ML20058G193

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-438/82-16 & 50-439/82-16 on 820501-31 & Notice of Violation
ML20058G193
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 06/18/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20058G169 List:
References
NUDOCS 8208030231
Download: ML20058G193 (2)


See also: IR 05000438/1982016

Text

F

,

,,

,,,

,

,

JUN 18 -1982

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nos. b 8 k and 50-439/82-16

This refers to the routine safety inspection conducted by Mr. J. D. Wilcox, Jr.

of this office on May 1-31, 1982, of activities authorized by NRC Construction

Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility. Our preliminary

findings were discussed with Mr. W. R. Dahnke, Project Manager, at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

Three new unresolved items are identified in the enclosed inspection report.

These items will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will-

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

1

0$$0hjyg

PDR

\\

- .

m

i

'

.

JUN 18 1982

Tennessee Valley Authority

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

F. J. Long, Acting Chief

Reactor Projects Branch 1

Division of Project and

Resident Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos.

50-438/82-16 and 50-439/82-16

cc w/encls:

H. J. Green, Director of Nuclear Power

W. P. Kelleghan, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. Wills, Project Engineer

W. R. Dahnke, Project Manager

H. N. Culver, Chief, Nuclear

.

Safety Review Staff

>

bcc w/encis:

Document Management Branch

,

l

State of Alabama

.

l

@

i

l

R

RI

~ RI

RI

,

JD 'lcox:gr

R\\Crlenjak

DRQuj k

FJL

6/

/82

6/[g/82

6//g/82

6/ /82

L

.