PLA-2595, Monthly Operating Repts for Jan 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1986
ML20141H540
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/31/1986
From: Keiser H, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2595, NUDOCS 8604240362
Download: ML20141H540 (9)


Text

- _- __ - ~ -- - - - _ -

@ AVERAGE D AILY UNIT POWER LEVEL' 3

i

(

D

?

W ," -ryr.,. 3 DOCKET NO. 50-387 L7 -h UNIT l

@ DATE 02/06/86 O i L.A. Kuczynski COMPLETED BY NIC 6 TELEPHONE -(717) 542-3759 JANUARY, 1986 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) ggwe. Net 3 1,045 1,040 1 37 )

1,042 ,g 1,040 2

3 19 .

608 1,033 4 :o 3

721 1,030 1,031 6 22 954 1,028 7 ,a _

]

1,044 1,022 3 ,4 1,043 638 9 23 10 26 1,001 3g 1,042 1,044 1,035 1,044 1,. :s j 13 1,039

,9 1,047 g4 1,043 1,045 1$

33 1,045 1,041 16 INSTRUCTIONS On this formatolist the average daily unit power levelin MWe. Net for each day in the repumng month. Compute to the nearest whole megawatt.

(9/77) 8604240362 860131 PDR ADOCK 05000387 R PDR 7

g i,\ \

ANN 4 S-

_ g i Q,y Q, _

._ p 7d _ .--- .__ ==

e,L-' .

uJ g

OPERATING DATA REPORT C DOCKETNO _50-387

' (. N D \TE _02/06/86 CO\tPLETED Bi _L.A. Kuczynski NIC 9 TELEPHONE (7171 542-3759 OPERATING STATLS Unit 1 .

SUSOUEHM?!A STF1N N m IC STATInN N"5

1. Unit Name:
2. Reporting Penod:

January, 1986 9

3. Licensed Thermal Power 45thti: .
4. Nameplate Rating (Gross 5ther 1152
5. Design Electrical Rating (Net .\lWe p: 1065 l
6. Staximum Dependable Capacity iGross Nthe): 1068 ,

7 Staximum Dependable Capacity (Net Sthel: 1032  ;

3. If Changes Occur in Capacity Ratings iltems Number 3 Thr sugh 7) Since Last Report. Gise Reasons:

NONE

9. Power Level To %hien Restricted. If Any INet Nthen N
10. Reasons For Restnettons. lf Any: NONE This .\lonth Yr .to Date Cumulaine 44 744 23,257
11. Hours in Reporting Penod
12. Number Of Hours Resctor Was Critical 744 744 16,735.2
13. Reactor Resene Shutdown Hours 0 0 710.6
14. Hours Generator On.Line 744 744 16,362.8

" U

15. Unit Resene Shutdown Hours 0
16. Gross Thermal Energy Generated (5tWHi 2.351.507 2.351.507 __49,938,832 I? Gross Electrical Energy Generated (5thHI 769,610 769,610 16,268,602 lb. Net Electrical Energy Generated t.\lhH) 741,116 741,116 15,585,854 19 Unit Service Factor 100.0 100.0 70.4
20. Unit bailability f actor 100.0 100.0 70 7 21 Unit Capacity Factor (Using NIDC Neti __ 96.5 96.5 64.9
. Umt Capacity Factor (Using DER Net) 93.5 93.5 62.9
23. Unit Forced Outage Rate 0.0 0.0 10.7
24. Shutdowns Scheduled 0$ct Nest 6 \lonths iType. Date, and Duration of Eaca i Refueling Outace; February 15, 1986; 94 days
25. If Shut Down At End Of Report Period. Estimated Date of Startup. M/A
26. Units in Test Status iPrior to Commercial Operationr Forecast gehies ed INITIA L CRITIC \LITY INITI AL ELECTRICITY CO\tNIERCIA L OPER A TION

{LO l 6

WphNNsq 4j Jr j $. ,b,'q f y ,

y m{ ,-! $ DOCKET NO. 50-387

  1. ' UNII SifU'IDOWNS AND POWER REDUCllONS UNIT NAME N

[

Y, 'O g 0 DATE A?/06/R6

'OfRic $ Ip\s REPORT MONTigJanuarv, 1986 COMPLETED BY L A Kne-nmcw TELEPHONE (71/ J 5-if-37s9 l -, jE #h k[ Litensee E-r,

  • o Cause & Corrective q h Date i 'i j 4 255 Event g'? g'3 Action to H jE 5 3 e 5 =5 Repint a mU o o

Prevent Recurrence O

i 1 860104 S 0 B 5 NA IIC XXXXXX Reactor power was reduced to 60% for condenser tube leak clocks. 'Ihe 'A' and 'B' condenser waterboxes were

! checked and a leal._Ig tube was found i in the 'A' waterbox of the high pres-

, sure condenser. The leaker and four surroundiry tubes were plugged.

? 860125 S 0 F 5 NA ZZ ZZZZZZ Power cMuction for control rod pattern adjustment.

l I

i i

l l

1 2 3 4 j F: Forced Reason: Method: Exhibit G -Instructions i'

S. Schaluted A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance or Test 2-Manual Scram- Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LE R) File (NURI G-D-Regulatory Restriction 4-Continuation 0161)

Loperator Training & License Examination from previous month F Admimstrative i G-Operational i rror il xplain) 5-Reduction Exhibit I - Same Source 19/77) 110 her (Esplaini 9-Other

UNIT 1 SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 02/06/86 Completed by L.A. Kuczynski Telechone (717) 542-3739 ,

Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manuel tbne Major Changes to Radioacti"e Waste Treatment Systerns None f

l 6

9

gANN4 , @j AVERAGE DAILV UNIT POWER LEVEL h "

7 DOCKET NO. 50-388

.- -\

UNIT M LP -M; g DATE 02/06/86 k '

COMPLETED BY L.A. Kuczynski NfC SY I TELEPHONE (717) 542-3759 i MONTH Janthuv, 1986 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i (MWe-Net) IMWe Net) I 1,051 0 37 1,050 ,

0 1,049 0 3 19 j

)

800 0 4 20 I 766 o 5 21 1 6

941 272 22 1,011 M 7 23 _

1,053 8

9 1,008

- 25 W l 1,051 to 26 1,050 1,051

,, 27 1,051 l 1

1,047 1,054 ]

14* 43 l

1,052 1,051 13 ,9 1,054 1,052 14 _

634 931

$ 31 0

16 l

INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

tw77)

%) ~

.'$ 9 ,' y Y T.-~ __ #.a L'- .:2 J OPERATING DATA REPORT Q DOCKET NO _50-388 DATE 02/06/86 h /?gg D [M C0\lPLETED BY L.A. Kuczynski TELEPHONE f7171 542-3759 OPERATING STATUS Unit 2 1

1. Unit Name: SM"N Etn'"' FI m P"io AP'ti m
2. Reporting Period: January. 1986
3. Licensed Thermal Power (MWtp: 3293
4. Nameplate Rating (Gross Sthe): 1152
5. Design Electrical Rating tNet SIWep: 1065
6. Staximum Dependable CJr2 city (Gross MWe): 1068
7. Maximum Dependable Capacity tNet MWe): 1032 S. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reasons:

NONE

9. Power Level To which Restricted. lf Any (Net MWe): NOE
10. Reasons For Restnctions. If Any: NONE This Month Ye to Date Cumulatne
11. Hours in Reporting Period 744 744 8,496
12. Number Of Hours Reactor Was Critical 650.6 650.6 7,771.8 1 .6
13. Reactor Resene Shutdown Hours 117.6 717.9
14. Hours Generator On.Line 585.6 585.6 7.580.7
15. Unit Resene Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated iMWH) 1,790,489 1,790,489 23,621,287 17 Gross Electrical Energy Generated tMWH) 590,360 590,360 7,803,160 b66,96i 566,96i /,521,277
18. Net Electrical Energy Generated IMWH)
19. . Unit Service Fmor 78.7 78.7 99.2
20. Unit Avaitaa lin Factor 78.7 __

78.7 89.2 21 Unit Capacity Factor IUsing MDC Nett 73.8 73.8 85.8

22. Unit Capacity Factor (Uung DER Net) 71.6 _ 71.6 83.1
23. Unit Forced Outage Rate 21.3 21.3 10.8
24. Shutdowns Scheduled Over Next 6 Months tType. Date, and Duration of Eaen r Refueling Outage; August 2, 1986; 84 days 25 If Snut Down At End Of Report Period. Estimated Date of Startup: U/A
26. Units in Test Status tPrior to Commercial Operation): Forecast A- .:d INIIIA L CRITICA Li1 Y INITIAL ELECTRICITY COMMERCIAL OPER ATION _

gor - 3

. p Af%g A , p.3 . : q 'D+ y y 1 7

p '

Ll' L DOCKET NO. 50-388 .-

UNIT SilUIDOWNS AND POWER REDUCilONS d UNil N AME E

$ DATE 02/06/86

$ NfC@M REPORT MONill J anu irv, 1986 COMPLETED BY I,.A.

TELEPHONE (7171 542-3759 Kuczynski e.

_ E E

-, 5g 'h j $~ 1.icensee ,E t, ft Cause & Corrective N. , Date r; ~g d 2~$ Event g g'? Attron to H y: 5  ;

~ g =g e

Repori e vi V u

o' Present Recurrence O

1 860104 S 0 F 5 NA "? ZZZZZZ Power reduction for a control rod sequence exchange, scram Line testing and repairs to a leaking relief valve on the reactor feed imp ' A' suction.

2 860115 F 137.7 A 2 NA EB TFc E F A ground fault on a Unit 2 transfonter cooling fan caused loss of control puer to both loops of cooling. The transformer heated causing a pressure relief device to actuate spraying oil over the transformer. The Unit was shut down to investigate the probican and check the condition of the trans-former.

3 860121 F 23.7 G 3 86-001 IB INSIRU Reactor ceram on low water level as a result of Operator not noticing the opening of a turbine bypass valve.

1 2 3 4 F: forced Reason: Method : Exhibit G - Instructions S. Scheduled A Equipment Failure (Explain) I-Manual for Pseparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for I.scensee C-Refueling 3-Automstic Scram. Event Report (1.ER) File INURI G-D R gulator) Restriction 4 Continuation 0161) 1 -Orerator Training & License Fxamination from previous month F Administralise G-Operational Error ilNplin t 5-Reduction Exhibit I- Same Source

,,,/77 ) ll oiher lE xplain) 9-Other

UNIT 2 SUSQUEllANNA STFAM ETECI'RIC STATION 3 Docket Number 50-388 Date 02/06/86 Cm pleted by L.A. Kuczynski Telephone (717) 542-3759 ,

Challenges to Main Steam Safety Relief Valves None Chames to the Offsite Dose Calculation bhnuel None bhjor Changes to Padioactive Waste Treatrent Systcm None t

S 9

o

..3

@ Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 / 770L5151 Harold W. Keiser Vice President-Nuclear Operations 215/770-7502 FEB 141986 Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch '

Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2595 50-388/NPF-22

Dear Mr. Beebe:

The January 1986 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, fria,g H. W. Keiser Vice President-Nuclear Operations Attachment cc: Dr. Thomas E. Murley Regional Administrator-Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Comnission Washington, D.C. 20555 Attn: Document Control Desk (12 copies)

Mr. R. H. Jacobs - NRC Ms. M. J. Campagnone - NRC Q

S ,

i i