PLA-2248, Monthly Operating Repts for June 1984
| ML20090J209 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/30/1984 |
| From: | Kenyon B, Kuczynski L PENNSYLVANIA POWER & LIGHT CO. |
| To: | Beebe M NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| PLA-2248, NUDOCS 8407270443 | |
| Download: ML20090J209 (9) | |
Text
.
AVERAGE DAILY UNIT POWER LEVEL gg
- Y Q
v (t).
3 DOCKET NO.
50-387
~
L~
UNIT One 0
DATE July 9, 1984 07g gyh COMPLETED BY L.A. Kuczynski TELEPHONE 717-542-3759 go m June, 198'i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 1048 937 37 2
1042 gg 1035 3
873 g,
1030 4
1042 1038 20 5
1037 1043 21 6
1031 22 1038 7
1024 23 1025 8
1024 24 9Il 9
1017 25 1037 10 958 10'45 26 33 1024 27 1038 12 1034 1035 28 13 740 1035 2,
14 0
30 1037 15 260 3
16 724 l
l INSTRUCTIONS l
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) 8407270443 840630 l
PDR ADOCK 05000387 l
R PDR
, [, 3 L, 1 I
Y 8 h)
Z
_7_T.'.__. %
LNi CZJ OPERATING DATA REPORT o
DOCKET NO.
50-387 is DATE Juiv 9. 1984 OkIC SY COMPLETED BY L.A. Kuczynsk i TELEPHONE 717-542-3759 OPERATING STA TUS Unit 1 Notes
- 1. Unit Nam 6: Susquehanna Steam Electric Station
- 2. Reporting Period:
June. 1984
- 3. Licensed Thermal Power (MWt): 3293 1152
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 1065 1068
- 6. Maximum Dependable Capacity (Gross MWe):
1032
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None i
None
- 9. Power Level To Which Restricted. If Any (Net MWe):
None
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to.Date Cumulative i1. Hours in Reporting Period 720 4.167 9.336
- 12. Number Of Hours Reactor Was Critical 6a1 2,588 6,433,3
- 13. Reactor Reserve Shutdown Hours 29 29 185.7
- 14. Hours Generator On-Line 683 2.502.8 6,271.1
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2.154.934 7,583,809 18,845,470
- 17. Gross Electrical Energy Generated (MWH) 702,180 2,484,220 6,150,770
- 18. Net Electrical Energy Generated (MWH) 675.830 2,392,225 5,928,598
- 19. Unit Service Factor 94.9 57.3 67 2
- 20. Unit Availability Factor 94.9 57.3 67 2
- 21. Unit Capacity Factor (Using MDC Net) 91.0 53.1 61 5 88.1 51.4 59 6
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 5.1 19.2 15.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
None N/A i
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Cominercial Operation):
Forecast Achieved INITIAL CRITICALITY IN111AL ELECTRICITY COMMERCIAI. OPERATION (0/77) v
gANN4
,b 1f*Y f
\\
y
'...'NL
, D \\
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-387 th 4
UNIT NAME One (p
,,.t f-DATE July 9.
1984 REPORT MONTH June, 1984 COMPT.ETED BY L A.
Kuczynski
- 4fC 61 TR EPHONE 717-542-3759 i
=
c lE 3
4.E ~
Licensee
,E g y1, Cause & Corrective N..
Ihre g
3g js5 Event g'g p'
Action to F
$5 5
35g Report a mO Prevent Recurrence e
s-u O
5 840613 F
37 H
3 84-028 HA VALVEX The Unit scrammed on control valve fast closure as a result of the loss of a transmission line. The loss of power to various controllers in the plant allowed reactor vessel coolant level to rise to the high level t ri p setpoint for the main turbine. All plant systems responded as designed except for a slow transfer of the 4KV ESS Bus 2A to its alternate supply.
This problem is currently being inves-tigated.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File INUREG.
D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source 19/77)
IICther (Explain)
Unit 1 SUSQUEHANNA STEAM ELECTRIC stall 0N Docket Number 50-387 Date July 9, 1984 Completed by L.A. Kuczynski Telephone 717-542-3759 Challenges to Main Steam Safety Relief Valves.
None Changes to the Offsite Dose Calculation Manug.
None.
Major Changes to Radioactive Waste Treatment Systems.
None.
I
(
l
- l i.
AVERAGE DAILY UNIT POWER LEVEL Q\\
g+
7
.D
)
7)i 3
DOCKET NO.
50-388
(.
rrm.
UNIT Tm N
Y Q
h I
DATE July 9, 1984 p
RIC $
COMPLEED 8Y L. A. Kuczynski TELEPHONE 717-542-1759 MONTH June, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 1 0
0 g7 2
0 0
gg 3
0 39 0
4 0
' 20 0
5 0
0 21 6
0 0
y 1
0 D
0 8
0 0
24 9
0 3
0 10 0
26 0
1I O
27 0
12 0
0
- g 13 0
0 29 14 0
30 0
15 0
3g 16 0
INSTRUCIlONS On this format list the average dady unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
ANN 4
%}/
>+
1 7
.D Z
_7 N_.
3 LN.
C1".r. ;
OPERATING DATA REPORT DOCKET NO.
50-388 Q
DATE July 9, 1984 RfC g COMPLETED BY L. A.
Kuczynsk i TELEPHONE 717-542-3759 OPERATING STATUS Unit 2 N I'5
- 1. Unit Nam Susquehanna Steam Electric Station
- 2. Reporting Period: June, 1984 Received full power operating
- 3. Licensed Thermal Power (MWt):
3293 1icer.se June 27, 1984.
1152
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe):
- To be determined.
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None
- 9. Power Level To which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr..to.Date Cumulative
- 11. Hours In Reporting Period '
O O
O
- 11. Number Of Hours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown Hours 0
0 0
0 0
n
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0
o
- 17. Gross Electrical Energy Generated (MWH) 0 0
0
- 18. Net Electrical Energy Generated (MWH) 0 0
0
- 19. Unit Service Factor NA NA NA NA NA NA
- 20. Unit ' Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
NA NA NA NA NA NA
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate NA NA NA
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each):
Maintenance Outage 10/27/84, 7 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Unit in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY ~
05/09/84 09/08/84 INITIAL ELECTRICITY 06/28/84 07/03/84 COMMERCIAL OPER ATION 12/31/84 (4/77)
i Sf6;
\\,5j+
~:~
y y
%. j - --
h DOCKET NO.
50-388 UNIT SHUTDOWNS AND POWER REDUC 110NS UNIT NAME Two
- N o
DATE-July 9.
1984 4fC Mp REPORT MONT11 June, 1984 COMPLETED BY L A. Kuczynski TELEPHONE 717-542-3759 C
C jE 3
- Y2 Licensee
,E t,
{*,
Cause & Corrective Nm Date i
3g s
js5 Event g?
g3 Action to g'
y:
jgg Report a mV H
Prevent Recurrence 6
840611 F
18.2 H
2 NA SA INSTRU Reactor scrammed from sub-critical in preparation for suppression cham-ber entry to correct vacuum breaker dual indication.
l l
1
..~
\\
l l
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram-Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source 19/77)
Il-Other (Explain)
Unit 2 SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-388 Date July 9, 1984
' Completed By L. A. Kuczynski Telephone 717-542-3759 Challenges to Main Steam Safety Relief Valves.
None.
M t
).
L m
j
p Y
@ Pennsylvania Power & Light Company Two North Ninth Street
- Allentown, PA 18101
- 215 1 770 5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 JUL 121984 Director, Data Automation &
Management Information Division Attention:
Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nucicar Regulatory Commission Washington, D.C.
20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387 PLA-2248 50-388
Dear Mr. Beebe:
The June 1984 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, I
H 1 Mh B. D. Kenyon Vice President-Nuclear Operations Attachment cc: Dr. Thomas E. Murley INPO Records Center Regional Administrator-Region I Suite 1500 U.S. Nuclear Regulatory Commission 1100 Circle 75 Parkway 631 Park Avenue Atlanta, Georgia 30339 King of Prussia, PA 19406 Director Mr. Thomas E. Pollog Office of Inspection and Enforcement Department of Environmental U.S. Nuclear Regulatory Commission Resources Washington, D.C.
20555 Bureau of Radietion Protection Attn: Document Control Desk (12 copies)
P.O. Box 2063 Harrisburg, PA 17120 Mr. R. H. Jacobs - NRC Mr. R. L. Perch - NRC d