PLA-2424, Monthly Operating Repts for Feb 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1985
ML20115B568
Person / Time
Site: Susquehanna  
Issue date: 02/28/1985
From: Kenyon B, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2424, NUDOCS 8504180071
Download: ML20115B568 (9)


Text

  • ,;

_N4 g

AVERAGE DAILY UNIT POWER LEVEL I

}

E 5

DOCKET NO.

50-387 L

NN UNIT One

  • e$ EB 8

S DATE March 11, 1985 4

Ric SY CourLE7ED sy L.A. Kuczynski TELEPHONE (717)542-3759 MONTH February, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe. Net) 859 I

17 0-2 851 gg o

3 850 19 0

4 846 20 0

5 839 0

21 838 6

22 0

832 0

7 23 8

681 24 0

9 0

3 o

10 0

0 26 11 0

27 0-0 0

i 12 28 13 0

29 0

14 30 0

15 3,

16 0

INSTRUCTIONS On this format, list the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/771 l

8504180071 850228 7

ADOCK0500g7 ff--

l DR

ANN 4 s

)

Z 3

L i+ --

IQ", J OPERATING DATA REPORT 0

DOCKET NO. 50-387 s

DATE March 11, 1985 QNIC si COMPLETED BY L.A. Kuczynski TELEPHONE L717) 542-3759 OPERATING STATUS Unit 1 Notes: Ctxmienced first refuel Susquehanna Steam Electric Station outage at 0146 on 2/9/85.

1. Unit Name:
2. Reporting Period:

February, 1985 3293

3. Licensed Thermal Power (MWt):
4. Name,) late Rating (Gross MWe):

1152 accurate EFPD data.

1065

5. Design Electrical Rating (Net MWe):
    • Values altered to reflect 1068
6. Maximum Dependable Capacity (Gross MWe):

station electrical use while 1032 unit is shutdown.

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted,If Any (Net MWe): None
10. Reasons For Restrictions,if Any:

None This Month Yr.-to.Date Cumulative 672 1,416 15,169

11. Hours In Repo ting Period 193.8 896 11,283.7
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

41.8 513.2

14. Hours Generator On.Line 193.8 883.9 11,030.8
15. Unit Reserve Shutdown Hours 0

0 0

  • 16. Gross Thermal Energy Generated (MWH) 515,552 2,529,543 33,158,531
    • 18. Net Electrical Energy Generated (MWil) 151,085

_ 823,150 10,813,660

17. Gross Electrical Energy Generated (MWH) 165,950 779,822 10,360,392
19. Unit Service Factor 28.8 62.4 72.7
20. Unit Availability Factor 28.8 62.4 72.7 21.8 53.4 66.2
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 21.1 51.7 64.1 0

5.8 13.4

23. Unit Forced Outage Rate

- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

25. If Shut Down At End Of Report Period. Estimated Date of Startup: June 1, 1985
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (4/77)

[

4,>

~

g,

\\T O

I

@l f

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387 UNIT NAME One E

o DATE March 11. 1985.

(O M

REPORT MONTH February, 1985 COMPLETED BY L.A. Kuczynski I4fC SY TELEPHONE (717)S42-3759 n.

E E

.!?

}

}I3 Licensee Eg ye.

Cause & Corrective No.

Date g-58 g

.g s &

Event gy o3 Action to fV F

$=

5 j di g Report a mV Prevent Recurrence d

2 850209 S

478.2 C

2 NA NA NA Manual scram to cmmence first refuel outage.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A-Ecuipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5-Reduction 5

G-Operational Error (Explain)

Exhibit I-Same Source (9/77) 11-O:her (Explain) 9-Other

I "..
et q

p, :.

UNIT 1 SUSQUEHANNA STEAM ELBCIRIC STATION.

Docket.No.- 50-387 i-Date' March 11, 1985 Cmpleted by. 5.A. Kuczynski

Telephone- (717)S42-3759 Challenges to Main Steam Safety Relief Valves None

~

Changes to the Offsite Dose Calculation Manual None

. Major Changes to Radioactive Waste Treatment Systens None 4

J 3

m y

L -.

AVERAGE DAILY UNIT POWER LEVEL Q

j tt)

E DOCKETNO. 50-388 t

UNIT TWo PPal DAH March 11, 1985

+

?ggg gi COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-3759 MONTH February, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWeNet)

(MW,. Net) 1 43 827 37 353 2

18 1053 3

849 1058 3,

4 1002 1058 20 1050 5

21 1057 1053 1057 6

22

~

7 1058 1053 23 8

1057 1051 24 1057 9

25 1058 10 1058 1059 26 Ig 1059 1059 y

  • 12 972 1059 28 13 1058 29 1059 14 30

~

15 1060 3g 16 611 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

  • Unit was decl& red ccxmorcial at 0001 on February 12, 1985.

(9/77)

ANN 4

~

{..i.$

i

/

7

.D 5

LA"--

AJ OPERATING DATA REPORT 0

DOCxET NO. 50-388 p

3 DATE March 11, 1985 OpNIC Sif COMPLETED BY L. A. Kuczynski TELEPHONE (717)542-3759 OPERATING STATUS Unit 2 Susquehanna Steam Electric Station Notes:

1. Unit Name:
2. Reporting Period:

February, 1985 Unit declared comnercial 3293 at 0001 on February 12, 1985.

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

1152 1065

5. Design Electrical Rating (Net MWe):

1068

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

1032

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Lan Report.Give Reasons:

None None

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions,If Any: None This Month Yr. to-Date Cumulative 408 408 408
11. Hours In Reporting Period 408 408 408
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 408 408 408
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1,293,749 1,293,749 1,293,749
17. Gross Electrical Energy Generated (MWH) 427,446 427,446 427,446
18. Net Electrical Energy Generated (MWH) 413,058 413,058 413,058 100 100 100
19. Unit Service Factor
20. Unit Availability Factor 100 100 100
21. Unit Capacity Factor (Using MDC Net) 98.1 98.1 98.1
22. Unit Capacity Factor (Using DER Net) 95.1 95.1 95.1 0

0 0

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date and Duration of Each):

E

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION (9/77 )

ANN 4 x

f b

ky DOCKET NO. 50-388 5

d UNIT SHUTDOWNS AND POWER REDUCTIONS R

UNIT NAME N g

M DATE March 11, 1985 COMPLETED BY L.A. Kuczynski I4K' N REPCRTMONTH Februarv 1985 TELEPHONE (717)S42-3759_

B e.

E E

,{ g 3

)Y3 Licensee

,Ev, gn, Cause & Corrective N..

Date g

3m

(

y$

Event g'g pU Action to H

$=

5 j iji g Report a mo Prevent Recurrence g

a 5

850216 F

O A

5 NA HC/CB IfIEXCH/

Power reduction'to repair main conden-GENERA ser water box 'B' tube leaks and change-out the reactor recirculation motor-generator setA' brushes.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain)

1. Manual for Preparation of Data B-Maintenance of Test 2-Mancal Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination fro" previous month F-Adrr inistrative 5-Reduction 5

G-Operational Esrur (Explain)

Exhibit I-Same Source (9/77)

Il4)ther (Explain) 9-Other

C

.. 19~ c : ~

UNIT 2 SUSQUEHAME STEAM ELECTRIC STATION Docket No.

50-388' Date March 11, 1985 Cm pleted by L.A. Kuczynski

. Telephone (717)542-3759 Challenges to Main Steam Safety Relief \\'lves None Changes to the Offsite' Dose Calculation Manual None Major Changes.to Radioactive Waste Treatment Systens None k _

PP&L Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 I 770 5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 MAR 141985 Director, Data Automation &

Management Information Division Attention:

Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2424 50-388/NPF-22

Dear Mr. Beebe:

The February 1985 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly.yours,

~

h-

. D. Kenyon Vice President-Nuclear Operations Attachment cc:

Dr. Thomas E. Murley Regional Administrator-Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn: Document Control Desk (12 copies)

Mr. R. H. Jacobs - NRC Ms. M. J. Campagnone - NRC f62-Y l

W