PLA-2371, Monthly Operating Repts for Nov 1984

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1984
ML20113B552
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/30/1984
From: Kenyon B, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2371, NUDOCS 8501220027
Download: ML20113B552 (9)


Text

.*

AVERAGE DAILY UNIT POWER LEVEL 2

7)

M%

3 DOCKET NO. 50-387 L- "" 4 UNIT One

< 0 DATE 12/04/84 hRic 5@ COMPLETED BY L.A. Kuczynski TELEPHONE 717-542-3759 MON November, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net)

I 914 17 980 2 1,044 33 891 3 850 g, 1,053 _

4 1,014 1,056

. 20 5

1,048 1,051 21 6 1,051 1,052 22 7 1.049 23 1,053 -.

,a 1,048 997 24 9 1,037 1,020 25 10 1,010 1,053 26 II 845 27 1,035 12 1,044 1,043 28 13 1,050 1,053 29 14 1,053 1,051 30 15 1,050 3, 16 1,048 INSTRUCTIONS On this format, list the average daily unit power levelia MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 8501220027 841130 PDR ADOCK 05000387 R PDR gh r

\ \

i

9 y

9 8%

-2 LM CZJ OPERATING DATA REPORT O DOCKET NO. 50-387 DATE 12/04/84 OpNIC SIfg COMPLETED BY L. A. Kuczynski TELEPHONE 717-542-3759 OPERATING j TATUS Unit 1 Susquehanna Steam Elecrtric Station Notes

1. Unit Name:
2. Reporting Period: November, 1984
3. Licensed Thermal Power (MWt): 3,293
4. Nameplate Rating (Gross MWe): 1.152
5. Design Electrical Rating (Net MWe): 1.065
6. Maximum Dependable Capacity (Gross MWe): 1,068
7. Maximum Dependable Capacity (Net MWe): 1.032
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None.

9. Power Level To Which Restricted,If Any (Net MWe): None.
10. Reasons For Restrictions.If Any: None.

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 720 8,040 13,009
12. Number Of Hours Reactor Was Critical 720 5,920.3 9,765.6
13. Reactor Reserve Shutdown Hours 0 314.7 471.4
14. Hours Generator On-Line 720 5,763.7 9,532
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 2,307,003 17,468,315 28,729,976
17. Gross Electrical Energy Generated (MWH) 760.610 5,699,700 _ 9,366,250  ;
18. Net Electrical Energy Generated (MWH) 733.039 5,487,095 '9,023,468
19. Unit Service Factor 100 71.7 73 3
20. Unit Availability Factor 100 71.7 73 3
21. Unit Capacity Factor (Using MDC Net) 98.6 66.1 _

67.2

22. Unit Capacity Factor (Using DER Net) 95.6 64.1 65 1
23. Unit Forced Outage Rate 0 14.9 13.7
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Refueling Outage; February 9, 1985; 15 weeks.

I

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA l
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l (0/77 )

I

l 2

  1. >" 74 S 9' >f4 e O CfJ .,4

~ i rCj 9 4 S W

-y' l'T=,L,k

  • C.5H m2Cb0Ezu >zc ogm* =mCc ozm gH zO. moaWwM 9 3 =, g c3H *jm oum 4 O C#wm ~ soc \ma yA F.>e eon <smX.

4,Y% O r.T A zm3=H gozHZ 5<@ mm,* _4N*

O gghgC e4  :

- t Me" zm N wlwDNeWmm@

m 3

r t f o n n) 3-n ogt n c CRnMa m4 e5 n e OEE > Q ,E .$

r l

e ios r o di a e e e o z_ - 2E p t a u s ot t m<@- ts d p d

> 2 N 2' y r o a h uR yo o T uH e SC mC 70E~

D( R teh n MS w fnE~ 4 C

o .

r53n o

D O

z0zm

- ,, w A 3 m 5o - z2 8" E g'"8 .-- m4E= ? g k=.g*

" mnTo.c.,c.

E g ~ gacn m* 7qUu 8 5 oo~w tiE E"X n 5 l 2 e ;.~'! 2=Ea ~m4.

' .I

YgseEmQ=5- mEQ mk~ p, C
co3nO okn ce5 'f>Esg 8 mn;; ? m#E z5$
  • t*S 3, zCNmo*

o ha" 1 c_E* f n:.2 C*.

n s .

' no':C oCse u Om o *.

[5gc o3 (*noy eE::=E:.$ i

+'

- @ O1m<

t" OCm BO3c3 mp2" n c. 5'a

- i: .*EE2

  • kmc.g$ Oo m

c63E8E1"L, x m* .sE e - mEh= ? T5oM e,Q

  • 6+csq

^4d. =6 TZ m ~3 5. .

! UNIT 1 SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 12/04/84 Completed by L.A. Kuczynski Telephone 717-542-3759

. Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual

.None

. Major Changes to Radioactive Waste Treatment Systems he 1

I-J

. - , _ - - . . _ . ,_ =_

AVERAGE DAILY UNIT POWER LEVEL D /

C/) . . . . , 3 DOCKET NO. 50-388 L. "% UNIT Two PPsL 0 DATE 12/04/84 0 7g gh COMPLETED BY L.A. Kuczynski TELEPHONE 717-542-3759 MONTH November. 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 1 0 g7 o 2 18 3 19 -

4 20 5 21 6 22 7 23 -

8 24 9 25 10 26 11 27 12 28 13 29 14 30 \/

15 31 16 INSTRUC110NS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

k

. 6 s 8R L N-- - - CU*, J , OPERATING DATA REPORT N PPat N o DOCKET NO. 50-388 DATE 12/04/84 C s@4s COMPLETED BY TELEPHONE 717-542-3759 L.A. Kuczynski OPERATING STATUS Unit 2 Notes

1. Unit Name: Susquehanna Steam Electric Station
2. Reporting Period:

November, 1984

3. Licensed Thermal Power (MWt): 3.293
4. Nameplate Rating (Gross MWe): 1.152
5. Design Electrical Rating (Net MWe): 1.065 ,

, 6. Maximum Dependable Capacity (Gross MWe):

7. Maximum Dependable Capacity (Net MWe):
  • To be determined.
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None

9. Power Level To Which Restricted,If Any (Net MWe): None
10. Reasons For Restrictions. lf Any: None This Month Yr.-to-Date Cumulative .
11. Hours In Reporting Period 720 3.612 3.612
12. Number Of Hours Reactor Was Critical 0 2,145.9 2,145.9
13. Reactor Reserve Shutdown Hours 0 495 495
14. Hours Generator On-Line 0 1,769 3 1,769.3
15. Unit Reserve Shutdown Hours 0 142.4 142.4
16. Gross Thermal Energy Generated (MWH) 0 3,227,193 3,227,193
17. Gross Electrical Energy Generated (MWH) 0 989.040 989,040
18. Net Electrical Energy Generated (MWH) 0 932,026 932,026 NA NA NA
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)

~22. Unit Capacity Factor (Using DER Net)

23. Unit Forced Outage Rate V V v-
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: December 26. 1984.
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 05/09/84 05/08/84 INITIAL ELECTRICITY 06/28/84 07/03/84 COMMERCIAL OPERATION 01/31/85 (4/77 )

4 O I h .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-388 4

Yf U f o

UNIT NAME Two DATE 12/04/84 4 COMPLETED BY L.A. Kuczynski klC Mp REPORT MONTH November. 1984 TELEPHONE 717-542-3759

- E c

-, 5E 3 Licensee E e, gn, Cause & Corrective No. Date o- 3g @ ) .Y{$ 5 Event g? g3U Action to H

$2 5 jgg Report a mV g Prevent Recurrence a

16 841d27 S 720 B 3 NA NA NA Reactor scram as part of scheduled Startup Testing. Pre-commercial outage commenced. .

4 I 2 3 4 F: . Forced Reason- Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual foc Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5 G-Operational Error (Explain) 5-Reduction Exhibit 1 - Same Source -

(9/77) Il-Other (Explain) 9-Other

}g L . :.:l ~ .

<e*...

1:.

UNIT 2

'SUSQUEHANNA STEAM ELECTRIC STATION Docket- Number 50-388 ' Date 12/04/84 Completed by L. A. Kuczynski Telephone 717-542-3759 Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual-None Major Changes to Radioactive W' aste Treatment Systems None l'

l

.p '

I PPaL Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 / 770-5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 DEC 101984 .

Director, Data Automation &

Management Information Division Attention: ,,r. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2371 50-388/NPF-22

Dear Mr. Beebe:

The November 1984 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very trul yours, D>/ \

D v dtA.ON' B. D. Kenyon (

Vice President-Nuclear Operations Attachment

, :cc: Dr. Thomas E. Murley INFO Records Center

. Regional Administrator-Region I Suite 1500 U.S. Nuclear Regulatory Commission 1100 Circle 75 Parkway 631 Park Avenue Atlanta, Georgia 30339 King of Prussia, PA 19406 Director Mr. Thomas E. Pollog Office of Inspection and Enforcement Department of Environmental-U.S. Nuclear Regulatory Commission Resources Washington, D.C. 20555 .

Bureau of Radiation Protection Attn: Document Control Desh (12 copies) P.O. Box 2063 Harrisburg, PA 17120-Mr. R. H. Jacobs - NRC Ms. M. J. Campagnone - NRC -

j?N