Monthly Operating Repts for Sept 1986
ML20207F950
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/30/1986
From: Hirt J
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML20207F643 List:
References
NUDOCS 8701060262
Download: ML20207F950 (9)


Text

, -l N4 4 AVERAGE DAILY UNIT POWER LEVEL p

w

\%

E DOCKET NO. 50-387 f, s one UNIT

(

p IRIC Si / DATE COMPLETED BY TELEPHONE October 6, 1986 J.A. Hirt _

(717)542-3917 MONTH -- September, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) g 1035 g7 o 2 1032 a gg 3 1031 g, 0 ,

4 1032 0 20 3 1027 o 21 6 1032 0 22 1035 315 7 23 _

3 1040 687 24 9 1042 25 884 10 1034 1027 26 II 1022 1030 27 841 12 :3 1035 13 0 29 1025 14 0 30 10?n 15 0

3, 16 o l

l INSTRUCTIONS On this format. list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) l 8701060262 861013 PDR ADOCK 05000097 R PDR IEDH 'It

A@y

_g _%7 mOf T -h

_ ... E t N -_ _ . m. J OPERATING DATA REPORT

\ DOCKET NO. 50-387 Q NIC Si DATE October 6, 1986 COMPLETED BY .T A _ Hirt TELEPHONE (717) 542-3917 OPERATING STATUS Unit One

1. Unit Name: Suscuehanna steam Floctri c station . otes
2. Reporting Penod: September, 1986 ,
3. Licensed Thermal Power (Mht): 3293 8
4. Nameplate Rating IGross MWe1: 1152 j
5. Design Electrical Rating qNet MWel: 1065
6. Maximum Dependable Capacity tGross MWe): 1069 -
7. Maximum Dependable Capacity (Net MWel: 1032 I
8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To which Restricted. lf Any INet MW'e): None *
10. Reasons For Restrictions,if Any: M/A This Month Yr..to.Date Cumularise i1. Hours In Reporting Period 720 6.551 29.064
12. Number Of Hours Reactor Was Critical 489.7 4,165.6 20,136.8
13. Reactor Reserve Shutdown Hours 0 102.1 812.7
14. Hours Generator On.Line 475.9 4,011.7 19,630.5
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,469,141 12,547,062 60,134,387 17 Gross Electrical Energy Generated iMWH) 478,190 4,076,932 19,575,924
18. Net Electrical Energy Generated (MWH) 457,694 3,892,827 18,737,565
19. Unit Service Factor 66.1 61.2 67.5 i 20. Unit Availability Factor 66.1 61.2 67.5
21. Unit Capacity Factor IUsing MDC Net) 61.6 57.6 62.5 2;. Unit Capacity Factor (Using DER Net) 59.7 _

55.8 60.5

23. Unit Forced Outage Rate 0.0 14.5 11.9

{

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Ead r None
25. If Shut Down At End Of Report Period. Estimated Date of Startup: NM
26. Units in Test Status t Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY I INITIAL ELECTRICITY l COMMERCIAL OPERATION l

n->

gpANN4 .

y i 7(Eh) a 4 -

e 3 .

-^

b UNIT SIIUitDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387 .

U

$ PPat UNIT NAME DATE SSES-Unit 1 O*nhor 6 - 1986 j

%# 'NIC M RrPORT MONTil Sentember. 1986 COMPLETED BY TELEPHONE J.A. Hirt (717)542-3917

-. 5? = $k Licensee p, h". Cause & Corrective No. Date g 3g g jg5 Event  ;; '? E- Action to H 5

$. = @ =

e  !

Report # 'N 0 $'3 O

Prevent Recurrence d

10 860912 S 244.1 B 2 NA CE ISV On September 12, 1986, Unit One Shutdown for a maintenance outage.

The major repair work included repacking an isolation valve for the Reactor Water Cleanup system, reworking of connectors and cables on main steam relief valves, as well as cleaning and repairing components associated with the drywell sump system. Following the repair work, Unit One restarted and synchoronized to the grid on September 23, 1986.

I I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G -Instructions A Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3-Autornatic Scram. Event ReporI (LER) File (NUREG-D Regulatory Restriction 4-Continuation 016l)

E-Operator Training & License Examination from previous month F-Administrative G-Operational Error (Explain) 5-Reduction 5 Exhibit I - Same Source (9/77) Il-Other (E xplain) 9-Other

N4 AYERAGE DAILY UNIT POWER LEVEL o

\

f 7 w E DOCKET NO.

0-388 iN "

UNIT - Two f 30 DATE - october 6, 1986 Iggg gY COMPLETED BY J.A. Hirt TYLEPHONE (717) 542-3917 y0 NTH _ september, 1986 DAY AYERAGE DAILY PCWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (Mw Neg; I

O 0

,7 2 0 13 0 3 0 __

19 n -

4 0 20 0 5

0 o 7,

0 0 6 n 7 0 y 0 -

3 0 0 24 9 0 0 3

10 0 0 26 l 11 O p 0 12 0 0 2s 13 0 0 29 14 0 0 30 0

15 3t 16 0 INSTRUCTIONS On this format, list the average dady unit power tevelin MWe Net for each day in the repomng month. Compute to the nearest whole megawatt.

(0177) l l

l ,

_ _ _ _ _ _ _ _ __r_____.-__. , - _ _ _ . - -

ANN 4

- Ky s+y

-s.

3

@ .... ?a LN. C .J OPERATING DATA REPORT O DOCKET NO. 50-388 O M DATE october 6, 1986 hyc $Y COMPLETED BY J.A. Hitt TELEPHONE (717)S42-3917 OPERATING STATUS Unit Two

1. Unit Name: Susouehn ma steam Fl octri c station . otes Unit 2 was shutdown on
2. Reporting Period: September, 1986 August 9, 1986 to
3. Licensed Thermal Power 151%t1: 3293 begin its first ,
4. Nameplate Rating (Gross 31WeI: 1152 refueling outage.
5. Design Electrical Rating iNet SIWel: 1065
6. Maximum Dependable Capacity (Grov \lWep: 1068 .
7. Maximum Dependable Capacity (Net MWe). 1032 l
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

None

9. Power Level To %hich Restricted,if Any iNet MWe): None
10. Reasons For Restrictions. If Any: N/A This Month Yr..to Date Cumularise
11. Hours in Reporting Period 720 6,551 14,303
12. Number Of Hours Reactor Was Critical 0 4,510.3 11,63 r. 5 0 .6 717.9
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 0 4,396.6 11,391.7
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 13,285,935 35,316,733
17. Gross Electrical Energy Generated (MWH) 0 4,349,718 11,562,518 N ,639 4,168,105 11,122,415
18. Net Electrical Ls.ergy Generated (MWH)
19. Unit Service Factor 0 67.1 79.7
20. Unit Availability I actor 0 67.1 79.7
21. Unit Capacity Factor a Using MDC Net) 0 _ , 61.7 75.4
22. Unit Capacity Faetor (Using DER Net) 0 59.7 73.0

- ~ -

U 16.8 12.6 i 23. Unit Forced Outage Rate l

24. Shutdowns Scheduled Over Next 6 Months tType. Date, na Duration of Eaen r None
25. If Shut Down At End Of Report Period. Estimated Date of Startup: nehar 9a. 1 ou
26. Units in Test Status aPrior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY l

INITIA L ELECTRICITY l COMMERCIAL OPERATION p-i l .

q,0 4 ,p ,l-1 a -l -)h 1,) i @ > ,

9

.... 3 UNIT SIIUtDOWNS AND POWER REDUCTIONS DOCKETNO. 50-388 -

cD G [ UNIT NAME ncrc-nni+ '

DATE October 6, 1986 l

  1. fC M[ REPORT MONTil Seratember, 1986 COMPLETED BY T3- Hire TELEPHONE mm m _292.7 e.

E E

- 5; "E -' EU Eicensee E-t E'n Cause & Corrective No. Date

{

H jj y )gS Event (i

mo fiU Action to

$I cE j 6j g Report st g Prevent Recurrence d

8 860809 S 720.0 C 2 NA ZZ ZZZZZ Unit 2 was manually shutdown on August 9, 1986 to begin its first

  1. refueling outage. The expected restart date is October 24, 1986, 1

l 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G - Instructions A Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheels for I.icensee C Refueling 3-Automatic Scram. Event ReporI (i.E R) File (NUREG-D-Regulatory Restriction 4 Continuation 01611 E-Operator Training & License Examination frorn previous month F-Administrative 5 G-Operational Error (Explain) 5-Reduction Exhibit I - Same Source (9/77) II-Other (E xplain) 9-Other

UNIT 1 SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date October 6, 1986 Completed.by J.A. Hirt Telephone (717)S42-3917

~

Challenges to Main Steam Safety Relief Valves None

~ Changes to the Offsite Dose Calculation Manual Changes to the Offsite Dose Calculation Manual are included in Attachment A.

Major Changes to Radioactive Waste Treatment Systems None.

UNIT 2 SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-388 Date October 6, 1986 Completed by J.A. Hirt Telephone (717) 542-3917

-Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual Changes to the Offsite Dose Calculation Manual are included in Attachment A.

Major Changes to Radioactive Waste Treatment Systems None.-

AttacInent A As required by Technical Specification 6.9.2.6, the following changes which have been incorporated into the Offsite Dose Calculation Manual (ODCN) within the past 90 days are being subnitted with the Septenber,1986, Monthly Operating Report.

1. 'Ihe Introduction section has been revised to indicate that the dose calculation for infants is perfonned monthly instead of quarterly.
2. The word "approximately" has been added to the section on flow channel setpoint determination (page 12 of the ODCN) .
2. A new milk sanpling station has been added to the Radiological Environnental Monitoring Program (REMP) sampling location map (page 43 and 45 of the ODCN) .
4. Policy Statenent 10.6 has been added. The statstent defines the appropriate treatment for discharging Liquid Radwaste waste.