IR 05000438/1983010

From kanterella
Revision as of 03:13, 22 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Insp Repts 50-438/83-10 & 50-439/83-10
ML20127J647
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 04/11/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20127J650 List:
References
NUDOCS 8505210535
Download: ML20127J647 (1)


Text

_-

. *

'

.. *

.

APR 111985 Tennessee Valley Authority ATTN: Mr. lj. G. Parris Manager of Power and Engineering 500A Chestnut Street Tower II Chattanooga, TN 37401 Gentlemen:

SUBJECT: REPORT NOS. 50-438/83-10 AND 50-439/83-10-Thank you for your supplemental response of March 28, 1985, to our Notice of

-

Deviation issued on May 23, 1983, concerning activities conducted at your Belleft. ate : facilit We will examine the implementation of your corrective actions di: ring future inspection We-appreciate your cooperation in this matte

Sincerely, Roger D. Walker, Director Division of Reactor Projects cc: E. A. Condon, Bellefonte Nuclear Plant Engineering Coordinator A. M. Qualls, Plant Manager J. W. Anderson, Manager Office of Quality Assurance K. W. Whitt, Chief, Nuclear Safety Staff W. R. Brown, Jr. , Bellefonte Nuclear Plant Project Manager D. L. Williams, Jr. , Supervisor Licensing Section K. D. Mali, Project Engineer L. S.-Cox, Construction Project Manager bec: NRC Resident Inspector Document Control Desk State of Alabama T. Conlon W. Miller RII RII RII 19cf AIgn(atonis:Jw SWeise DVerrelli 4/to/85 4/so /85 4/1o/85

8505210535 850411 DR ADOCK 050

'