalignment ML20155F7491996-07-24024 July 1996 Independent Safety Evaluation Svcs Project Rept 3-96, Investigation of E Diesel Generator In-Operability Event ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML18026A5961996-01-0202 January 1996 LER 95-013-00:on 951119,thermally Induced Pressure Locking of HPCI Valve Occurred Under Bonnet Pressure of 3,000-7,000 Psig.Damaged HPCI Injection Valve repaired.W/960102 Ltr ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17158A8771995-08-15015 August 1995 Exercise Manual. ML17158A8061995-07-14014 July 1995 Books 1 & 2 of ISI Outage Summary Rept SSES Unit 1 8th Refuel Outage. ML18017A0461995-07-0707 July 1995 LER 95-008-00:on 950609,shift Average Licensed Core Thermal Power Was Exceeded.Caused by Failed Instrumentation Drift. Repaired & Recalibrated Subject Instrumentation ML17164A6631995-04-11011 April 1995 Impact of Extending T-10 AOT from 3 to 7 Days. ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML18026A5351994-10-31031 October 1994 SSES Unit 1 & 2 MSIV Leakage Alternate Treatment Method Seismic Evaluation. W/One Oversize Drawing ML17158A4821994-08-23023 August 1994 ISI Outage Summary Rept Unit 2 6th Refueling Outage, Books 1 & 2 of 2 ML17158A2391994-04-0505 April 1994 Books 1 & 2 of SSES Unit 1 Seventh Refueling & Insp Outage ISI Outage Summary Rept. ML18017A2701993-12-31031 December 1993 PP&L Annual Rept 1993. ML17158A2651993-12-31031 December 1993 Allegheny Electric Cooperative,Inc Annual Rept 1993. ML17158A1631993-12-0909 December 1993 Remote Indication of Spent Fuel Pool Level & Temperature. ML18026A4281993-08-16016 August 1993 PP&L Response to NRC Concerns Re Loss of Spent Fuel Pool Cooling Following Loca,Sses,Units 1 & 2. ML18026A4261993-06-0909 June 1993 LER 90-007-01:on 900705,primary Power Supply to RPS a Power Distribution Panel Lost When One Electrical Protection Assembly (EPA) Breaker Tripped.Epa Logic Cards Reviewed & RPS Power Supply Will Be redesigned.W/930609 Ltr ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML18017A2031993-02-0101 February 1993 Books 1 & 2 of Unit 2 Fifth Refueling & Insp Outage,Isi Outage Summary Rept. ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions ML17157C3691992-12-31031 December 1992 PP&L Annual Rept 1992. ML20056C3941992-12-31031 December 1992 Allegheny Electric Cooperative,Inc Annual Rept 1992 ML18017A0421992-12-14014 December 1992 Suppl to 921127 Part 21 Rept Re High Air Concentration in Reactor Bldg Making Area Uninhabitable for Retrieving Air Filters,Per NUREG-0737,Item II.F.1.Util Current Position Re Fuel Pool Cooling Issues Contrary to Reg Guide 1.3 ML18026A2481992-11-27027 November 1992 Part 21 Rept Re Substantial Safety Hazard in Design of Facility for Loss of Normal Spent Fuel Pool Cooling ML18026A4231992-11-17017 November 1992 LER 92-016-00:on 920416,discovered That Existing Analysis for Two Spent Fuel Storage Pools Did Not Reflect Current Fuel Design & Plant Operation.Caused by Failure to Modify FSAR Analysis.Fsar Will Be revised.W/921117 Ltr ML17157C1421992-10-21021 October 1992 Engineering Assessment of Fuel Pool Cooling Piping EDR-G20020. ML17157C1411992-08-31031 August 1992 Loss of Fuel Pool Cooling Event Evaluation. ML17157C1401992-08-31031 August 1992 Review of Fuel Pool Cooling During Postulated Off-Normal & Accident Events SSES Units 1 & 2. ML20082C4941992-08-14014 August 1992 Evaluation of Unit 1 & Unit 2 Derating of Power Cables in Raceways Wrapped W/Thermo-Lag Matl ML17157C1381992-07-27027 July 1992 Safety Consequences of Boiling Spent Fuel Pool at Susquehanna Steam Electric Station. ML17157B9331992-07-24024 July 1992 Sixth Refueling & Insp Outage Inservice Insp Outage Summary Rept, Books 1 & 2 ML20097D4681991-12-31031 December 1991 Pennsylvania Power & Light Company,1991 Annual Rept ML18017A0391991-07-26026 July 1991 LER 91-010-00:on 910628,RWCU Isolated on Two Occassions Due to Actuations of Steam Leak Detection Instrumentation. Caused by Design Deficiency & Elevated Ambient Penetration Room Temps.Temp Modules replaced.W/910726 Ltr 1999-09-30
[Table view] |
Text
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO+ 50-387 UNITt One DATEt 03-8-93 COMPLETED BY: K.A. Youn TELEPHONEt 717 542-3251
~O a~c s~
MONTH Februar 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (Mwe-Net) 1045 17 1049 1046 18 1049 1045 19 1050 1045 20 1049 1043 21 1046 1049 22 1046 1047 23 1047 1049 1048 1049 25 1048 10 1047 26 1047 1049 27 1046 12 1049 28 1046 13 1048 29 14 1048 30 15 1049 31 16 1048 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
,9303i90387 9303i6 PDR ADOCK 05000387 PDR R
OPERATING DATA REPORT DOCKET N09! 50-387 DATE! 03-08-93 COMPLETED BY: K.A. Youn GlZS
? gr gab'otes o
iO OPERATING STATUS
- 1. Unit Name: Sus uehanna Steam Electric Station Unit 1
- 2. Reporting Period: Februar 1992
- 3. Licensed Thermal Power(MWt): 3293.
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electrical Rating (Net MWe): 1050
- 6. Maximum Dependable Capacity (Gross MWe): 1078
- 7. Maximum Dependable Capacity (Net MWe)t 1040
- 8. If Changes Occur in Capacity Ratings (Items Number Give Reasons:
3 Through 7) Since Last Report.
1 None
- 9. Power Level To Which Restricted, 10.Reasons For Restrictions, If Any:
If Any N A (Net MWe): None This Month Yr-to-Date Cumulative 11 'ours In Reporting Period 672 1416 85 297
- 12. Number of Hrs Reactor Was Critical 672 1416 67 089.2
- 13. Reactor Reserve Shutdown Hours 0 1032
- 14. Hours Generator On-Line 672 1416 65 714 '
- 15. Unit Reserve Shutdown Hours 0 0
- 16. Gross Thermal Energy Generated(MWH) 2 207 254 4 639 784 206 437 449
- 17. Gross Electrical Energy Generated (MWH) 728 798 1 532 422 67 478 302
- 18. Net Electric Energy Generated (MWH) 703 775 1 480 525 64 846 314
- 19. Unit Service Factor 100 100 77 '
- 20. Unit Availability Factor 100 100 77.0
- 21. Unit Capacity Factor (Using MDC Net) 100 ' 100 ~ 5 73.1
- 22. Unit Capacity Factor (Using DER Net) 99 ' 99 6
~ 72.4
- 23. Unit Forced Outage Rate 0 7;4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If Shut Down At End
- 26. Units In Test Status of Report Period, Estimated Date of Startup:
(Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387 UNIT NAME One REPORT MONTH Februar 1993 DATE 03-08-93 COMPLETED BY K.A. Youn
~aC e>
CAUSE &
METHOD OF CORRECTIVE SHUTTING LICENSEE ACTION TO DURATION DOWN EVENT SYSTEM'OMPONENT PREVENT NO. DATE TYPE (HOURS) REASON REACTOR~ REPORTS CODE CODE RECURRENCE No report required.
F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for preparation. of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Continuation 0161)
E-Operator Training & License Examination from previous month F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other Exhibit I-Same. Source H-Other (Explain)
SUS UEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date: 03-8-93 Completed by K. A. Youn Telephone: 717 542-3251 Challen es to Main Steam Safet Relief Valves ~"
None.
Chan es to the Offsite Dose Calculation Manual None.
Ma or Chan es to Radioactive Waste Treatment S stems None.
Page 2 of 2
'E AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ . 50-388 UNITs DATEt ,03-8-93 COMPLETED BY! K.A. Youn
~O are s~
MONTH Februar 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (Mwe-Net) 17 1064 18 1065 19 1065 20 1065 21 1064 22 1064 491 23 1065 955 24 1065 958 25 1064 10 1064 26 1063 1064 27 1063 12 1065 28 1063 13 1065 29 14 1063 30 15 1064 31 16 1063 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
OPERATING DATA REPORT DOCKET NO+ 50-388
'ATEt 03-08-93 COMPLETED BY: K.A. Youn TELEPHONE: 717 542-3251
~O
? gI gab Notes OPERATING STATUS
- 1. Unit Name: Sus uehanna Steam Electric Station Unit 2
- 2. Reporting Period: Februar 1993
- 3. Licensed Thermal Power(MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electrical Rating (Net MWe): 1050
- 6. Maximum Dependable Capacity (Gross MWe): 1082
- 7. Maximum Dependable Capacity (Net MWe): 1044
- 8. If Changes Occur in Capacity Ratings (Items Number Give Reasons:
3 Through 7) Since Last Report.
N A
- 9. Power Level To Which Re"tricted; 10.Reasons For Restrictions, If Any:
If Any N A (Not MWe): None This Month Yr<<to-Date Cumulative ll. Hours In Reporting Period
- 12. Number of Hrs Reactor Was Critical 672 547.9 1416 1291 '
70 536 58 529 '
- 13. Reactor Reserve Shutdown Hours 0 717 ~ 9
- 14. Hours Generator On-Line 526.1 1230.1 57 347.4
- 15. Unit Reserve Shutdown Hours 0 0
- 16. Gross Thermal Energy Generated(MWH) 1 686 028 3 944 333 181 936 792
- 17. Gross Electrical Energy Generated (MWH) 562 245 1 317 161 59 682 895
- 18. Net Electric Energy Generated (MWH) 540 600 1 268 386 57 435 700
- 19. Unit Service Factor 78.3 86.9 81 '
- 20. Unit Availability Factor 78.3 86.9 81.3
- 21. Unit Capacity Factor (Using MDC Net) 77.1 85.8 78.0
- 22. Unit Capacity Factor (Using DER Net) 76.6 85.3 77 ~ 6
- 23. Unit Forced Outage Rate 21.7 13. 1 5.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration o f Each)
- 25. If Shut Down At End
- 26. Units In Test Status of Report Period, Estimated Date of Startup:
(Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-388 UNIT NAME Two REPORT MONTH Januar 1993 DATE 03-08-93 COMPLETED BY K. A. Youn TELEPHONE 717 542-3251 METHOD OF CAUSE & CORRECTIVE SHUTTING LICENSEE ACTION TO TYPE'URATION DOWN EVENT SYSTEM 'OMPONENT PREVENT NO. DATE (HOURS) REASONS REACTOR~ REPORTg CODE CODE s RECURRENCE 2 930129 145.9 NA TL EXC Continuation of forced outage that commenced at 0758 hours0.00877 days <br />0.211 hours <br />0.00125 weeks <br />2.88419e-4 months <br /> January
- 30. (See January 1993 report for details). Generator exciter field ground was corrected at off-site repair facility. Component returned to site and re-installed.
Unit returned to service at 0153 hours0.00177 days <br />0.0425 hours <br />2.529762e-4 weeks <br />5.82165e-5 months <br /> February 7 and reached 100%
power at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> February 9.
F: Forced Reason: Method: G-InstructionsExhibit S: Scheduled A-Equipment Failure (Explain) 1-Manual for preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic S cram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Continuatio n 0161)
E-Operator Training & License Examination from previous month F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other Exhibit I-Same Source H-Other (Explain)
SUS UEHANNA STEAM ELECTRIC STATION Docket Number 50-388 Date: 03-8-93 Challen es to Main Steam Safet Relief Valves None.
Chan es to the Offsite Dose Calculation Manual None.
Ma'or Chan es to Radioactive Waste Treatment S stems None.
Page 2 of 2
0 0 P h'If 4