PLA-2810, Monthly Operating Repts for Feb 1987

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1987
ML20207S239
Person / Time
Site: Susquehanna  
Issue date: 02/28/1987
From: Keiser H, Ryder T
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2810, NUDOCS 8703190177
Download: ML20207S239 (9)


Text

a pANN4 AVERAGE DAILY UNIT POWER LEVEL EA o

7

.D j

m E

DOCKET NO.

50-387 Tm 4 UNIT One t-O 03/05/87

(+Op DATE T.S. Ryder COMPLETED BY (717)S42-3235 TELEPHONE Febnnry,1987 MONng DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 17 1042-I 1nal 1040 1042 2

1041 3

1042 19 4

1043 1036 20 1043 5

21 inn 918 1040 6

22 545 1043 7

23 548 s

24 1043 537 9

25 1044 to 540 1043 26 807 11 27 1044 773 1045 12 28 1039 13 29 1044 14 30 1042 15 38 1042 16 l

INSTRUCDONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

r 19/77 )

p I

8703190177 870228 l\\

ADOCK 05000387 l

hDR PDR i

SANN4 3

u VMe h r ~ &

Q)

' -M

?

M 3

LN

" ;F's J OPERATING DATA REPORT 0

DoCxET No. 50-387 eOpNIC S [s DATE 03/05/u/

-- i COMPLETED BY

_T.S. Ryder TEllPHONE (717) 54Z-3235 OPERATING STATUS Unit One

1. Unit Name:

Susquehanna Sterrn Electric Station Notes

2. Reporting Period:

February 1987 3293

3. Licensed Thermal Power (MWt):

1152

4. Nameplate Rating (Gross MWe):

10 %

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

1032

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Nom

9. Power Level To Which Restricted,if Any (Net MWe):

Nom

10. Reasons For Restrictions,If Any: N/A This Month Yr..to.Dat e Cumulative i1. Hours In Reporting Period 672 1,416 32,689
12. Number Of Hours Reactor Was Critical 672 1,416 23,603.5
13. Reactor Reserve Shutdown Hours 0

0 812.7

14. Hours Generator On-Line 672 1,416 23,030
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2,029,678 4,466,452 70,749,590
17. Gross Electrical Energy Generated (MWH) 661,788 1,463,284 23,050,822 63 /, m 1,409,242 22,084,271
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 100.0 100.0 70.5
20. Unit Availability Factor 100.0 100.0 70.5
21. Unit Capacity Factor (Using MDC Net) 91.9 96.4 65.5
22. Unit Capacity Factor (Using DER Net) 89.0 93.5 63.4 0.0 0.0 10.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type Date,and Duration of Each):

No shutdowns are scintuled

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

NM

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achwsed INITIA L CRITICALITY INITIAL ELECTRICITY CO\\l%IERCIAL OPER ATION to/77i

[

4,

' 'f$)], [g.

v 3,

x -.

LN S

UNIT SHUTDOWM AND POWER ltEDUC110NS DOCKET NO.

50-387 f.

g R

UNIT NAME SSES - Unit Ore p

DATE 03/05/87 g

4fC 5#

REPORT MON 111 Felruary, 1987 COMP TE E

)

3235 n.

E

-_*I5 Licensee E-t E*,,

Cause & Corrective c

5 "E

Date jE k

3s&

Event

{$

h Action to f:

5 jgg Report a mV V

H g

Prevent Recurrence 6

1 870206 S

O B

5 N/A G

ZZZZZZ Power redu d to approx. 55% to perform a rod sequence exchange and to make Reactor Water Cleanup Systen punp and valve repairs.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File INUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5-Reduction 5

G-Operational Error IExplain)

Exhibit I-Same Source N/77)

IIOther (Explain) 9-Other

I StBQUEHN@iA STEAM ELECTRIC STAPION Docket Number 50-387 Date 03/05/87 Canpleted by T.S. Ryder Telephone (717) 542-3235 6

Challenges to Main Steam Safety Relief Valves None

, Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None

[

AVERAGE DAILY UNIT POWER LET EL i

Q Y

v

(#1.

5 DOCKET NO.50-38P Le.

"h M

UNIT (9

0 DAir 03/05/87 s

IRIC cf COMPLETED BY T. S. ' R/ der TELEPHONE (717) 542-3235 Febntary 1987 gg DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER I.EVEL (MWe-Net)

(MWe-Net t 992 1055 i

7 1053 1056 2

18 1054 3

19 1056 1054 4

20 1056 1055 105E 5

21 674 1053 6

yy 993 7

23 1056 10 %

1056 8

24 OM 9

25 1056 10 1056 1055 26 il 1057 1055 27 12 1057 1055

,3 1050 13 29 1057 14 15 1059 33 16 1056 INSTRUC110NS On this format, list the average daily unit power levelin MWe. Net for each day in the reporting moneh. Compute to the nearest whole rnegawatt.

(9/77)

/

FANN e

r-n

.,g r-h f*7 Z

.U - - I..5. J OPERATING DATA REPORT t "t-i DOCKET NO.

50-388 hkiC g@M DATE _ nl/ns/R7 COMPLETED BY _ T.S. Ryder TE11 PHONE t/1/) x z-3235 OPERATING STAT US Unit 'IWo I. Unit Name:

Susepehan g Steam Electric Station Notes

2. Reporting Period:

i:'ebruar/ 1987 3293

3. Licensed ThermalPower(MWtt:

1152

4. Nameplate Rating (Gross MWe):

1065

5. Design Electrical Rating (Net MWe):
6. IAaximum wpendable Capacity (Gross MWe):

1068 1032 i

7. M sximum Dependable Capacity (Net MWe):
8. l(Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None

9. Power Level To Which Restricted,If Any (Net MWe):

Ne

10. Reaso.es For Restrictions,if Any:

N/A This Month Yr..to.Date Cumulative i1. Houd in Reporting Period 672 1,416 17,928

12. Nu'nber Of Hours Reactor Wo. Critical 672 1,353 14,461 0

0 717.9

13. Reactor Reserve Einutdown Hours 14, ilours Generator Gn-Lia 672 1,317.3 14,046.6
15. Unit Resene S7.:.tdown Hours 0

0 0

16. Gross Therrral Energy Generated (MWH) 2,178,393 4,194,397

_43,587,282

37. Greu l>:e 91 cal Energy Generated (MWH) 720,962 1,385,468 T47289,762 696,990 1,35/,013 ld,73 9,542 1h Net Eleewal Energy Generated [MWH) f S. Un t Sersne Factor 100.0 93.0 78.4 2J. Urit Avalshiity Factor 100.0 93.0 78.4
21. Un!t Capaciiy Factor (Using Mr.C %t) 100.5 91.5 74.3 7*4 08.7 72.0
22. Unit Capacity Factor IUsinp 0ER Net)

U'U

.#

  • U
    • U
23. L'.dt Forced Outage Rate 24., St.utJowns Scheduled Ovry Nc. 6 Months IT)pe. Date.and Duration of Each):

No shutdowns are sclnluled

'/*,'!! She Down At End Ofitepost Period, Estinsated Date of Startup:

M/^

26. Units 1.s Test Sutus iI5or to Commercial Operation):

Forecast Achiesed INITIAL CRillCALITY INITIAL ELEC TRICITY COMWIRCIAL OPER ATION (4/77 )

gANN4 j,l y

y Lb d

UNIT SHUTDOWNS AND POWER REDUC 110NS DOCKETNO. 50-388 e

g UNIT NAME SSES - Unit 'I%o f,

DATE 03/05/87 f '?gIC 5s C

REPORTMONTH February 1987 COMPLETED BY T.S. e/ der TELEPHONE II'ID42-32dD

-_E e

EO "E

  • E5 Licensee E-r En Cause & Corrective No.

Date E

3l 3jE Event 5i h'3 Action to H

f 5

j di g Report a mO Prevent Recurrence g

5 2

870206 F

0 A

5 N/A TB FAN Power reduced to approx. 65% to replace failed bearings on the isophase bus duct cooling fan.

I 2

3 4

F: Forced Reason:

M:; hod:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Esniain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5-Reduction 5

G-Operational Error (Explain)

Exhibit I-Same Source 19/77) ll-Other(Explain) 9-Other

f SLBQUEHRIOR STEAM ELECTRIC STRrION Docket Ntznber 50-388. Date 03/05/87 Capleted by T.S. Ryder Telephone (717)S42-3235 Otallenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None

s-A.

PP&L Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101 = 215 / 770L5151 MAR 131987 Submitted Pursuant to Technical Specifications Harold W. Keiser Section 6.9.1.6 Vice President-Nuclear Operations 215/770-7502 Director, Data Automation &

Management Information Division Attention:

Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 PLA-2810 FILE R41-2A 50-388/NPF-22

Dear Mr. Beebe:

The February 1987 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours,

' \\

s H. W. Keiser Vice President-Nuclear Operations Attachment cc: Document Control Desk (Original)

NRC Region I Mr. L. R. Plisco - NRC Resident Mr. M. C. Thadani - NRC Project Manager

}q