Text
F
,
,,
,,,
,
,
JUN 18 -1982
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
Subject: Report Nos. b 8 k and 50-439/82-16
This refers to the routine safety inspection conducted by Mr. J. D. Wilcox, Jr.
of this office on May 1-31, 1982, of activities authorized by NRC Construction
Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility. Our preliminary
findings were discussed with Mr. W. R. Dahnke, Project Manager, at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
Three new unresolved items are identified in the enclosed inspection report.
These items will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will-
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter. Such application must be consistent with the requirements of
2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
1
0$$0hjyg
\\
- .
m
i
'
.
JUN 18 1982
Tennessee Valley Authority
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M
F. J. Long, Acting Chief
Reactor Projects Branch 1
Division of Project and
Resident Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos.
50-438/82-16 and 50-439/82-16
cc w/encls:
H. J. Green, Director of Nuclear Power
W. P. Kelleghan, Project Manager
J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E. Wills, Project Engineer
W. R. Dahnke, Project Manager
H. N. Culver, Chief, Nuclear
.
Safety Review Staff
>
bcc w/encis:
Document Management Branch
,
l
State of Alabama
.
l
@
i
l
R
RI
~ RI
RI
,
JD 'lcox:gr
R\\Crlenjak
DRQuj k
FJL
6/
/82
6/[g/82
6//g/82
6/ /82
L
.