PLA-2701, Monthly Operating Rept for Jul 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1986
ML20215C571
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/31/1986
From: Keiser H, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2701, NUDOCS 8610100346
Download: ML20215C571 (9)


Text

- _-_- ________

N n 4 @y AVERAGE DAILY UNIT POWER LEVEL

.' \ )'\ DOCKET NO, 50-387 p g 0"*

UNIT

$ g & (

DATE 8-6-86 L.A.Kuczynski RIC Si COMPLETED BY TELEPHONE (717)S42-3759 MOffTyg Julv 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) 1MWe%cl i 1,032 17 1 n?a 2 1,025 1,014 18 3 1,029 1,013 39 .

4 1,030 20 1,014 5

716 1,018 23 6 on? 1,025 22 7 1 014 1,022 23 _

8 1,010 1,021 24 9

1,020 23 1,020 10 1,030 1,018

~

26 1,030 ll 2 1,017 12 1.023 ;g 1,019 33 1,016 1,018 29 14 1.n95 1 n97 30 15 1,030 1,027 3

16 1,031 INSTRUCTIONS On this format !ist the average daily unit power level in MWe Net for each day in the repumng month. Compute to the nearest whole megawatt.

l (9/77) 8610100346 860731 PDR ADOCK 05000387 9e'~

R PDR s' t /

^

i, ,

lS& .4 Qf 4-

- 'Q.A Y

^

m ==

T... K t 't___ _ .

OPERATING DATA REPORT O \ DOCKET NO. 50-387 O 4 DATE A-6-A6 hic SY COMPLETED BY TELEPHONE (717)542Dbi n vim OPERATING STATUS Unit 1

1. Unit Name: Susauehanna Steam Electric Station b0l'8
2. Reporting Period: July 1986
3. Licensed Thermal Power IMWt p: m,  !

I

4. Nameplate Rating IGross MWep: 11m
5. Design Electrical Rating (Net MWe p: inns
6. Maximum Dependable Capacity (Gross MWe): 1068
7. Maximum Dependable Capacity (Net MWel: 1032 l
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. lf Any (Net MWe): None
10. Reasons For Restrictions,if Any: None

. This Month Yr. to.Date Cumulatise iI. Hours In Reporting Period 744 s nn7 27,600

12. Number Of Hours Reactor Was Critical 744 2.931.9 18.923.1
13. Reactor Reserve Shutdown Hours 0 102.1 812.7
14. Hours Generator On.Line 744 2,791.8 in a1n 6
15. Unit Reserve Shutdown Hours 0 0 o
16. Gross Thermal Energy Generated (MWH) 2,407,031 .B_,f 74 ,169 56.261.494
17. Gross Electrical Energy Generated (MWH) 777,958 9 n37_399 1 a .191.1 n4
18. Net Electrical Energy Generated (MWH) 7sn.?7n M 85.596 17.530.334
19. Unit Service Factor ino.On 54.9 66.7
20. Unit Asat*ointy Factor 100.00 _,._, 5 4 . 9 66.7
21. Unit Capacity Factor IUsing MDC Net) 97.7 _ 51.2 61.6
22. Unit Capacity Factor (Using DER Net) 94.7 49.6 59.6
23. Unit Forced Outage Rate 0.0 to.6 12.6
24. Shutdowns Scheduled Over Next 6 Months tType. Date,and Duration of Eaen r None
25. If Siiut Down At End Of Report Period. Estimated Date of Startup: N/a
26. Units in Test Status iPrior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION g, q

gANN4 , .

]

g l h .

9 ' t . ;. $ '

th' TiiIiri' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387 ,

UNIT NAME nw g(, P

8-6-86 DATE L.A. Kuczynski pC'7.NIC M REPORT MONTH July- 14R6 . COMPLETED BY l

TELEPHONE (717)542;-3759 w.

. - E E

, 5_ E 3 yY3 Licensee ,Eg , Cause & Corrective No. Date c. 3g s jg5 Event g7 l"3 gU Action to H

$5 5 j di g Reptnt #

mU g Prevent Recurrence d

8 860705 S 0 F 5 N/A ZZ ZZZZZZ Power reduction for control rod sequence exchange. MSIV stroke time testing also completed.

1 i

i i 1 2 3 4 F: Forced Reason: Method: Exhibit G - Inst ructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee -

C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5-Reduction 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) iI-Other (Explain) 9-0ther l

i

4

+

UNIT 1

.SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 8-6-86 Completed by L.A. Kuczynski Telephone (717) 542-3759 Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None

N 4 @j AVERAGE DAILY UNIT POWER LEVEL

@ \%

DOCKET NO.58-388 g UNIT Po

$ g DATE 8-6-86 D 4 klC SY COMPLETED sy L.A. xuezynski TELEPHONE -(717)S42-3759 MO M July 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net)

I 887 17 548 2 876 0 g3 3 873 g9 0 ,

4 868 20 3 684 21 6 857 22 410 7 830 gg, 23 _

8 796 776 24 9 823 7 74 25 10 826 26 770 l! 797 767 27 12 472 762

s 13 496 756 39 34 667 753 30 15 833 3, 747 16 96 INS 1RUCT10NS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.

(9/77) 9 b

V ,

1

. j ^~ f. ~$ Y Df I

-6 cr>  %

p. _ . mj OPERATING DATA REPORT PPtL \

f DOCKET NO. 50-188 DATE n c n^

yI y COMPLETED BY r a vnc2 nski l TELEPHONE (717)S42- 759 OPERATING STATUS Unit 2 Susquehanna Steam Electric Station Notes Unit is in coastdown

1. Unit Name:
2. Reporting Period: .Tnly 1996 Prior to refueling.  ;
3. Licensed Thermal Power iMW:): 3293 Coastdown began on i
4. Nameplate Rating (Gross MWe1: 1152 May 9, 1986
5. Design Electrical Rating (Net MWel: 1065
6. Maximum Dependable Capacity (Gross MWel: - inAn
7. Maximum Dependable Capacity (Net MWel: in19 l
8. If Changes Occur in Capacity Ratings titems Number 3 Through 7)Since Last Report.Give Reasons:

None

9. Power Level To Which Restricted. lf Any (Net MWep: Mnna
10. Reasons For Restrictions,if Any: "nna This Month Yr..to.Date Cumulatise
11. Hours In Reporting Period 744 5,087 12,839
12. Number Of Hours Reactor Was Critical M g .1 4,314 11,435.2
13. Reactor Reserve Shutdown Hours 0 133.6 717.9
14. Hours Generator On.Line 637.6 4,201.6 11,196.7
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,608,845 12,829,982 34,860,780 17 Gross Electrical Energy Generated lMWH) 509,494 4,205,628 11,418,428
18. Net Electrical Energy Generated (MWH) 485.229 4,040,611 10,994,921
19. Unit Service Factor As 7 82.6 87.2
20. Unit A$ailability Factor A5.7 82.6 87.2
21. Unit Capacity Factor (Using MDC Nett 63.2 77 83
22. Unit Capacity Factor (Using DER Nett 61.2 ,_ 74.6 80.4
23. Unit Forced Outage Rate 14.3 17.4 12.8
24. Shutdowns Scheduled Over Next 6 Months tType. Date and Duration of Ea6 r Refueling Outage, August 9, 1986 ; 84 days
25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Umts in Test Status (Prior to Commercial Operation): Forecast Achie$ed INITIA L CRITICA LITY INITIAL ELECTRICITY _

COMMERCIAL OPERATION p->

l

  1. ^""4 ss . l
Si;',
'l . ejy 9 J.... $ =

L UNIT SHU4 DOWNS AND POWER REDUCTIONS DOCKET NO. 50-388 Two f@ ,

G UNIT NAME 8-6-86 DATE g IC M REPORT MONTH July, 1986 COMPLETED BY L A. Kuczynski TELEPHONE (717)542-3759 e

r

=_ .. 5 c

No~ Ibte E. 5 75bx * * ' A I' " ' I

g 3.5 3 .j Event gg gO8 Action to oO 2 5 3d;i j Repint it in U g Prevent Recurrence c3 l

6 860712 F 0 A 5 N/A CE VAL 70P Power reduction to facilitate maintenance on RCIC injection valve p

due to ALARA concerns. -

7 860717 F 106.4 A 2 86-010 CF VALVEX Controlled shutdown due to reactor coolant unidentified leakage exceeding 5 gpm. The packing of RHR loop "B" testable check valve had failed and was replaced. Also, an LLRT was performed on the RCIC l

injection valve.

1 I

! 1 2 3 4 l F: Forced Reason: Method:

S: Scheduled Exhibit G - Inst ructions A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for 1.icensee C Refueling 3-Automatic Scram. Event Report (LE R) File (NUREG-D Regulatory Restriction 4 Continuation 0161)

EOperator Training & License Examination from previous month F Administrative 5 G-Operational Error iExplain) 5-Reduction Exhibit I . Same Source (9/77) Il Other (Expla n) 9-Other

.c.

. e, .

. UNIT 2 SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-388 Date 8-6-86 Completed by L.A. Kuczynski Telephone (717) 542-3759 Challenges to Main- Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None

. f ?.

Q ' Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 / 770 5151 Harold W. Keiser Vice President-Nuclear Operations 215/770-7502 AUS 1119$

Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe

-Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 PLA-2701 FILE R41-2A 50-388/NPF-22

Dear Mr. Beebe:

The July 1986 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, M

H. W. Keiser Vice President-Nuclear Operations Attachment cc: Dr. Thomas E. Murley Regional Administrator-Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk (12 copies)

Mr. L. R. Plisco - NRC Ms. M. J. Campagnone - NRC p

N