PLA-2798, Monthly Operating Repts for Jan 1987

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1987
ML20211A282
Person / Time
Site: Susquehanna  
Issue date: 01/31/1987
From: Hirt J, Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2798, NUDOCS 8702190136
Download: ML20211A282 (9)


Text

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _.

AVERAGE DAILY UNIT POWER LEVEL

\\v

\\

D

\\

h DOCKET NO.

50-387 M

w LP

~%

Om UNIT g

(

DATI 02/03/87 RIC Si COMPLETED aY J.A. Hirt (717)542-3917 TELEPHONE

/

MONTH Jan11ary 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) iMWe Net) g 932 1044 37 1039 1040 2

g3 1041 3

g, 1042 1041 1043 4

,0

{

1041 1042 5

21 1042 1044 6

3 1041 1043 7

23 1040 1043 8

9 1036 23 1042 1040 1043 10 26 1036 1044 11 y

1036 1044 12

,3

~

1039 29 1043 13 1042 1041 14 3g 15 1041 16 1044 INSTRUCTIONS ge dady unit power levelin MWe. Net for each day in the reporting month. Compute to he neare t whole (9/77) 8702190136 870131 PDR ADOCK 05000337 R

PDR

N g&vl +

e 7

3 Z

__ 7 T-l_.

3 L N-1-

UCNJ OPERATING DATA REPORT DOCKET NO.

50-387 OpRIC Sih DATE 02/03/s/

COMPLETED BY J.A. Hirt TEllPHONE (717)b4Z-3917 OPERATING STAT S b

1. Unit Name:
2. Reporting Period:

Jan g 1987

3. Licensed Thermal Power (MWt):

3293

4. Nameplate Rating (Gross MWe):

1152 1065

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

1068 1032

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To which Restricted. If Any (Net MWe):

None

10. Reasons For Restrictions,If Any:

N/A

.1 This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744 744 32,017
12. Number Of Hours Reactor Was Critica]

744 744 22,931.5 0

0 812.7

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 744 744 22,358
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2,436.774 2,436,774 68.719.912
17. Gross Electrical Energy Generated (MWH) 801,496 801,496 22.389.034
18. Net Electrical Energy Generated (MWH) 772,055 772,035 21,447,084
19. Unit Service Factor 100.0 100.0 69.8
20. Unit Availability Factor 100.0 100.0 69.8
21. Unit Capacity Factor (Using MDC Net) 100.6 100.6 64.9
22. Unit Capacity Factor (Using DER Net) 97.4 97 4 62.9
23. Unit Forced Outage Rate 0.0 0.0 10,9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Eacht:

No shutdowns are scheduled.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status IPrior to Commercial Operation):

Forecast Achie$ed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION to/77)

t gANN4

.D 50-387 I

h UNIT SHUTDOWNS AND POWER REDUCI10NS DOCKET NO.

@f@ g R

UNIT NAME SSES - Unit One M

DATE 02/03/87 COMPLETED BY J.A. Hirt

  1. fC S REPORT MONTH.Tamnq 1987 TELEPHONE (7171542-3917 r.

E c

jg

}

}Yh Licensee

,E-r, je.,

Cause & Corrective N. i.

Date g

3g g

,j&

Event g '!

gO Action to

'8 d:

5 jgg Report a mo Prevent Recurrence 6-g I

d There were no~ shutdowns or significant power reductions experienced during January, 1987.

I 2

3 4*

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain)

I-Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5-Reduction 5

' Operational Error (Explain)

Exhibit I - Same Source N/77) 11-O:her (Explain) 9-0ther

SUSQUEHANNA STFJM ELECI'RIC STM' ION Docket Nunber 50-387 Date 02/03/87 3

Ccupleted by J.A. Hirt Telepham (717) 542-3917 Challenges to Main Stean Safety Relief Valves Nom Changes to the Offsite Dose Calmlation Manual Nom Major Changes to Radioactive Waste Treatment Systens Nom I

i 1

l

4 AVERAGE DAILY UNIT POWER LEVEL

\\v

\\

?

Q i

E DOCKET NO.

50-388 CO w

L7

~%

Two WIT k

E 2/03/87 g

ogi.E NJC Si COMPLETED BY J.A. Hirt TELEPHONE (717)542-3917 MONTH January, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net) g 1051 915 37 1052 1053 2

g 3

051 19 1053 050 4

20 1054

~

1052 5

21 1054 6

1052 1053

.n 1052 7

23 1045 8

1052 24 960 1052 1043 9

25 10 775 1054 26 0

1054 ig 0

1054 12

,3 1053 13 9

14 30 304 878 15 0

16 t

l INS 7RUCT10NS On th format, list the average dady unit power levelin MWe Net for each day in the reporting inonth. Compute to the nearest whole megawatt.

(9/77) l l

y

-gglr - +

l Y

Z,?_".

L ;"t UTJtJ OPERATING DATA REPORT o

DOCKET NO. 50-388 O

is DATE 02/03/87 NIC $Y COMPLETED BY

.T A Hi rt TEllPHONE (717)542-3917 OPERATING STATUS Unit %o Swehanna Stean Electric Station Notes

1. Unit Name:
2. Reporting Period:

January 1987

3. Licensed Thermal Power (MWt):

3293 1152

4. Nameplate Rating (Gross MWe):

1065

5. Design Electrical Rating (Net MWe):

1068

6. Maximum Dependable Capacity (Gross MWe):

1032

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:

None

9. Power Level To Which Restricted,If Any (Net MWe):

Nom

10. Reasons For Restrictions,if Any:

N/A This Month Yr..to.Date Cumulative

11. Hours In Reporting Period 744 744 17,256
12. Number Of Hours Reactor Was Critical 681.0 681.0 13,789
13. Reactor Reserve Shutdown Hours 0

0 717.9 645.3 645.3 13,374.6

14. Hours Generator On.Line
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH)

? n1(;,nna 2.016.004 41,408,889

17. Gross Electrical Energy Generated (MWH) 664 A06 664.506 13,568,800
18. Net Electrical Energy Generated (MWH) 640.023 640,023 l'3,042,552
19. Unit Service Factor 86.7 86.7 77.5
20. Unit Availability Factor 86.7 86.7 77.5
21. Unit Capacity Factor (Using MDC Net) 83.4 83.4 73.2 80.8 80.8 n.0
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 13.3 13.3 H-)
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:

No Shutdowns are scheduled

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed l

INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION l

l l

l (4/77i

'l 6 ANN 4 4

)N (y

)

m 5

50-388 5

UNIT SHUTDOWNS AND POWER REDUC 110NS DOCKET NO.

UNIT NAME SSES-Unit Two

$% @i DATE n'> /n 4 /R7

      1. C S REPORT MON 111 January 1987 COMPLETED BY J.A. Hirt TELEPHONE (717)542-3917 E

E jg 3

$I3 Licensee Eg K

Cause & Corrective h

Date g

gg

(

js&

Event gg g{

Action to f=

5 j;;jg Report a en U H

Prevent Recurrence c5 1

870111 F

98.7 A

2 87-001-00 IN ISV Unit 'No was shutdown fran 19% power on January 11, 1987, at 0154 hours0.00178 days <br />0.0428 hours <br />2.546296e-4 weeks <br />5.8597e-5 months <br />, in order to make a contairment entry to repair,the Reactor Building Chilled Water "B" Icop inboard isolation valve. The valve had _. _

failed to close during surveillance testing. The shutdown was rcquired to otrnply with Technical. Specificatiois section 3.6.3.a.

After the reactor was shutdown / cooled down maintenance personnel replaced the solenoid valve which controlled the isolation valve's pneunatic supply.

Unit 'No was restarted and synchroniz(d to the grid on January 15, 1987 at 0422 hours0.00488 days <br />0.117 hours <br />6.977513e-4 weeks <br />1.60571e-4 months <br />.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A-Equipment Failure (Exrun) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E Operator Training & Ucense Examination from previous month F-Administrative 5-Reduction 5

G-Operational Error (Explain)

Exhibit I - Same Source (9/77)

Il-Other (Explain) 9-Other

SUSQUEHARE STEAM FrHTRIC STATION Docket Ntznber 50-388 Date 02/03/87 Canpleted by: J.A.-Hirt Telephone:. (717) 542-3917 Challenges to Main'Stean Safety Refief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systans None i

l 1

PP&L Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 / 770 5151 Harold W. Keiser Submitted pursuant to Vice President-Nuclear Operations

-Technical Specifications 1 ', -

215/770-7502 Section.6.9.1.6 FEB 101987 Director, Data Automation &

Management Information Division Attention:

Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 PLA-2798 FILE R41-2A 50-388/NPF-22

Dear Mr. Beebe:

The January 1987 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours,

\\

LLO%

H. W. Keiser Vice President-Nuclear Operations Attachment cc: Document Control Desk (Original)

NRC Region 1 Mr. L. R. Plisco - NRC Resident Mr. M. C. Thadani - NRC Project Manager l ll