IR 05000438/1983010
ML20127J647 | |
Person / Time | |
---|---|
Site: | Bellefonte |
Issue date: | 04/11/1985 |
From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Parris H TENNESSEE VALLEY AUTHORITY |
Shared Package | |
ML20127J650 | List: |
References | |
NUDOCS 8505210535 | |
Download: ML20127J647 (1) | |
Similar Documents at Bellefonte | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20210Q6931999-08-0909 August 1999
[Table view]Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML1108302361993-05-0303 May 1993 Forwards Rev 1 to NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. Submittal Made on Behalf of Eight Utils Having Enterprize EDGs for Emergency Standby Ac Power ML18010A9501992-12-0808 December 1992 Forwards NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. Submittal Made on Behalf of Eight Utils Having Enterprise EDGs for Emergency Standby Ac Power ML18036A8701992-09-30030 September 1992 Forwards Updated Distribution Lists for Brown Ferry & Bellefonte Nuclear Plants to Reflect Recent Reorganizational Changes.Lists Should Replace Lists Sent on 920515 ML20086K0871991-12-11011 December 1991 Requests Mod of Periodicity in Which Util Conducts Annual Practice Sessions for Fire Brigade Personnel.Rev to Commitment C.3.D.6(b) of BTP Cmeb 9.5-1 Will Permit Practice Session to Be Held Annually ML20065R6891990-12-12012 December 1990 Advises That Util Intends to Reopen Simulator Training Facility at Plant Site Near Hollywood,Al.Requests That Existing NPDES Permit AL0024635 Be Modified to Include Simulator Training Facility Outfall ML20247C3771989-09-0606 September 1989 Confirms Understanding of Applicability of NRC Requirements Developed During Deferral Period of Plant ML20245D9851989-06-22022 June 1989 Forwards 21 Insp Rept Executive Summaries,Per NRC Contract NRC-03-87-029,Task Order 037.Individual Quality Evaluations of Insp Repts Also Prepared ML20246E3551989-06-21021 June 1989 Submits Plan for Quadrex Corp to Lease Plant,Complete Facility,Operate Facility,Sell Power & Eventually Return Plant to Tva.Topic Will Be Discussed at 890711 Meeting ML20248K5451989-04-0505 April 1989 Responds to 890224 & 0322 Ltrs Re NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. NRC Agrees W/Suggestion for 890407 Meeting to Discuss Util Schedular Proposal ML20247G5411989-03-24024 March 1989 Informs of Recent Changes Made within Mgt Structure of Util Organization.Util Reorganization Efforts Aimed at Implementing Changes Necessary to Reflect Reorientation from Design & Mod ML20247E4941989-03-10010 March 1989 Forwards Insp Repts 50-438/89-01 & 50-439/89-01 on 890111.No Violations or Deviations Noted ML20235A1251987-12-16016 December 1987 Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs ML20236V7341987-12-0101 December 1987 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App C ML20236V2801987-11-20020 November 1987 Informs That on 871019,Director of NRR Issued Encl Director'S Decision Which Declined to Institute Proceedings Requested by Ucs Petition,In Response to 870731 Request.W/O Encl NUREG-1231, Forwards NUREG-1231, SER Re B&W Owners Group Plant Reassessment Program. NRC Unable to Reach Final Conclusion on Acceptability of Human Factors Portion of Program. Consideration of NRC Recommendations Requested1987-11-0606 November 1987 Forwards NUREG-1231, SER Re B&W Owners Group Plant Reassessment Program. NRC Unable to Reach Final Conclusion on Acceptability of Human Factors Portion of Program. Consideration of NRC Recommendations Requested ML20235S6281987-10-0101 October 1987 Responds to Supporting Request from Smud That Commission Hold Hearing in Sacramento,Ca Re Safety of B&W Nuclear Plants.Response to Concerns Will Be Addressed When Response to Ucs Petition Issued ML20235L3261987-09-29029 September 1987 Responds to to Zech Informing That Ltrs Recently Received from Two Members of Smud Board of Directors Requesting Adjudicatory Hearing Does Not Reflect Views of Majority of Board.Nrc Responded to Kehoe & Smeloff Re Issue ML20235J5351987-09-28028 September 1987 Responds to Constituent Tf Gross Ltr Supporting Ucs 870210 10CFR2.206 Petition to Suspend OLs & CPs of Any Util Operating or Bldg Nuclear Power Reactors Designed by B&W,Per 870803 Request.Nrc Statements Re Plants Discussed ML20235J1171987-09-28028 September 1987 Responds to Requesting Info Re Ucs 870210 Petition Requesting Mods to B&W Facilities,Per E Gallizzi to Recipient Requesting Support of Petition. Gallizzi Statements Discussed.Petition Under Review ML20235B6261987-09-16016 September 1987 Responds to 870812 Request for Hearing to Address Design Flaws in Each of Five Specific Sys Identified in Ucs Petition & Ability of NRC to Evaluate & Assess Level of Danger Inherent in Continued Operation of B&W Plants ML20235B6581987-09-16016 September 1987 Responds to 870912 Request for Hearing Re Design Flaws in Five Specific Sys Identified in Ucs Petition & NRC Ability to Evaluate & Assess Level of Danger Inherent in Continued Operation of B&W Plants ML20235L3771987-08-27027 August 1987 Advises That Received from Two Smud Board of Directors Re Request for Adjudicatory Hearing Does Not Reflect Views of Majority of Board of Directors ML20237H0091987-08-12012 August 1987 Responds to Ucs Et Al 870210 Petition Requesting Public Hearing Re Sufficiency of Mods for Continued Operation of B&W Designed Nuclear Reactors.Util Requests NRC to Hold Hearing in Sacramento,Ca to Discuss Design Flaws & Dangers ML20236L1811987-08-0404 August 1987 Responds to Addressed to Chairman Zech,Requesting That Commission Keep Recipient Fully Apprised of All Developments Re Both Petition Filed by Ucs & Ongoing Reassessment of B&W Reactors.Review of Petition Continuing ML20235J5701987-08-0303 August 1987 Requests Response to Encl Constituent Tf Gross Urging Support of Ucs Petition to Suspend OLs & CPs for All B&W Nuclear Plants Pending Resolution of Extraordinary Safety Problems ML20236L2431987-07-13013 July 1987 Requests That Author Be Fully Apprised of All Developments Re Both Ucs Petition & Ongoing NRC Reassessment of B&W Reactors ML20215D6371987-06-12012 June 1987 Forwards Reply to Responses from NRC & B&W Owners Group. NRC Response Evidences No Independent Review of B&W Claims. Commission Urged to Take Personal Jurisdiction of Petition to Ensure That Latest Commitment Not Frustrated ML20214E2841987-05-18018 May 1987 Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR IA-87-221, Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR1987-05-18018 May 1987 Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR ML20214E2281987-04-16016 April 1987 FOIA Request for PRAs for Listed Plants Be Placed in PDR ML20206P5191987-04-15015 April 1987 Responds to Severity Level IV Violation Noted in Insp Repts 50-438/86-09 & 50-439/86-09.Corrective Actions:Procurement QA Branch Inspectors Conducted Addl Training in Welding Insp.Future Insp Plans Will Address Welding Requirements ML20207U0731987-03-0606 March 1987 Forwards Insp Repts 50-438/86-09 & 50-439/86-09 on 861201-870131 & Notice of Violation ML20207T4561987-02-26026 February 1987 Forwards Insp Repts 50-438/86-10 & 50-439/86-10 on 861216-18.No Violation or Deviation Noted ML20211C3231987-02-12012 February 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/86-07 & 50-439/86-07 ML20211C5251987-02-0606 February 1987 Discusses NRC Analysis of Licensing Schedules for Facility, Per Util 870202 Request for NRC Statement to State of Ca. NRC Sept 1981 - Feb 1982 Monthly Repts to Congress Re Licensing Projections for Pending OL Applications Encl ML20209D7441987-01-28028 January 1987 Responds to NRC Re Violations in Noted Insp Repts 50-438/86-07 & 50-439/86-07.Corrective Actions: Requirements for Timely Documenting of Conditions Adverse to Quality Reviewed by Involved Supervisors ML18031B1361987-01-16016 January 1987 Forwards Updates of TVA Activities for Wks of 870119 & 26 ML20212F4541986-12-29029 December 1986 Forwards Insp Repts 50-438/86-07 & 50-439/86-07 on 861001-1130 & Notice of Violation ML20215A1581986-12-0909 December 1986 Final FOIA Response to Request for Documents Re Welding,Mfg & Const Deficiencies Concerning Tdi.Forwards App E Documents.Documents Also Available in PDR ML18031B0011986-11-14014 November 1986 Forwards Updates of TVA Activities for Wks of 861117 & 24 ML20215K5601986-10-16016 October 1986 Notifies of Util Commitments on Response to IE Bulletin 85-001 Re Steam Binding of Auxiliary Feedwater Pumps. Procedures to Be Developed Will Meet Intent of Bulletin Re Monitoring Fluid Conditions & Recognizing Binding IR 05000438/19860041986-08-0606 August 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/86-04 & 50-439/86-04 ML20198E2981986-05-20020 May 1986 Discusses Points of View & Concerns Expressed in Ucs Press Release & Re B&W Reactors,Including Plan Responsiveness,Auxiliary Feedwater Sys & Integrated Control Sys.Achievement of Goals Will Reduce Ucs Concerns ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20141A3541986-03-13013 March 1986 Addl Response to FOIA Request for Documents Re Delays or Progress on Const.App C Documents Available in PDR ML20154M2591986-02-18018 February 1986 Discusses SER of Rev 1 to BAW-1847 & BAW-1889P Re Elimination of Postulated Pipe Breaks in PWR Primary Main Loops.Repts Acceptable.Leakage Detection Sys Info Requested ML20137Y0581986-02-18018 February 1986 Requests facility-specific Info Re Requests for Exemption from GDC 4,concerning Protection Against Dynamic Loads Resulting from Postulated Breaks of Primary Main Loop Piping.Info Re Leakage Detection Sys Should Be Included ML20137Y0431986-02-18018 February 1986 Discusses Safety Evaluation of B&W Owners Group Repts Dealing W/Elimination of Postulated Pipe Breaks in PWR Primary Main Loops.Exemption from GDC 4 & Demonstration That Leakage Sys in Compliance W/Reg Guide 1.45 Needed ML20199F2381986-02-0404 February 1986 FOIA Request for All Documents Re Delays or Progress of Const at Bellefonte Nuclear Plant,Including Const Schedules or Projections & Const Status Repts 1999-08-09 Category:NRC TO UTILITY MONTHYEARML20248K5451989-04-0505 April 1989
[Table view]Responds to 890224 & 0322 Ltrs Re NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. NRC Agrees W/Suggestion for 890407 Meeting to Discuss Util Schedular Proposal ML20247E4941989-03-10010 March 1989 Forwards Insp Repts 50-438/89-01 & 50-439/89-01 on 890111.No Violations or Deviations Noted NUREG-1231, Forwards NUREG-1231, SER Re B&W Owners Group Plant Reassessment Program. NRC Unable to Reach Final Conclusion on Acceptability of Human Factors Portion of Program. Consideration of NRC Recommendations Requested1987-11-0606 November 1987 Forwards NUREG-1231, SER Re B&W Owners Group Plant Reassessment Program. NRC Unable to Reach Final Conclusion on Acceptability of Human Factors Portion of Program. Consideration of NRC Recommendations Requested ML20235L3261987-09-29029 September 1987 Responds to to Zech Informing That Ltrs Recently Received from Two Members of Smud Board of Directors Requesting Adjudicatory Hearing Does Not Reflect Views of Majority of Board.Nrc Responded to Kehoe & Smeloff Re Issue ML20235B6261987-09-16016 September 1987 Responds to 870812 Request for Hearing to Address Design Flaws in Each of Five Specific Sys Identified in Ucs Petition & Ability of NRC to Evaluate & Assess Level of Danger Inherent in Continued Operation of B&W Plants ML20235B6581987-09-16016 September 1987 Responds to 870912 Request for Hearing Re Design Flaws in Five Specific Sys Identified in Ucs Petition & NRC Ability to Evaluate & Assess Level of Danger Inherent in Continued Operation of B&W Plants ML20207U0731987-03-0606 March 1987 Forwards Insp Repts 50-438/86-09 & 50-439/86-09 on 861201-870131 & Notice of Violation ML20207T4561987-02-26026 February 1987 Forwards Insp Repts 50-438/86-10 & 50-439/86-10 on 861216-18.No Violation or Deviation Noted ML20211C3231987-02-12012 February 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/86-07 & 50-439/86-07 ML20212F4541986-12-29029 December 1986 Forwards Insp Repts 50-438/86-07 & 50-439/86-07 on 861001-1130 & Notice of Violation IR 05000438/19860041986-08-0606 August 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/86-04 & 50-439/86-04 ML20137Y0431986-02-18018 February 1986 Discusses Safety Evaluation of B&W Owners Group Repts Dealing W/Elimination of Postulated Pipe Breaks in PWR Primary Main Loops.Exemption from GDC 4 & Demonstration That Leakage Sys in Compliance W/Reg Guide 1.45 Needed ML20137Y0581986-02-18018 February 1986 Requests facility-specific Info Re Requests for Exemption from GDC 4,concerning Protection Against Dynamic Loads Resulting from Postulated Breaks of Primary Main Loop Piping.Info Re Leakage Detection Sys Should Be Included ML20154M2591986-02-18018 February 1986 Discusses SER of Rev 1 to BAW-1847 & BAW-1889P Re Elimination of Postulated Pipe Breaks in PWR Primary Main Loops.Repts Acceptable.Leakage Detection Sys Info Requested ML20135J0521985-08-26026 August 1985 Ltr Contract NRC-05-84-153,Mod 3,revising Scope of Work,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators IR 05000438/19850021985-05-28028 May 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/85-02 & 50-439/85-02 IR 05000438/19840211985-04-22022 April 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/84-21 & 50-439/84-21 IR 05000438/19830101985-04-11011 April 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Insp Repts 50-438/83-10 & 50-439/83-10 ML20062H9001982-08-0909 August 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-438/82-12 ML20058G1671982-07-28028 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-438/82-16 & 50-439/82-16 ML20058H4881982-07-26026 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-438/82-14 & 50-439/82-14 ML20062J1301982-07-23023 July 1982 Forwards IE Insp Repts 50-438/82-19 & 50-439/82-19 on 820601-30.No Noncompliance Noted ML20058G5741982-07-22022 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-438/82-11 ML20058G1321982-07-0202 July 1982 Forwards IE Insp Repts 50-438/82-15 & 50-439/82-15 on 820607-10.No Noncompliance Noted ML20054M9561982-06-21021 June 1982 Forwards IE Insp Repts 50-438/82-13 & 50-439/82-13 on 820510-14.No Noncompliance Noted ML20058G1931982-06-18018 June 1982 Forwards IE Insp Repts 50-438/82-16 & 50-439/82-16 on 820501-31 & Notice of Violation ML20058H5181982-06-16016 June 1982 Forwards IE Insp Repts 50-438/82-14 & 50-439/82-14 on 820511-14 & Notice of Violation ML20054G9791982-06-0909 June 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-438/82-09 & 50-439/82-09 ML20058G6411982-06-0303 June 1982 Forwards IE Insp Rept 50-438/82-11 & 50-439/82-11 on 820426-29 & Notice of Violation ML20062H9371982-05-21021 May 1982 Forwards IE Insp Repts 50-438/82-12 & 50-439/82-12 on 820401-30 & Notice of Violation ML20054H0031982-04-22022 April 1982 Forwards IE Insp Repts 50-438/82-09 & 50-439/82-09 on 820301-31 & Notice of Violation 1989-04-05 Category:OUTGOING CORRESPONDENCE MONTHYEARML20248K5451989-04-0505 April 1989
[Table view]Responds to 890224 & 0322 Ltrs Re NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. NRC Agrees W/Suggestion for 890407 Meeting to Discuss Util Schedular Proposal ML20247E4941989-03-10010 March 1989 Forwards Insp Repts 50-438/89-01 & 50-439/89-01 on 890111.No Violations or Deviations Noted ML20236V7341987-12-0101 December 1987 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App C ML20236V2801987-11-20020 November 1987 Informs That on 871019,Director of NRR Issued Encl Director'S Decision Which Declined to Institute Proceedings Requested by Ucs Petition,In Response to 870731 Request.W/O Encl NUREG-1231, Forwards NUREG-1231, SER Re B&W Owners Group Plant Reassessment Program. NRC Unable to Reach Final Conclusion on Acceptability of Human Factors Portion of Program. Consideration of NRC Recommendations Requested1987-11-0606 November 1987 Forwards NUREG-1231, SER Re B&W Owners Group Plant Reassessment Program. NRC Unable to Reach Final Conclusion on Acceptability of Human Factors Portion of Program. Consideration of NRC Recommendations Requested ML20235S6281987-10-0101 October 1987 Responds to Supporting Request from Smud That Commission Hold Hearing in Sacramento,Ca Re Safety of B&W Nuclear Plants.Response to Concerns Will Be Addressed When Response to Ucs Petition Issued ML20235L3261987-09-29029 September 1987 Responds to to Zech Informing That Ltrs Recently Received from Two Members of Smud Board of Directors Requesting Adjudicatory Hearing Does Not Reflect Views of Majority of Board.Nrc Responded to Kehoe & Smeloff Re Issue ML20235J5351987-09-28028 September 1987 Responds to Constituent Tf Gross Ltr Supporting Ucs 870210 10CFR2.206 Petition to Suspend OLs & CPs of Any Util Operating or Bldg Nuclear Power Reactors Designed by B&W,Per 870803 Request.Nrc Statements Re Plants Discussed ML20235J1171987-09-28028 September 1987 Responds to Requesting Info Re Ucs 870210 Petition Requesting Mods to B&W Facilities,Per E Gallizzi to Recipient Requesting Support of Petition. Gallizzi Statements Discussed.Petition Under Review ML20235B6261987-09-16016 September 1987 Responds to 870812 Request for Hearing to Address Design Flaws in Each of Five Specific Sys Identified in Ucs Petition & Ability of NRC to Evaluate & Assess Level of Danger Inherent in Continued Operation of B&W Plants ML20235B6581987-09-16016 September 1987 Responds to 870912 Request for Hearing Re Design Flaws in Five Specific Sys Identified in Ucs Petition & NRC Ability to Evaluate & Assess Level of Danger Inherent in Continued Operation of B&W Plants ML20236L1811987-08-0404 August 1987 Responds to Addressed to Chairman Zech,Requesting That Commission Keep Recipient Fully Apprised of All Developments Re Both Petition Filed by Ucs & Ongoing Reassessment of B&W Reactors.Review of Petition Continuing IA-87-221, Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR1987-05-18018 May 1987 Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR ML20214E2841987-05-18018 May 1987 Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR ML20207U0731987-03-0606 March 1987 Forwards Insp Repts 50-438/86-09 & 50-439/86-09 on 861201-870131 & Notice of Violation ML20207T4561987-02-26026 February 1987 Forwards Insp Repts 50-438/86-10 & 50-439/86-10 on 861216-18.No Violation or Deviation Noted ML20211C3231987-02-12012 February 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/86-07 & 50-439/86-07 ML20211C5251987-02-0606 February 1987 Discusses NRC Analysis of Licensing Schedules for Facility, Per Util 870202 Request for NRC Statement to State of Ca. NRC Sept 1981 - Feb 1982 Monthly Repts to Congress Re Licensing Projections for Pending OL Applications Encl ML20212F4541986-12-29029 December 1986 Forwards Insp Repts 50-438/86-07 & 50-439/86-07 on 861001-1130 & Notice of Violation ML20215A1581986-12-0909 December 1986 Final FOIA Response to Request for Documents Re Welding,Mfg & Const Deficiencies Concerning Tdi.Forwards App E Documents.Documents Also Available in PDR IR 05000438/19860041986-08-0606 August 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/86-04 & 50-439/86-04 ML20141A3541986-03-13013 March 1986 Addl Response to FOIA Request for Documents Re Delays or Progress on Const.App C Documents Available in PDR ML20137Y0431986-02-18018 February 1986 Discusses Safety Evaluation of B&W Owners Group Repts Dealing W/Elimination of Postulated Pipe Breaks in PWR Primary Main Loops.Exemption from GDC 4 & Demonstration That Leakage Sys in Compliance W/Reg Guide 1.45 Needed ML20154M2591986-02-18018 February 1986 Discusses SER of Rev 1 to BAW-1847 & BAW-1889P Re Elimination of Postulated Pipe Breaks in PWR Primary Main Loops.Repts Acceptable.Leakage Detection Sys Info Requested ML20137Y0581986-02-18018 February 1986 Requests facility-specific Info Re Requests for Exemption from GDC 4,concerning Protection Against Dynamic Loads Resulting from Postulated Breaks of Primary Main Loop Piping.Info Re Leakage Detection Sys Should Be Included ML20135J0521985-08-26026 August 1985 Ltr Contract NRC-05-84-153,Mod 3,revising Scope of Work,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators IA-85-503, Responds to FOIA Request for Two Specified Repts to Be Placed in Pdr.App Identifies Two Repts Placed in PDR1985-07-27027 July 1985 Responds to FOIA Request for Two Specified Repts to Be Placed in Pdr.App Identifies Two Repts Placed in PDR ML20136H8821985-07-27027 July 1985 Responds to FOIA Request for Two Specified Repts to Be Placed in Pdr.App Identifies Two Repts Placed in PDR IR 05000438/19850021985-05-28028 May 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/85-02 & 50-439/85-02 IR 05000438/19840211985-04-22022 April 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-438/84-21 & 50-439/84-21 IR 05000438/19830101985-04-11011 April 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Insp Repts 50-438/83-10 & 50-439/83-10 ML20062H9001982-08-0909 August 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-438/82-12 ML20058G1671982-07-28028 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-438/82-16 & 50-439/82-16 ML20058H4881982-07-26026 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-438/82-14 & 50-439/82-14 ML20062J1301982-07-23023 July 1982 Forwards IE Insp Repts 50-438/82-19 & 50-439/82-19 on 820601-30.No Noncompliance Noted ML20058G5741982-07-22022 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-438/82-11 ML20058G1321982-07-0202 July 1982 Forwards IE Insp Repts 50-438/82-15 & 50-439/82-15 on 820607-10.No Noncompliance Noted ML20054M9561982-06-21021 June 1982 Forwards IE Insp Repts 50-438/82-13 & 50-439/82-13 on 820510-14.No Noncompliance Noted ML20058G1931982-06-18018 June 1982 Forwards IE Insp Repts 50-438/82-16 & 50-439/82-16 on 820501-31 & Notice of Violation ML20058H5181982-06-16016 June 1982 Forwards IE Insp Repts 50-438/82-14 & 50-439/82-14 on 820511-14 & Notice of Violation ML20054G9791982-06-0909 June 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-438/82-09 & 50-439/82-09 ML20058G6411982-06-0303 June 1982 Forwards IE Insp Rept 50-438/82-11 & 50-439/82-11 on 820426-29 & Notice of Violation ML20062H9371982-05-21021 May 1982 Forwards IE Insp Repts 50-438/82-12 & 50-439/82-12 on 820401-30 & Notice of Violation ML20054H0031982-04-22022 April 1982 Forwards IE Insp Repts 50-438/82-09 & 50-439/82-09 on 820301-31 & Notice of Violation ML20211C6001981-12-30030 December 1981 Forwards Fourteenth Monthly Status Rept for 811115-811215, Discussing Actions Taken on Operating Reactors & Licensing Reviews of New Facilities.Aslb Issued 811214 Partial Initial Decision Re TMI-1 Design,Procedures & Emergency Planning 1989-04-05 |
Inspection Report - Bellefonte - 1983010 | |
---|---|
Assessments
|
Text
_-
. *
'
.. *
.
APR 111985 Tennessee Valley Authority ATTN: Mr. lj. G. Parris Manager of Power and Engineering 500A Chestnut Street Tower II Chattanooga, TN 37401 Gentlemen:
SUBJECT: REPORT NOS. 50-438/83-10 AND 50-439/83-10-Thank you for your supplemental response of March 28, 1985, to our Notice of
-
Deviation issued on May 23, 1983, concerning activities conducted at your Belleft. ate : facilit We will examine the implementation of your corrective actions di: ring future inspection We-appreciate your cooperation in this matte
Sincerely, Roger D. Walker, Director Division of Reactor Projects cc: E. A. Condon, Bellefonte Nuclear Plant Engineering Coordinator A. M. Qualls, Plant Manager J. W. Anderson, Manager Office of Quality Assurance K. W. Whitt, Chief, Nuclear Safety Staff W. R. Brown, Jr. , Bellefonte Nuclear Plant Project Manager D. L. Williams, Jr. , Supervisor Licensing Section K. D. Mali, Project Engineer L. S.-Cox, Construction Project Manager bec: NRC Resident Inspector Document Control Desk State of Alabama T. Conlon W. Miller RII RII RII 19cf AIgn(atonis:Jw SWeise DVerrelli 4/to/85 4/so /85 4/1o/85
8505210535 850411 DR ADOCK 050
'
g g/ _ _ - _ - . - . __ -- ,.. _ __ . _ _ . - _ - - _ . . _ . . - -