Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2
ML17157C244
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/28/1993
From: Keith Young
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML17157C243 List:
References
NUDOCS 9303190387
Download: ML17157C244 (10)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO+ 50-387 UNITt One DATEt 03-8-93 COMPLETED BY: K.A. Youn TELEPHONEt 717 542-3251

~O a~c s~

MONTH Februar 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (Mwe-Net) 1045 17 1049 1046 18 1049 1045 19 1050 1045 20 1049 1043 21 1046 1049 22 1046 1047 23 1047 1049 1048 1049 25 1048 10 1047 26 1047 1049 27 1046 12 1049 28 1046 13 1048 29 14 1048 30 15 1049 31 16 1048 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

,9303i90387 9303i6 PDR ADOCK 05000387 PDR R

OPERATING DATA REPORT DOCKET N09! 50-387 DATE! 03-08-93 COMPLETED BY: K.A. Youn GlZS

? gr gab'otes o

iO OPERATING STATUS

1. Unit Name: Sus uehanna Steam Electric Station Unit 1
2. Reporting Period: Februar 1992
3. Licensed Thermal Power(MWt): 3293.
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1050
6. Maximum Dependable Capacity (Gross MWe): 1078
7. Maximum Dependable Capacity (Net MWe)t 1040
8. If Changes Occur in Capacity Ratings (Items Number Give Reasons:

3 Through 7) Since Last Report.

1 None

9. Power Level To Which Restricted, 10.Reasons For Restrictions, If Any:

If Any N A (Net MWe): None This Month Yr-to-Date Cumulative 11 'ours In Reporting Period 672 1416 85 297

12. Number of Hrs Reactor Was Critical 672 1416 67 089.2
13. Reactor Reserve Shutdown Hours 0 1032
14. Hours Generator On-Line 672 1416 65 714 '
15. Unit Reserve Shutdown Hours 0 0
16. Gross Thermal Energy Generated(MWH) 2 207 254 4 639 784 206 437 449
17. Gross Electrical Energy Generated (MWH) 728 798 1 532 422 67 478 302
18. Net Electric Energy Generated (MWH) 703 775 1 480 525 64 846 314
19. Unit Service Factor 100 100 77 '
20. Unit Availability Factor 100 100 77.0
21. Unit Capacity Factor (Using MDC Net) 100 ' 100 ~ 5 73.1
22. Unit Capacity Factor (Using DER Net) 99 ' 99 6

~ 72.4

23. Unit Forced Outage Rate 0 7;4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If Shut Down At End
26. Units In Test Status of Report Period, Estimated Date of Startup:

(Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387 UNIT NAME One REPORT MONTH Februar 1993 DATE 03-08-93 COMPLETED BY K.A. Youn

~aC e>

CAUSE &

METHOD OF CORRECTIVE SHUTTING LICENSEE ACTION TO DURATION DOWN EVENT SYSTEM'OMPONENT PREVENT NO. DATE TYPE (HOURS) REASON REACTOR~ REPORTS CODE CODE RECURRENCE No report required.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for preparation. of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other Exhibit I-Same. Source H-Other (Explain)

SUS UEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date: 03-8-93 Completed by K. A. Youn Telephone: 717 542-3251 Challen es to Main Steam Safet Relief Valves ~"

None.

Chan es to the Offsite Dose Calculation Manual None.

Ma or Chan es to Radioactive Waste Treatment S stems None.

Page 2 of 2

'E AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ . 50-388 UNITs DATEt ,03-8-93 COMPLETED BY! K.A. Youn

~O are s~

MONTH Februar 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (Mwe-Net) 17 1064 18 1065 19 1065 20 1065 21 1064 22 1064 491 23 1065 955 24 1065 958 25 1064 10 1064 26 1063 1064 27 1063 12 1065 28 1063 13 1065 29 14 1063 30 15 1064 31 16 1063 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

OPERATING DATA REPORT DOCKET NO+ 50-388

'ATEt 03-08-93 COMPLETED BY: K.A. Youn TELEPHONE: 717 542-3251

~O

? gI gab Notes OPERATING STATUS

1. Unit Name: Sus uehanna Steam Electric Station Unit 2
2. Reporting Period: Februar 1993
3. Licensed Thermal Power(MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1050
6. Maximum Dependable Capacity (Gross MWe): 1082
7. Maximum Dependable Capacity (Net MWe): 1044
8. If Changes Occur in Capacity Ratings (Items Number Give Reasons:

3 Through 7) Since Last Report.

N A

9. Power Level To Which Re"tricted; 10.Reasons For Restrictions, If Any:

If Any N A (Not MWe): None This Month Yr<<to-Date Cumulative ll. Hours In Reporting Period

12. Number of Hrs Reactor Was Critical 672 547.9 1416 1291 '

70 536 58 529 '

13. Reactor Reserve Shutdown Hours 0 717 ~ 9
14. Hours Generator On-Line 526.1 1230.1 57 347.4
15. Unit Reserve Shutdown Hours 0 0
16. Gross Thermal Energy Generated(MWH) 1 686 028 3 944 333 181 936 792
17. Gross Electrical Energy Generated (MWH) 562 245 1 317 161 59 682 895
18. Net Electric Energy Generated (MWH) 540 600 1 268 386 57 435 700
19. Unit Service Factor 78.3 86.9 81 '
20. Unit Availability Factor 78.3 86.9 81.3
21. Unit Capacity Factor (Using MDC Net) 77.1 85.8 78.0
22. Unit Capacity Factor (Using DER Net) 76.6 85.3 77 ~ 6
23. Unit Forced Outage Rate 21.7 13. 1 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration o f Each)
25. If Shut Down At End
26. Units In Test Status of Report Period, Estimated Date of Startup:

(Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-388 UNIT NAME Two REPORT MONTH Januar 1993 DATE 03-08-93 COMPLETED BY K. A. Youn TELEPHONE 717 542-3251 METHOD OF CAUSE & CORRECTIVE SHUTTING LICENSEE ACTION TO TYPE'URATION DOWN EVENT SYSTEM 'OMPONENT PREVENT NO. DATE (HOURS) REASONS REACTOR~ REPORTg CODE CODE s RECURRENCE 2 930129 145.9 NA TL EXC Continuation of forced outage that commenced at 0758 hours0.00877 days <br />0.211 hours <br />0.00125 weeks <br />2.88419e-4 months <br /> January

30. (See January 1993 report for details). Generator exciter field ground was corrected at off-site repair facility. Component returned to site and re-installed.

Unit returned to service at 0153 hours0.00177 days <br />0.0425 hours <br />2.529762e-4 weeks <br />5.82165e-5 months <br /> February 7 and reached 100%

power at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> February 9.

F: Forced Reason: Method: G-InstructionsExhibit S: Scheduled A-Equipment Failure (Explain) 1-Manual for preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic S cram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Continuatio n 0161)

E-Operator Training & License Examination from previous month F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other Exhibit I-Same Source H-Other (Explain)

SUS UEHANNA STEAM ELECTRIC STATION Docket Number 50-388 Date: 03-8-93 Challen es to Main Steam Safet Relief Valves None.

Chan es to the Offsite Dose Calculation Manual None.

Ma'or Chan es to Radioactive Waste Treatment S stems None.

Page 2 of 2