_N4 g
AVERAGE DAILY UNIT POWER LEVEL I
}
E 5
DOCKET NO.
50-387 L
NN UNIT One
- e$ EB 8
S DATE March 11, 1985 4
Ric SY CourLE7ED sy L.A. Kuczynski TELEPHONE (717)542-3759 MONTH February, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe. Net) 859 I
17 0-2 851 gg o
3 850 19 0
4 846 20 0
5 839 0
21 838 6
22 0
832 0
7 23 8
681 24 0
9 0
3 o
10 0
0 26 11 0
27 0-0 0
i 12 28 13 0
29 0
14 30 0
15 3,
16 0
INSTRUCTIONS On this format, list the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/771 l
8504180071 850228 7
ADOCK0500g7 ff--
l DR
ANN 4 s
)
Z 3
L i+ --
IQ", J OPERATING DATA REPORT 0
DOCKET NO. 50-387 s
DATE March 11, 1985 QNIC si COMPLETED BY L.A. Kuczynski TELEPHONE L717) 542-3759 OPERATING STATUS Unit 1 Notes: Ctxmienced first refuel Susquehanna Steam Electric Station outage at 0146 on 2/9/85.
- 1. Unit Name:
- 2. Reporting Period:
February, 1985 3293
- 3. Licensed Thermal Power (MWt):
- 4. Name,) late Rating (Gross MWe):
1152 accurate EFPD data.
1065
- 5. Design Electrical Rating (Net MWe):
- Values altered to reflect 1068
- 6. Maximum Dependable Capacity (Gross MWe):
station electrical use while 1032 unit is shutdown.
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted,If Any (Net MWe): None
- 10. Reasons For Restrictions,if Any:
None This Month Yr.-to.Date Cumulative 672 1,416 15,169
- 11. Hours In Repo ting Period 193.8 896 11,283.7
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
41.8 513.2
- 14. Hours Generator On.Line 193.8 883.9 11,030.8
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 515,552 2,529,543 33,158,531
- 18. Net Electrical Energy Generated (MWil) 151,085
_ 823,150 10,813,660
- 17. Gross Electrical Energy Generated (MWH) 165,950 779,822 10,360,392
- 19. Unit Service Factor 28.8 62.4 72.7
- 20. Unit Availability Factor 28.8 62.4 72.7 21.8 53.4 66.2
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 21.1 51.7 64.1 0
5.8 13.4
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: June 1, 1985
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (4/77)
[
4,>
~
g,
\\T O
I
@l f
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387 UNIT NAME One E
o DATE March 11. 1985.
(O M
REPORT MONTH February, 1985 COMPLETED BY L.A. Kuczynski I4fC SY TELEPHONE (717)S42-3759 n.
E E
.!?
}
}I3 Licensee Eg ye.
Cause & Corrective No.
Date g-58 g
.g s &
Event gy o3 Action to fV F
$=
5 j di g Report a mV Prevent Recurrence d
2 850209 S
478.2 C
2 NA NA NA Manual scram to cmmence first refuel outage.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A-Ecuipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)
E-Operator Training & License Examination from previous month F-Administrative 5-Reduction 5
G-Operational Error (Explain)
Exhibit I-Same Source (9/77) 11-O:her (Explain) 9-Other
- I "..
- et q
p, :.
UNIT 1 SUSQUEHANNA STEAM ELBCIRIC STATION.
Docket.No.- 50-387 i-Date' March 11, 1985 Cmpleted by. 5.A. Kuczynski
- Telephone- (717)S42-3759 Challenges to Main Steam Safety Relief Valves None
~
Changes to the Offsite Dose Calculation Manual None
. Major Changes to Radioactive Waste Treatment Systens None 4
J 3
m y
L -.
AVERAGE DAILY UNIT POWER LEVEL Q
j tt)
E DOCKETNO. 50-388 t
UNIT TWo PPal DAH March 11, 1985
+
?ggg gi COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-3759 MONTH February, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWeNet)
(MW,. Net) 1 43 827 37 353 2
18 1053 3
849 1058 3,
4 1002 1058 20 1050 5
21 1057 1053 1057 6
22
~
7 1058 1053 23 8
1057 1051 24 1057 9
25 1058 10 1058 1059 26 Ig 1059 1059 y
- 12 972 1059 28 13 1058 29 1059 14 30
~
15 1060 3g 16 611 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
- Unit was decl& red ccxmorcial at 0001 on February 12, 1985.
(9/77)
ANN 4
~
{..i.$
i
/
7
.D 5
LA"--
AJ OPERATING DATA REPORT 0
DOCxET NO. 50-388 p
3 DATE March 11, 1985 OpNIC Sif COMPLETED BY L. A. Kuczynski TELEPHONE (717)542-3759 OPERATING STATUS Unit 2 Susquehanna Steam Electric Station Notes:
- 1. Unit Name:
- 2. Reporting Period:
February, 1985 Unit declared comnercial 3293 at 0001 on February 12, 1985.
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
1152 1065
- 5. Design Electrical Rating (Net MWe):
1068
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1032
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Lan Report.Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions,If Any: None This Month Yr. to-Date Cumulative 408 408 408
- 11. Hours In Reporting Period 408 408 408
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 408 408 408
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1,293,749 1,293,749 1,293,749
- 17. Gross Electrical Energy Generated (MWH) 427,446 427,446 427,446
- 18. Net Electrical Energy Generated (MWH) 413,058 413,058 413,058 100 100 100
- 19. Unit Service Factor
- 20. Unit Availability Factor 100 100 100
- 21. Unit Capacity Factor (Using MDC Net) 98.1 98.1 98.1
- 22. Unit Capacity Factor (Using DER Net) 95.1 95.1 95.1 0
0 0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date and Duration of Each):
E
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION (9/77 )
ANN 4 x
f b
ky DOCKET NO. 50-388 5
d UNIT SHUTDOWNS AND POWER REDUCTIONS R
UNIT NAME N g
M DATE March 11, 1985 COMPLETED BY L.A. Kuczynski I4K' N REPCRTMONTH Februarv 1985 TELEPHONE (717)S42-3759_
B e.
E E
,{ g 3
)Y3 Licensee
,Ev, gn, Cause & Corrective N..
Date g
3m
(
y$
Event g'g pU Action to H
$=
5 j iji g Report a mo Prevent Recurrence g
a 5
850216 F
O A
5 NA HC/CB IfIEXCH/
Power reduction'to repair main conden-GENERA ser water box 'B' tube leaks and change-out the reactor recirculation motor-generator setA' brushes.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain)
- 1. Manual for Preparation of Data B-Maintenance of Test 2-Mancal Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction 4 Continuation 0161)
E-Operator Training & License Examination fro" previous month F-Adrr inistrative 5-Reduction 5
G-Operational Esrur (Explain)
Exhibit I-Same Source (9/77)
Il4)ther (Explain) 9-Other
C
.. 19~ c : ~
UNIT 2 SUSQUEHAME STEAM ELECTRIC STATION Docket No.
50-388' Date March 11, 1985 Cm pleted by L.A. Kuczynski
. Telephone (717)542-3759 Challenges to Main Steam Safety Relief \\'lves None Changes to the Offsite' Dose Calculation Manual None Major Changes.to Radioactive Waste Treatment Systens None k _
PP&L Pennsylvania Power & Light Company Two North Ninth Street
- Allentown, PA 18101
- 215 I 770 5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 MAR 141985 Director, Data Automation &
Management Information Division Attention:
Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.
20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2424 50-388/NPF-22
Dear Mr. Beebe:
The February 1985 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.
Very truly.yours,
~
h-
. D. Kenyon Vice President-Nuclear Operations Attachment cc:
Dr. Thomas E. Murley Regional Administrator-Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn: Document Control Desk (12 copies)
Mr. R. H. Jacobs - NRC Ms. M. J. Campagnone - NRC f62-Y l
W