MONTHYEARML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions PLA-3027, Monthly Operating Repts for Apr 19881988-04-30030 April 1988 Monthly Operating Repts for Apr 1988 PLA-2938, Monthly Operating Repts for Oct 19871987-10-31031 October 1987 Monthly Operating Repts for Oct 1987 PLA-2924, Monthly Operating Repts for Sept 19871987-09-30030 September 1987 Monthly Operating Repts for Sept 1987 PLA-2913, Monthly Operating Repts for Aug 19871987-08-31031 August 1987 Monthly Operating Repts for Aug 1987 PLA-2900, Monthly Operating Rept for Jul 19871987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 PLA-2886, Monthly Operating Repts for June 19871987-06-30030 June 1987 Monthly Operating Repts for June 1987 PLA-2866, Monthly Operating Repts for May 19871987-05-31031 May 1987 Monthly Operating Repts for May 1987 PLA-2853, Monthly Operating Repts for Apr 19871987-04-30030 April 1987 Monthly Operating Repts for Apr 1987 PLA-2832, Monthly Operating Repts for Mar 19871987-03-31031 March 1987 Monthly Operating Repts for Mar 1987 PLA-2810, Monthly Operating Repts for Feb 19871987-02-28028 February 1987 Monthly Operating Repts for Feb 1987 PLA-2798, Monthly Operating Repts for Jan 19871987-01-31031 January 1987 Monthly Operating Repts for Jan 1987 PLA-2782, Monthly Operating Repts for Dec 19861986-12-31031 December 1986 Monthly Operating Repts for Dec 1986 PLA-2765, Monthly Operating Repts for Nov 19861986-11-30030 November 1986 Monthly Operating Repts for Nov 1986 PLA-2753, Monthly Operating Repts for Oct 19861986-10-31031 October 1986 Monthly Operating Repts for Oct 1986 ML20207F9501986-09-30030 September 1986 Monthly Operating Repts for Sept 1986 PLA-2713, Monthly Operating Repts for Aug 19861986-08-31031 August 1986 Monthly Operating Repts for Aug 1986 PLA-2701, Monthly Operating Rept for Jul 19861986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 PLA-2675, Monthly Operating Repts for June 19861986-06-30030 June 1986 Monthly Operating Repts for June 1986 PLA-2660, Monthly Operating Repts for May 19861986-05-31031 May 1986 Monthly Operating Repts for May 1986 PLA-2639, Monthly Operating Repts for Apr 19861986-04-30030 April 1986 Monthly Operating Repts for Apr 1986 PLA-2624, Monthly Operating Repts for Mar 19861986-03-31031 March 1986 Monthly Operating Repts for Mar 1986 PLA-2606, Monthly Operating Repts for Feb 19861986-02-28028 February 1986 Monthly Operating Repts for Feb 1986 PLA-2595, Monthly Operating Repts for Jan 19861986-01-31031 January 1986 Monthly Operating Repts for Jan 1986 PLA-2580, Monthly Operating Repts for Dec 19851985-12-31031 December 1985 Monthly Operating Repts for Dec 1985 PLA-2567, Monthly Operating Repts for Nov 19851985-11-30030 November 1985 Monthly Operating Repts for Nov 1985 PLA-2552, Monthly Operating Repts for Oct 19851985-10-31031 October 1985 Monthly Operating Repts for Oct 1985 PLA-2543, Monthly Operating Repts for Sept 19851985-09-30030 September 1985 Monthly Operating Repts for Sept 1985 PLA-2530, Monthly Operating Repts for Aug 19851985-08-31031 August 1985 Monthly Operating Repts for Aug 1985 PLA-2516, Monthly Operating Repts for Jul 19851985-07-31031 July 1985 Monthly Operating Repts for Jul 1985 PLA-2500, Monthly Operating Repts for June 19851985-06-30030 June 1985 Monthly Operating Repts for June 1985 PLA-2487, Monthly Operating Repts for May 19851985-05-31031 May 1985 Monthly Operating Repts for May 1985 PLA-2466, Monthly Operating Repts for Apr 19851985-04-30030 April 1985 Monthly Operating Repts for Apr 1985 PLA-2442, Monthly Operating Repts for Mar 19851985-03-31031 March 1985 Monthly Operating Repts for Mar 1985 PLA-2424, Monthly Operating Repts for Feb 19851985-02-28028 February 1985 Monthly Operating Repts for Feb 1985 PLA-2409, Monthly Operating Repts for Jan 19851985-01-31031 January 1985 Monthly Operating Repts for Jan 1985 PLA-2387, Monthly Operating Repts for Dec 19841984-12-31031 December 1984 Monthly Operating Repts for Dec 1984 PLA-2371, Monthly Operating Repts for Nov 19841984-11-30030 November 1984 Monthly Operating Repts for Nov 1984 PLA-2349, Monthly Operating Repts for Oct 19841984-10-31031 October 1984 Monthly Operating Repts for Oct 1984 PLA-2330, Monthly Operating Repts for Sept 19841984-09-30030 September 1984 Monthly Operating Repts for Sept 1984 PLA-2305, Monthly Operating Repts for Aug 19841984-08-31031 August 1984 Monthly Operating Repts for Aug 1984 PLA-2273, Monthly Operating Repts for Jul 19841984-07-31031 July 1984 Monthly Operating Repts for Jul 1984 PLA-2248, Monthly Operating Repts for June 19841984-06-30030 June 1984 Monthly Operating Repts for June 1984 ML20092M9831984-05-31031 May 1984 Monthly Operating Repts for May 1984 PLA-2195, Monthly Operating Repts for Apr 19841984-04-30030 April 1984 Monthly Operating Repts for Apr 1984 1998-02-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML17146B1741999-08-0303 August 1999 GL 96-06 Risk Assessment for Sses. ML20206D3331999-04-27027 April 1999 SER of Individual Plant Examination of External Events Submittal on Susquehanna Steam Electric Station,Units 1 & 2. Staff Notes That Licensee IPEEE Complete with Regard to Info Requested by Suppl 4 to GL 88-20 ML20195B2381999-03-31031 March 1999 Redacted Version for 10CFR2.790 Request for Decommissioning Status Rept for Sses,Units 1 & 2 ML17164A8451998-10-31031 October 1998 SSES Unit 1 Tenth Refueling & Insp Outage ISI Outage Summary Rept. ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20217Q4891998-04-21021 April 1998 Rev 1 to Draft LDCN 2482, FSAR Chapter 13.4 & FSAR Chapter 17.2 Changes to Support ITS Implementation ML18026A4931998-03-30030 March 1998 LER 97-007-01:on 971017,entry Into TS 3.0.3 Occurred to Allow Completion of Surveillance Testing of One Channel of Rbm.Caused by Failure of Components in LPRM Output to Rbm. Submitted TS Change Request to Extend LCO Action Statement ML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18026A4891997-11-17017 November 1997 LER 97-007-00:on 971017,TS 3.0.3 Entry Voluntarily Made. Caused by Inadequate Post Maint Testing Following Earlier Work Associated W/Components.Failed Components Repaired, Replaced & Testing Completed ML18017A2921997-10-28028 October 1997 1997 Nrc/Fema Observed Exercise. ML17158C1861997-06-0505 June 1997 Proceedings of Intl Topical Meeting on Advanced Reactors Safety Vol II, on 970601-05 ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML18026A4781997-03-28028 March 1997 Rev 1 to Application of Anfb to ATRIUM-10 for Susquehanna Reloads. ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20155F7661996-07-25025 July 1996 Partially Deleted Job Number 739619-96, Investigation of E Diesel Breaker Misalignment ML20155F7491996-07-24024 July 1996 Independent Safety Evaluation Svcs Project Rept 3-96, Investigation of E Diesel Generator In-Operability Event ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML18026A5961996-01-0202 January 1996 LER 95-013-00:on 951119,thermally Induced Pressure Locking of HPCI Valve Occurred Under Bonnet Pressure of 3,000-7,000 Psig.Damaged HPCI Injection Valve repaired.W/960102 Ltr ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17158A8771995-08-15015 August 1995 Exercise Manual. ML17158A8061995-07-14014 July 1995 Books 1 & 2 of ISI Outage Summary Rept SSES Unit 1 8th Refuel Outage. ML18017A0461995-07-0707 July 1995 LER 95-008-00:on 950609,shift Average Licensed Core Thermal Power Was Exceeded.Caused by Failed Instrumentation Drift. Repaired & Recalibrated Subject Instrumentation ML17164A6631995-04-11011 April 1995 Impact of Extending T-10 AOT from 3 to 7 Days. ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML18026A5351994-10-31031 October 1994 SSES Unit 1 & 2 MSIV Leakage Alternate Treatment Method Seismic Evaluation. W/One Oversize Drawing ML17158A4821994-08-23023 August 1994 ISI Outage Summary Rept Unit 2 6th Refueling Outage, Books 1 & 2 of 2 ML17158A2391994-04-0505 April 1994 Books 1 & 2 of SSES Unit 1 Seventh Refueling & Insp Outage ISI Outage Summary Rept. ML18017A2701993-12-31031 December 1993 PP&L Annual Rept 1993. ML17158A2651993-12-31031 December 1993 Allegheny Electric Cooperative,Inc Annual Rept 1993. ML17158A1631993-12-0909 December 1993 Remote Indication of Spent Fuel Pool Level & Temperature. ML18026A4281993-08-16016 August 1993 PP&L Response to NRC Concerns Re Loss of Spent Fuel Pool Cooling Following Loca,Sses,Units 1 & 2. ML18026A4261993-06-0909 June 1993 LER 90-007-01:on 900705,primary Power Supply to RPS a Power Distribution Panel Lost When One Electrical Protection Assembly (EPA) Breaker Tripped.Epa Logic Cards Reviewed & RPS Power Supply Will Be redesigned.W/930609 Ltr ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML18017A2031993-02-0101 February 1993 Books 1 & 2 of Unit 2 Fifth Refueling & Insp Outage,Isi Outage Summary Rept. ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions ML17157C3691992-12-31031 December 1992 PP&L Annual Rept 1992. ML20056C3941992-12-31031 December 1992 Allegheny Electric Cooperative,Inc Annual Rept 1992 ML18017A0421992-12-14014 December 1992 Suppl to 921127 Part 21 Rept Re High Air Concentration in Reactor Bldg Making Area Uninhabitable for Retrieving Air Filters,Per NUREG-0737,Item II.F.1.Util Current Position Re Fuel Pool Cooling Issues Contrary to Reg Guide 1.3 ML18026A2481992-11-27027 November 1992 Part 21 Rept Re Substantial Safety Hazard in Design of Facility for Loss of Normal Spent Fuel Pool Cooling ML18026A4231992-11-17017 November 1992 LER 92-016-00:on 920416,discovered That Existing Analysis for Two Spent Fuel Storage Pools Did Not Reflect Current Fuel Design & Plant Operation.Caused by Failure to Modify FSAR Analysis.Fsar Will Be revised.W/921117 Ltr ML17157C1421992-10-21021 October 1992 Engineering Assessment of Fuel Pool Cooling Piping EDR-G20020. ML17157C1411992-08-31031 August 1992 Loss of Fuel Pool Cooling Event Evaluation. ML17157C1401992-08-31031 August 1992 Review of Fuel Pool Cooling During Postulated Off-Normal & Accident Events SSES Units 1 & 2. ML20082C4941992-08-14014 August 1992 Evaluation of Unit 1 & Unit 2 Derating of Power Cables in Raceways Wrapped W/Thermo-Lag Matl ML17157C1381992-07-27027 July 1992 Safety Consequences of Boiling Spent Fuel Pool at Susquehanna Steam Electric Station. ML17157B9331992-07-24024 July 1992 Sixth Refueling & Insp Outage Inservice Insp Outage Summary Rept, Books 1 & 2 ML20097D4681991-12-31031 December 1991 Pennsylvania Power & Light Company,1991 Annual Rept ML18017A0391991-07-26026 July 1991 LER 91-010-00:on 910628,RWCU Isolated on Two Occassions Due to Actuations of Steam Leak Detection Instrumentation. Caused by Design Deficiency & Elevated Ambient Penetration Room Temps.Temp Modules replaced.W/910726 Ltr 1999-09-30
[Table view] |
Text
f
@ AVERAGE DAILY UNIT POWER LEVEL z
71 ty M
w 8)
~~ %
6, E DOCKET NO. 50-387 UNIT 0""
(
(p 4 DATE 7-8-86 N[C 5 COMPLETED 8Y L.A. Kuczynski TELEMIONE (717)s42-3759 June 1986 MON 7){
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Neel (MWe Net) 1 0 0 17 0
2 IS 0 0
3 19 0 .
4 0 226 20
~*
0 21 739 6
0 958 22 7 0 1.019 13 -
S 0 1,028 24 9
0 1,036 23 10 0 1,034 ,,
26 0
Il 27 1,024 0 1,015 12 23 0 1,022 83 29 0 1,033 14 30 0
I5 3l 0
l6 INSMUCTIONS On this format. list the average dady ur.tt power 'evelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
19177) t 0609110352 860630 DR ADOCK 0 000307 af & &.f
& /
PDR I
,I
AM4 ,
. ~N &
~ $+7
=Df m s L f. . c; OPERATING DATA REPORT O \ DOCKET NO. 50-387 O M DATE 1-a-86 NIC 3Y COMPLETED BY TELEPHONE L.A. Kuczynski
'717);4'-3759 OPERATING STATUS Unit 1 Susquehanna Steam Electric Station Notes
- 1. Unit Name:
- 2. Reporting Penod: Junn 1996 3293 !
- 3. Licensed Thermal Power IMht3:
- 4. Nameplate Rating (Gross MWe p: 119' i
$ Design Electrical Rating (Net MWei: 1065
- 6. Maximum Dependable Capacity tGross MWep: 106R ,
- 7. Maximum Dependable Capacity (Net MWel: 10U l
- 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reasons:
nonn
- 9. Power Level To which Restricted. lf Any (Net MWei: Mone
- 10. Reasons For Restrictions. lf Any: Nor.o
, This Month Yr..to.Date Cumulatne 720 4,343 26,856
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 290.6 2,187.9 10,179.1
- 13. Reactor Reserve Shutdown Hours 102.1 102.1 n12.7
- 14. Hours Generitor On Line 257.4 ?.047.0 17.666.6 l$. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated IMWH) 7nn ani 6,267,138 53,054,463 17 Gross Electrical Energy Generated IMWH) '91 090 2,044,234 17,543,226
- 18. Net Electrical Energy Generated IMhH) 234.976 1,935,318 16,780,056 19 Unit Service Factor 35.8 _
47.2 65.R 20 Unit A$ailability Factor 35.8 , 47 2 6s_n
- 21. Unit Capacity Factor lUsing MDC Nett 31.6 __,_ 43.2 60.5
- 22. Unit Capacity FactorIUung DER Ne p 30.6 _,,_ 41.n 50.7
- 23. Unit Forced Outage Rate 64.2 25 13.0
- 24. Shutdowns Scheduled Over Nest 6 Months IType. Date.and Duration of Eam None
- 25. If Shut Down 4: En.1 Of Report Period, Estimated Date of Startup: N/A
- 26. Units in Test Status iPrior to Commercial Operations- forecast Tshie$ed INITIAL CRITICALITY INITIA L ELECTRICITY C041%IERCI A L OPER A TION en ~ i n
g&NNA 4
- J - '
' ,< 3 .hl {
-; .t y .
? w w _# ~
- ' W UNIT SHUTDOhNS AND POWER REDUCTIONS DOCKET NO.
one UNIT NAME 4,
@ 8 DATE 7-9-86 CO N DBY L.A- Kuczynski I4sc SY REPORT MONTH June 1986 TELEPHONF (7171542-3759
- 5 E j- 3 j E3 Licensee . ,E-r, , Cause & Corrective N.- Dee i 3= 4 25s Event g mo
{*3 gV Action to
- y: E j5g Report e g , Prevent Recurrence d
7 860524 F 462.6 A 4 86-021 WE PUMPXX Unit was mankially shutdown following failure of Emergency Service Water (ESW) pump "C" due to severe erosion of its suction bell and identificatio1:
of similar erosion on ESW pump "A".
Additional tasks were completed to reduce the workload of the upcoming Unit 2 refueling and inspection outage.
I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Mair.tenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram- Event Report (LER) File (NUREG-D-ReEulatory Restriction 4-Continuation 0161)
E-Operator Training & Ucense Examination from previous month F-Administrathe i G-Operational Esror iExplaini 5-Redaction Exhibit I - Sanw Source t'8/77) IIOther (Explain, 9-Other
UNIT 1 SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 7-8-86 Completed by L.A. Kuczynski Telephone (717)S42-3759 Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None
NA AVIRACE DAILY UNIT POWER Lgygt
\ Y DOCKET No. 50-388 m J UNIT W f g \
DATI 7-n-nc,
? I COMPLETED BY L.A. Kuczynski TILIMf0Ng (717)542-3759 40NTN inno 1onn DAY AVERAGE DAILY POWER LEVEL DAY AYERAGE DAILY POWER LEVEL (MWe Ns0 tMWe Net)
I O 0 17 2
0 0 18 3 n 47 19 .
4 0 c.n c, 20 g a 936 21 6 0 943 22 7 0 934 23 0 937 3 24 9 0 937 23 10 0 927 ,
26 0
\\ 27 911 I2 o 096
- g 13 0 ;,
891 14 0 n92 30 IS 0 3I 0
le INSTRUCTIONS On this format,ltst the averop dady unit power tevelin MWe. Net for each day in the repumng month. Compute to the nearest whole megawatt.
49177) i l
e
2f _- 3~ - %v
_b_ 3 t" -
~cJ OPERATING DATA REPORT 0 \ DOCxtTNO 5 -asa DATE 7-s-nc, bRfC Si [s COMPLETED BY TELEPHONE '7171542-3759 T,. A. KuczynsH OPERATING STA TUS Unit 2 i b"
- 1. Unit Name: Sumninhanna Stoan Electric station I I
- 2. Repeting Penod: h 1 'm
- 3. Licensed Thermal Power IMhts; 12'M Unit is in coastdown prior to refueling. Coastdown
- 4. Nameplate Rating (Gross MWer 1152 began May 9, 1986. .
- 5. Design Electrical Ratmg INet MWeg inra i
- 6. Maximum Dependable Capacity IGross MWet in6n
- 7. Masimum Dependable Capacity (Net MWe): 1012 I
- 8. If Changes Occur in Capacity Ratings litems Number 3 Through 7) Since Last Report. Give Reasons nono
- 9. Power Level To which Restricted. lf Any (Net \lWet Mone
- 10. Reasons For Restrictions,if Any: Mon" siis Month ir .to Date Cumulatne
- 11. Ifours in Reportmg Period 720 a_ m 3 3 . no r,
- 12. Number 0f Hours Reactor Was Critical 101.n 3 ra s a . 9 10,77(, i
- 13. Reactor Rewrve Shutdown Hours 0 1 11. r, 717.9
- 14. Hours Generator On Line 275.9 3 , S ri4 to,ss9.I
- 15. Unit Rewrte Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated tMWH) 767'352 i1,221,137 33,251,935 17 Gross Electrical Energy Generated iMWHi 24H'34" 3*690'134 10.900,914
- 18. Net Electncal Energy Generated IMWH) 21? M47 3.,555,382 10,rn9,nq2 i
19 Unit Service Factor 1H.1 _
H2.1 n7.3 20 Unit Availability Factor '
3H 3 l'21 H7.3 21 Unit Capacity Factor tUung \lDC Nett 'I'3 ___
79.1 H4 J
- 22. Unit Capacity Fator IUung DER Net 10*1 76 9 "l'"
- 23. Unit Forced 0utage Rate 61 7 17.9 12.7
- 24. Shutdowns Scheduled Over Nest 6 \tonthsiType. Date,and Duration of Eac.o I>o t'unl ing out..ign: Augunt 2, l oor, t na ,1.ivn 25 If Shut Down Lt End of Heport Period. Estimated Date of Startup ff/A
- 26. Uniis in Test Status (Prior to Commercial 0perationt l'orecase whivied INiil % L CRITICTLITY INITl \L ELECTRICITY C0%tstERCl %L OPER % fl0N p
e
. _ _ ~ - _ - - . - _-- . . - _ _ _
M4 4 I I
.y .-
1 m; * *,
,'.,t w u M ' i "-R UNIT SHL'4tM)%NS AND POWER RFIMICTIONS IM)CKET NO. 50-388 ,.
g i UNIT NAME h DATE 7-8-86 g
- 004PLETED BY L.A. Kuczynski 43C 5 RgyORT MONTH T"-n 1006 TELEPHONE (717154 7 't7';9 e
' ~: .
=_ -e ~5 m 2 E
%. g u,, 1 5s { 253 R "re 5'L . Cause a C.wrcots,e c 32 2 E3E E''
i? $*l
' Actsiwi tai CO " y idi j Repwe e mO L p,,,,,, g ,g ,,,,,,,
6 5 660524 F 444.1 A ?.86-021 WE PtNPXX Unit was manually shutdown following (Unit 1 I.ER) failure of Emergency Service Water
, (ESW) pu=p "C" due to severe erosion
- of its suction bell and identifi-cation of similar erosion on ESW pump "A". Additional tasks were completed to reduce the workload of the upcomin i refueling and inspection outage.
l l
i l
I 2 3 4 F: F==ced Reasam: Mettiod:
S Scheduled Eulesbit G-Instructiims A Equeraient FailmetEuptain) I h eat for Preparati m inf Dasa B-Maintenance or Test 2 heal Sciam. Entry Sheets for tiensee C-Re' acting 3- Antumatic Scram. Fvent Repwt ILI R) File INtIRI G-D Regulat.w) Restrictans 4 Continuation 0161) f Operat.= Tramang a txense f sarnu.at** from previous inonth F.AJammstrasave 5 G Operaramal Enr.= tIuplasal 5-Reduction r*f77) Eshsbit I - Same Simesc -
IIDiner iF splam t Mtkr
b*
UNIT 2 SUSQUE11 ANNA STEAM ELECTRIC STATION Docket Number 50-388 Date 7-8-86 Completed by L.A. Kuctynski Telephone (717) 542-3759 Challenges to Main Steam Safety Italief Valves None Changes to the Offsite Dose calculation Manual None Major Change s to Radioactive Wante Treatment Systemn None
@@ Pennsylvania Power & Llght Company Two North Ninth Street
- Allentown, PA 18101 + 215 / 770 5151 Harold W. Kolser Vice President-Nuclear Operations 215/770-7502 JUL 141986 Director, Data Automation &
Management Information Division Attention: Mr. M. R. Beebe Management Information Branch office of Resouren Management U.S. Nucicar Regulatory Commission Washington, D.C. 20555 SUSQUEllANNA STEA!! ELECTRIC STATION MONTill.Y OPERATING REPORTS Docket Non. 50-387/NPF-14 P_f. A-26 7 5 FII.E R41-2A 50-388/NPF-22 Dear Mr. Beebat The Juno 1986 monthly operating reperta for Susquehanna SES Units I and 2 are attached.
Very truly yours.
L,
- 11. W. Ke iner Vice Pronident-Nuclear Operations Attachment ect Dr. Thoman E. Murley Regional Adminintrator-Region I tl.S. Nuctoar Regulatory Comminnion 631 Park Avenue King o( Prune,la, PA 19406 Director Office of Innpection and l'.nforcement t!.!!. Nuclear RcAulatory Comminnion Wanhington, D.C. 20555 Attnt Document Control Donk (12 copton)
Mr. l.. R. Plince - NRC Mn. M. J. Campagnono - NRC ,
,J .p
.