Forwards IE Insp Repts 50-438/82-09 & 50-439/82-09 on 820301-31 & Notice of Violation
ML20054H003
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 04/22/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20054G980 List:
References
NUDOCS 8206220484
Download: ML20054H003 (2)


See also: IR 05000438/1982009

Text

-

.. .

. ,

<

4//w

a..._~..

APR 2 21992

1

Tennessee Valley Authority

ATTH: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report No 38/82- D nd 50-439/82-09

This refers to the routine safety inspection conducted by Mr. J. D. Wilcox, Jr.

of this office on 11 arch 1-31,1982, of activities authorized by NRC Construction

Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility. Our preliminary

findings were discussed with 11r. W. R. Dahnke, Project Manager, at the conclu-

sion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

j requirements are listed in the Notice of Violation enclosed herewith as

'

Appendix A. Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

Three new unresolved items are identified in the enclosed inspection report.

These items will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold infonnation contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

2.790(b)(1).

i

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

8206220484 820609

PDR ADOCK 05000438

G PDR

. Tennessee Val .y Authority 2 APR 2 g 1982

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/

F. J. Long, Acting Chief

Reactor Projects Branch 1

Division of Project and

Resident Programs

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report Nos. 50-438/82-09

and 40-439/82-09

cc w/encis:

H. J. Green, Director of Nuclear Power

A. M. Qualls, Plant Superintendent

W. R. Dahnke, Project Manager

D. L. Terrill, Project Engineer

J. F. Cox, Supervisor, Nuclear

Licensing Section

H. N. Culver, Chief, Nuclear Safety

Review Staf f

bcc w/encls:

NRC Resident Inspector

Document Management Branch

State of Alabama

RI RP RI R :PRP RI

JW'ilcodgr RVCrlenjak RQuic- FJ Long

4/7/PS2 4/Sl462 4/]&92 44%f82