ML20044C274

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions
ML20044C274
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/31/1993
From: Keith Young
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML17157C243 List:
References
NUDOCS 9303190388
Download: ML20044C274 (2)


Text

.

UNIT SHUTDOWNS AND POWER REDUCTIONS phNNA p--

4 DOCKET NO.

50-388 g i dE,I t 'y UNIT NAME Two

$,E

~ d COMPLETED BY K.

A.

Younc lI i

REPORT MONTH January 1993 DATE 03-08-93 l

G TELEPHONE f7171 542-3251

' r,C ef

+

METHOD OF CAUSE & CORRECTIVE SHUTTING LICENSEE ACTION TO DURATION DOWN EVENT SYSTEM COMPONENT PREVENT NO.

DATE TYPE' (HOURS)

REASON REACTOR 1 REPORT #

CODE

  • CODE RECURRENCE 2

3 2

930129 F

145.9 A

1 NA TL EXC Continuation of forced outage that commenced at 0758 hours0.00877 days <br />0.211 hours <br />0.00125 weeks <br />2.88419e-4 months <br /> January 30.

(See January 1993 report for details). Generator exciter field ground was corrected at off-site repair facility. Component returned to site and re-installed.

Unit returned to service at 0153 hours0.00177 days <br />0.0425 hours <br />2.529762e-4 weeks <br />5.82165e-5 months <br /> February 7 and reached 100%

power at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> February 9.

l 4

J 4

F: Forced Reason:

Method:

G-InstructionsExhibit S Scheduled A-Equipment Failure (Explain) 1-Manual for preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5-Reduction 8

G-Operational Error (Explain) 9-Other Exhibit I-Same Source H-Other (Explain) 9303190388 930316 gDR ADOCK 05000387 l

PDR I

D

'*4 SUSOUEHANNA STEAM ELECTRIC STATION Docket Number 50-388 Dates 03-8-93 Completed by K.

A. Youno Telephone (717) 542-3251 Challences to Main Steam Safety Relief Valves None.

Chances to the Of fsite Dose Calculation Manual ll t

B None.

-i it da ior Chances to Radioactive Waste Treatment Systems

- None.

l i

't E

,t

'!'i!

r l:;

I T

I t

t t

I

I

-1

~!

'- Page'2 of 2'

'j f

(

\\

,-