AVERAGE DAILY UNIT POWER LEVEL DOCKET NO+

50-387 UNITt DATEt One 03-8-93 COMPLETED BY:

K.A. Youn

~O a~c s~

TELEPHONEt 717 542-3251 MONTH Februar 1993 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) 1045 17 1049 1046 18 1049 1045 19 1050 1045 20 1049 1043 21 1046 1049 1047 22 23 1046 1047 1049 1048 1049 25 1048 10 1047 26 1047 1049 27 1046 12 13 1049 1048 28 29 1046 14 1048 30 15 1049 31 16 1048 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

,9303i90387 9303i6 PDR ADOCK 05000387 PDR R

OPERATING DATA REPORT DOCKET N09!

50-387 DATE!

03-08-93 COMPLETED BY:

K.A. Youn GlZS oiO

? gr gab'otes OPERATING STATUS

1. Unit Name:

Sus uehanna Steam Electric Station Unit 1

2. Reporting Period:

Februar 1992

3. Licensed Thermal Power(MWt):

3293.

4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1050 6.

Maximum Dependable Capacity (Gross MWe):

1078

7. Maximum Dependable Capacity (Net MWe)t 1040
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.

Give Reasons:

1 None

9. Power Level To Which Restricted, If Any (Net MWe):

None 10.Reasons For Restrictions, If Any:

N A 11 'ours In Reporting Period

12. Number of Hrs Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated(MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electric Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled Over Next 6 Months This Month 672 672 0

672 0

2 207 254 728 798 703 775 100 100 100 '

99 '

0 (Type, Date and Yr-to-Date 1416 1416 1416 4 639 784 1 532 422 1 480 525 100 100 100

~ 5 99

~ 6 Duration of Cumulative 85 297 67 089.2 1032 65 714 '

0 206 437 449 67 478 302 64 846 314 77 '

77.0 73.1 72.4 7;4 Each)

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS

~aC e>

REPORT MONTH Februar 1993 DOCKET NO.

50-387 UNIT NAME One DATE 03-08-93 COMPLETED BY K.A. Youn NO.

DATE TYPE DURATION (HOURS)

REASON METHOD OF SHUTTING DOWN REACTOR~

LICENSEE EVENT REPORTS SYSTEM CODE 'OMPONENT CODE CAUSE CORRECTIVE ACTION TO PREVENT RECURRENCE No report required.

F: Forced S: Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training

& License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from previous month 5-Reduction 9-Other Exhibit G-Instructions for preparation. of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

Exhibit I-Same. Source

SUS UEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date:

03-8-93 Completed by K. A. Youn Telephone:

717 542-3251 Challen es to Main Steam Safet Relief Valves

~"

None.

Chan es to the Offsite Dose Calculation Manual None.

Ma or Chan es to Radioactive Waste Treatment S stems None.

Page 2 of 2

'E

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~.

50-388 UNITs DATEt

,03-8-93 COMPLETED BY! K.A. Youn

~O are s~

MONTH Februar 1993 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) 17 1064 18 1065 19 1065 20 1065 21 1064 22 1064 491 23 1065 955 24 1065 958 25 1064 10 1064 26 1063 1064 27 1063 12 1065 28 1063 13 1065 29 14 1063 30 15 1064 31 16 1063 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

OPERATING DATA REPORT DOCKET NO+

'ATEt COMPLETED BY:

TELEPHONE:

50-388 03-08-93 K.A. Youn 717 542-3251

~O

? gI gab Notes OPERATING STATUS

1. Unit Name:

Sus uehanna Steam Electric Station Unit 2

2. Reporting Period:

Februar 1993

3. Licensed Thermal Power(MWt):

3293

4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1050

6. Maximum Dependable Capacity (Gross MWe):

1082

7. Maximum Dependable Capacity (Net MWe):

1044

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.

Give Reasons:

N A

9. Power Level To Which Re"tricted; If Any (Not MWe):

None 10.Reasons For Restrictions, If Any:

N A This Month Yr<<to-Date Cumulative ll. Hours In Reporting Period 12.

Number of Hrs Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated(MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electric Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled Over Next 6 Months 672 547.9 0

526.1 0

1 686 028 562 245 540 600 78.3 78.3 77.1 76.6 21.7 (Type, Date and 1416 70 536 58 529 '

1291 '

717

~ 9 57 347.4 1230.1 0

3 944 333 1 317 161 1 268 386 86.9 181 936 792 59 682 895 57 435 700 81 '

86.9 85.8 81.3 78.0 77

~ 6 85.3

13. 1 5.6 Duration of Each)
25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Januar 1993 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-388 Two 03-08-93 K. A. Youn 717 542-3251 NO.

DATE TYPE'URATION (HOURS)

REASONS METHOD OF SHUTTING DOWN REACTOR~

LICENSEE EVENT REPORTg SYSTEM CODE 'OMPONENT CODE s

CAUSE

& CORRECTIVE ACTION TO PREVENT RECURRENCE 2

930129 145.9 NA TL EXC Continuation of forced outage that commenced at 0758 hours0.00877 days <br />0.211 hours <br />0.00125 weeks <br />2.88419e-4 months <br /> January 30.

(See January 1993 report for details).

Generator exciter field ground was corrected at off-site repair facility.

Component returned to site and re-installed.

Unit returned to service at 0153 hours0.00177 days <br />0.0425 hours <br />2.529762e-4 weeks <br />5.82165e-5 months <br /> February 7 and reached 100%

power at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> February 9.

F: Forced S: Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training

& License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

1-Manual 2-Manual Scram 3-Automatic S

4-Continuatio from previous month 5-Reduction 9-Other Exhibit I-Same Source G-InstructionsExhibit for preparation of Data Entry Sheets for Licensee cram Event Report (LER) File (NUREG n

0161)

SUS UEHANNA STEAM ELECTRIC STATION Docket Number 50-388 Date:

03-8-93 Challen es to Main Steam Safet Relief Valves None.

Chan es to the Offsite Dose Calculation Manual None.

Ma'or Chan es to Radioactive Waste Treatment S stems None.

Page 2 of 2